Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


852 Blog Posts Since 2003
Go to Page: 1 | ... 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 ... 86
Search JDLand Blog Posts by Date or Category

Demolition has begun of the old Capper Community Center at 5th and K--this will eventually be replaced with a new two-story 28,000-sq-ft center (see renderings on my page) that will include a daycare facility for 66 children, a rec center, a computer lab, a gym, a game room, and meeting/classrooms. I'm told that the Spring 2007 issue of Architecture DC has an article about the center and some renderings, but it's not online and I haven't seen the print version yet; I'll post it here when it's available on their site. I'll add photos of the demolition soon.
UPDATE, 3/24: Oops, meant to mention that the Community Center's demolition was completedearlier this week. Its page has been updated again with photos, and it's now Addition #116 to my Demolished Buildings page.
More posts: Community Center
 

Monday's Examiner ran a piece called "S.W. Real Estate Market Dead, Agent Says", trying to tie what one realtor says is a soft market in Southwest to a supposed larger idea of difficulty selling near the new Nats ballpark. Putting aside that a photo caption says (incorrectly) that the stadium is in Southwest (I'd like a dollar every time that mistake gets made--geez people, look at a frickin' map), I think people should be aware that the Southwest and Near Southeast markets are vastly different, even if they're only separated by a single (albeit wide) street. Near Southeast is now an emptied-out neighborhood basically being rebuilt from scratch, while Southwest is an established residential community with a lot of (somewhat dated) housing stock and not many amenities, at least not until Waterside Mall and the Southwest Waterfront get redeveloped. So it might be hard to entice people to buy in the area of Southwest close to the stadium where the homes are older and the neighborhood slightly sketchier when on the horizon they can see brand new townhomes or condos surrounded by retail spaces coming down the pike in 18 months or so. Southwest has gotten many raw deals in this city's history, and right now they may continue to see the ballpark-related redevelopment rush pass them by somewhat--but if the developers of the new Southwest Waterfront and Waterside Mall can navigate the sometimes treacherous road of getting buy-in from Southwest residents, the possibilities are certainly there for Southwest to have its own renaissance, completely separate from a ballpark that many of its residents didn't want as a neighbor anyway.
UPDATE: A correspondent rightly notes that a distinction should be made between the residential area of Southwest and Buzzards Point, the gritty industrial area south of R Street SW; Buzzards Point actually has more in common with Near Southeast (old industrial, no residential, scramble by developers looking to redevelop and bring in condos, mixed-use, etc.) than it does with its brethren directly to the north.
More posts: Nationals Park
 

There hasn't been any announced movement on either office building planned for Square 697 (the block bounded by South Capitol, K, L, and Half), but I decided it was time to build (or, more accurately, I got guilted into building) a new page detailing 1015 Half Street and 1000 South Capitol. 1015 Half is the 440,000-sq-ft building planned for the site of the old "Nation" nightclub, and since they do at least have a "Coming Soon" banner hung on the north facade and have applied for raze permits, they get the additional honor of being added to the main projects map on my home page (where space is so very limited). 1000 South Capitol is Lerner Enterprises' proposed 300,000-sq-ft office building, but other than a rendering and some contact info on the Lerner web site, there's precious little additional information about this project. Of course, these new pages have photos on them as well.
 

Word has coming pouring in this afternoon from various boots on the ground (we'll give co-credit to readers Frank and Dave) that a sign announcing "Coming Soon - FedEx/Kinkos" has appeared in the window just to the left of the 20 M Street entrance (as they once again wait until I am just out of sight to hang the advertisement). Those who are hoping for a restaurant will have to continue to keep their fingers crossed.

More posts: 20 M, Retail
 

I gave you new stadium, Monument Half Street, and 20 M photos yesterday; today I've posted new Community Center and DOT HQ shots, including some pretty neat ones of the new New Jersey Ave. and Tingey Street intersection (amazing what bright sunlight can do for a bunch of buildings and fresh asphalt!). I also added to the 20 M page new shots of the festive scrolling information sign they've installed over the main entrance, as well as the "Coming Soon - Wachovia" sign that I missed by minutes when taking my pictures on Sunday. You can also see on one page all the photos from yesterday and today that I've posted.
 

