Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1174 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 118
Search JDLand Blog Posts by Date or Category

I've updated my Upcoming Events Calendar with the lineup of activities for September at the Navy Yard's Naval Historical Center.
More posts: Navy Yard
 

The District Department of Transporation recently added 25 more images to its online Historical Photo Archives from locations throughout the city, including two dandy Near Southeast shots. One is from 1949, showing M Street at about 10th Street, looking east (before the 11th Street Bridge flyovers were built). The other is of South Capitol Street, just south of N, looking south toward what was at that point the new Douglass Bridge, circa 1957. (Amazingly, it was taken from almost the exact same spot that I've been using for my South-Cap-south-of-N photos since 2005--it looks a little different now.) There's a couple buildings in the 1957 photo that are still in existence today, although one of them will be demolished soon to make way for 1325 South Capitol Street. But I'm surprised to see that the U-Haul building at P Street was once a Lansburgh's department store (you can click on the photos on the DDOT site for high-res versions, which allow you to see the detail of the buildings much better).
Needless to say, I've added these shots to my Near Southeast Historic Photos page (in chronological order); hopefully DDOT will post some more gems as time goes on.
 

My attention to detail appears to be suffering a deficit lately, because while I've shot and posted plenty of photos of the 100 M Street site over the past few weeks, many of which included the spiffy artwork above the pedestrian walkway, I neglected to actually read the spiffy artwork above the pedestrian walkway. Displayed there for all (but me) to see is a new URL for the project, 100mse.com. It's not terribly exciting, just one page that then links to developer Opus East and to leasing agent CB Richard Ellis, but I was still remiss in not mentioning it sooner. Perhaps it's time for that new glasses prescription....
More posts: 100 M, Square 743N
 

Here's the weekly Ballpark Update from the Post--note the date for the installation of the turf. "Several projects are moving quickly at the new Nationals' ballpark. Large plastic piping for drainage under the playing surface is being laid and connected, with very fine gravel spread to cover the piping and provide the base for the natural grass -- which is supposed to be installed on or around Nov. 1. Special 'foul ball-resistant' panels are being installed in the press box. Concrete field walls down the third base line are being installed. Most of the concrete where the seats behind home plate will sit has been poured, and there is even some painting and drywall work under way in places such as the locker rooms."
More posts: Nationals Park
 

With the August recess over, the city council is swinging back into action, and there's a number of Near Southeast-related hearings scheduled over the next few weeks. The most interesting one is a Committee on Economic Development public oversight hearing on "Office of the Deputy Mayor for Planning and Economic Development Transition of Projects on the Southwest Waterfront, Hill East, Poplar Point, Canal Park, and Kingman Island", scheduled for Oct. 1 at noon. The progress of Canal Park (or lack thereof) continues to be of great interest to Near Southeast residents, and perhaps by the time of this hearing there will be some movement on getting the school buses relocated. There's rumors afoot that the buses could be moved to a temporary lot once a long-term home is secured--and apparently there may soon be a contract before the city council approving a new permanent lot in Prince George's County.
Other council hearings over the next few weeks that touch on Near Southeast issues include a Sept. 26 Committee on Finance and Revenue public hearing on B17-0292, "Arthur Capper/Carrollsburg Public Improvements Revenue Bonds Approval Amendment Act of 2007" and a Sept. 24 Commitee on Economic Development public hearing on B17-0340, "National Capital Revitalization Corporation and Anacostia Waterfront Corporation Clarification Act of 2007".
There's also a Sept. 20 Committee on Public Safety and the Judiciary public oversight roundtable on "Capital Projects and Space Needs for Public Safety Agencies," which I'm guessing may touch on the plans for a new home for the Metropolitan Police Department and whether the move to the old Post Plant at 225 Virginia Ave. is indeed called off--you may recall that one day after the Office of Property Management said that the move was canceled, the Post reported that that the mayor was saying he had made no decision one way or the other.
See my Upcoming Events Calendar for times and locations. Some of these may be available on DC Cable 13 and live webcast.
(Also, as an aside, the ANC 6D agenda for Monday night's meeting is now online.)

 

Having decided that overhead views of Near Southeast from the ballpark and the Southeast Freeway over the past few days weren't enough, I've also now added a bunch of updated overheads from a vantage point at the Courtyard by Marriott, focusing on the many construction projects west of New Jersey Avenue. You can browse these new photos, or see the ones displayed with previous shots from the same location (scroll down a bit) to watch the changes since March of last year. (Hint: old buildings, followed by empty lots where old buildings used to be, followed by holes in the ground, followed by new buildings going up.)

 

Southwest is of course a bit off my beaten path, but it's quiet here in Near Southeast today, so I'll pass these tidbits along.
* There will be a community forum on the plans for the redevelopment of the Southwest Waterfront, presented by Hoffman-Struever Waterfront LLC and the District of Columbia, on Wednesday, Sept. 19 from 6:30 to 8:30 pm at Southeastern University, 501 I Street SW.
* Word was sent out earlier this week that the old Waterside Mall building at 4th and M streets, SW, will close as of Sept. 8, now that both CVS and Bank of America have moved to trailers out front. For more about the schedule of demolition and construction, read this entry at Tommy Wells's blog.
More posts:
 

ANC 6D (covering Southwest and Near Southeast) will have its monthly meeting on Sept. 10, and the