Monday's Post mines the changes in Near Southeast with another A1 story, "The Far Side of Rebirth." No new pieces of news, just interviews with people who've been in the neighborhood a long time, plus some new arrivals (hi Scott!). For those of you arriving here at JDLand.com after reading the article, you might want to visit my Capper/Carrollsburg, Nats Ballpark and Capitol Hill Tower pages for more information on the projects mentioned in the story, and you can also see photos of the St. Paul's AUMP Church, the Market Deli, Bennie Meeks' firewood lot, and even the horse stables under the freeway, and the changes occurring around them that I've been documenting since 2003.
 

Still working my way through the pile of pictures I took today.... New shots posted of the ongoing work at the Monument Half Street site, and also some "substantially complete" shots of 20 M Street--in a couple photos you can see men working on the far left window on M Street, and a reader gave me a heads up that not more than a few minutes after I came through, they posted a sign saying "Wachovia Coming Soon." So, if that's indeed the case, that would be the first 20 M tenant we've heard of.
 

A beautiful if chilly late winter day today drew me out for a belated update to the Nats Ballpark Construction Gallery (I was out of town; don't shoot me for being a week late!).
Speaking of construction, Saturday's Washington Times reports that the DC auditor has determined (to the chagrin of David Catania, no doubt) that the stadium remains beneath the mandated $611 million budget cap: "Nichols said budget projections for certain parts of the project have increased, but that the overall project remains on budget. [...] But Nichols said these new costs do not violate the cost cap, because the city was able to make up the difference in savings or reductions to other budget items. Commission budget figures show the city spent about $17 million less than estimates on financing for the stadium and about $2 million less than estimates on installation of utilities. The commission also reduced its contingency for the project from $19 million to about $9 million. Several council members including David Catania, at-large Independent, have claimed that the sports commission should include the cost of improvements to Metro and roadwork as part of the ballpark budget. But Nichols said those costs, which total $36 million, are not part of the $611 million budget. "
More posts: Nationals Park
 

The DC Property Sales database reports that, on January 29, "noted" DC developer Douglas Jemal (in the form of Jemal's Ballpark LLC, Douglas Development) paid $4.25 million for 1201-1225 South Capitol Street, the two one-story gray buildings that run on the west side of South Capitol between M and N streets. Haven't heard anything about any plans for the site; it's currently home to a couple of small businesses. Jemal already owns a number of somewhat-close-to-the-stadium properties down in Buzzards Point.
More posts: South Capitol St.
 

While you ponder the upcoming Zoning Commission vote on the 1325 South Capitol Street residential project, you can gaze at a new drawing of the building, nicked from the WDG Architecture web site. It's certainly a much more detailed and spiffier rendering than what was previously released....

 

On Wednesday March 21, the AWC is holding an Anacostia Riverwalk Trail and Parks Public Meeting; to quote from the announcement, "The Anacostia Riverwalk is a continuous 20 mile trail system that will link public parks, plazas, and neighborhoods to the Anacostia River. A major section of the trail is due to be completed this year. Come learn about the Riverwalk and the many new parks to be built along the Anacostia Waterfront." There's an open house at 6 pm, with the presentation and discussion from 6:30-8 pm; it's at the Ellen Wilson Center at 750 6th Street SE (just north of the freeway). For more information, contact: Diane Sullivan, Project Director, at (202) 406-4028 or diane.sullivan@awcdc.com. (This announcement isn't yet posted on the AWC web site, so no link, alas.)

 

The Zoning Commission has deferred until its March 26 Special Public Meeting any decision on whether to allow Capper Seniors #2 to be redesignated as a mutlifamily workforce (30%-60% annual median income) dwelling in addition to having its low-income senior citizens units. ZC chair Carol Mitten noted a bit of a disconnect between statements offered by the DC Housing Authority and the Office of Planning, and so both are to meet before March 26 to formulate a recommendation.
The March 26 special meeting will also have the ZC's final vote on the 1325 South Capitol Street residential project, and also the "minor modification" being requested at 100 M Street.
And, since I gave the Office of Zoning a bit of a hammering a few weeks back when they debuted their new online calendar, it's only fair that I now rave over the return of monthly at-a-glance lists for Zoning Commission and BZA meetings, which make finding out what's happening far far easier. Thanks, guys, not only is it great to see this functionality back, but you did a really nice job with it, too.
 

Another building has bitten the dust on the Monument Half Street site, and I think everyone can agree it will not be lamented on its death--it's the brown cinderblock building just north of the N Street intersection, and it's now been immortalized on my Demolished Buildings page. And, thanks to Camera 2 of the Clark/Hunt/Smoot Stadium Construction Cam, we can see that it breathed its last between 11:11 and 11:22 this morning, March 15. (I'm pretty sure I'm the only one using that camera to not watch the stadium construction!) They appear to be working around the temporary WMATA lot that they built just north of the cinder-shed; at the same time, work appears to be nearly complete on the next WMATA temporary lot, over at 1236 South Capitol (formerly home to the neon yellow bungalow, just south of the storage company).There's a zoning hearing on April 23 for permanent approval of the new temporary lot (it was approved on an emergency basis back in November).
 

On Wednesday a "shoring and sheeting" building permit application was filed for 1001 First Street, which is on the block known as Square 699N, bounded by 1st, Half, K, and L streets. It was bought in September 2005 by local developer Ron Cohen for $51 million, and was the home to nightclubs Wet, Edge, and Club 55, along with various other small businesses that slowly moved out until the block was left vacant in September 2006. As for the building permit app, shoring and sheeting is how the walls of a big hole in the ground are held up during excavation (I hope that isn't too technical of an explanation), and is another sign that Cohen is getting his ducks in a row to do .... something .... on this lot, as were the public space permits that were granted in December 2006 for the necessary water and sewer shut-off work on the site. I haven't seen evidence of raze permits, but I only started seeing those in Fall 2006 and it's possible that they were applied for earlier. What I did notice during a drive-by today is that all of the trees on the block--including a pretty huge one at 1st and L--have been chopped down (I'm pretty sure within the past week). Will we hear word of Cohen's plans soon?
(I was hoping to give you an equally enticing report on a building permit app filed for 83 M Street, the Normandie Liquors lot at 1st and M, but apparently it's for the placement of a construction trailer, which I'm guessing is for Monument's Half Street project, though I don't know for sure. Ah well.)
 

An Associated Press story, popping up all over the Internets today: "Come next April, Ryan Zimmerman might become the first player in major league history to hit a home run into a cherry tree. A grove of cherry blossoms behind the left field bleachers is one of the latest additions to the plans of the ever-evolving Washington Nationals ballpark. 'We couldn't find another ballpark that had trees in the ballpark,' team president Stan Kasten said Tuesday at the launch of a campaign to sell luxury suites. " If you look at some of the renderings I've posted, you'll see that trees have been in the design for a while, but I guess they decided now would be a good time to mention them (since the cherry blossoms are about to bloom here in town). In other stadium-related news, apparently there's new video demonstrating what the view will be like on the stadium concourse and in the suites (created for this suites sales campaign, I imagine). I'm still looking for an online version of it (Fox 5 news showed it on the air earlier today), will post when I have it.
UPDATE: Here's the new virtual tour of the stadium concourse and suites, from NBC4.
UPDATE II: And here's the Post's story on the cherry trees and the suites. And it mentions: "Team owner Theodore N. Lerner has said he will spend tens of millions to upgrade many of the stadium's amenities, including an outfield restaurant plaza, stone finishes behind home plate, bathrooms and glass partitions in the luxury suites, and the installation of a high-definition scoreboard. One goal is to have a giant baseball above the two-story outfield sports bar capable of projecting 360-degree replays of home runs and other highlights."

More posts: Nationals Park
 

From the Examiner: "The [Anacostia Waterfront Corporation] and [National Capital Revitalization Corporation] are the targets of a public hearing scheduled at 10 a.m. today before the council's economic development committee to help determine the fate of both agencies. Council Member Jack Evans, D-Ward 2, introduced legislation in January that seeks to dissolve both agencies and transfer their assets to the mayor's office." That's a better lede to their story than what they actually used: "Drive down to the area around the new Washington Nationals baseball stadium being constructed on the Anacostia Waterfront today, and it's hard to believe it's someday supposed to be a city showcase." Bah. The hearings aren't being shown on DC Cable 13 or via streaming video (a welcome reprieve for a sick blogger); I'll update this entry as news from the session comes out.
UPDATE: Here's the first story out, from the Washington Business Journal:"A pair of highly scrutinized D.C. development agencies received high marks from some community activists Tuesday, but city officials still aren't convinced the organizations are getting the job done. [...] 'I have had a steady stream of disgruntled and unhappy economic development people coming to my office complaining about these organizations,' [Jack] Evans says. 'We are here today to figure out how to make this work.' "
 

A little birdie was kind enough to pass along a URL for the "Capitol Riverfront Business Improvement District", the BID in its initial organization phase that's slated to cover the entire Near Southeast footprint. (I'm not letting them rename my Hood just yet.) Right now there's only an Executive Summary posted, but it's certainly chock full of information about what's planned for the area, and how important a BID would be (they seem to be fixated on how dirty the neighborhood currently is). The city council must approve the creation of a BID, so this document is very much focused on persuading The Powers That Be that this BID is necessary; it's chock full of vision statements, goals, boundaries, number crunching, yadda yadda yadda. But considering that the initial directors of the BID are heavy hitters from WC Smith, Forest City Washington, Monument Realty, JBG, and Potomac Investment Properties, it's clear that there's plenty of muscle behind this proposal. But if you don't care about any of that, at least check out the cool previously unseen renderings of the Nats ballpark (on page 15) and the proposed Canal Park on the back cover (I'm adding the renderings to my project pages as well). You can see my previous entry about the formation of this BID (and more about what the heck a BID is) here. But definitely browse through the BID's Executive Summary, they clearly mean business [ahem].
 

A press release today from Lerner Enterprises: "Lerner Enterprises, Washington D.C.'s largest private real estate developer, is pleased to announce the substantial completion of 20 M Street, SE, a 190,600 square foot 10-story Class 'A' office building located in Washington D.C.'s Southeast Corridor. 20 M Street is situated across from the Navy Yard Metro and two blocks from the new ballpark of the Washington Nationals." The press release touts the building's views of the Capitol and the Nats Ballpark, and its LEED Gold rating by the US Green Building Council. Missing from the release, it should be noted, is any announcement of tenants for the building; as of now, none have been announced that I've heard. As for "substantially completed", the building itself doesn't look 100% open for business, but the sidewalks are now completed and open, so I guess that's good enough. You can relive the before-and-afters on my 20 M Street page, and I've also updated the office tab of my Project Directory to move 20 M to the Completed list. (And you'll note that 55 M and the other portions of the Monument Half Street project are now listed in the directory as "Under Construction.")
More posts: 20 M
 

(I was out of town last week, and am also currently under the weather, so I'm only slowly catching up.) At some point during the past week, more buildings on the footprint of the Monument Half Street project met the wrecking ball, giving us some new additions to my Near Southeast Demolished Buildings page. There's also getting to be quite a hole already on the north end of the lot, around the Navy Yard Metro entrance at Half and M.
 

It took awhile to get into the city's Real Property Sales Database, but it can now be reported that WMATA sold its land on the east side of Half Street and one parcel on M Street to Monument Realty on Dec. 26 for $15.4 million. This is the land on top of the Navy Yard Metro stop east entrance that's now going to become the first part of Monument's Half Street/Ballpark District mixed-use development; as part of this deal, Monument is handling the renovation/expansion of the subway station, already underway.
 
852 Posts:
Go to Page: 1 | ... 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 ... 86
Search JDLand Blog Posts by Date or Category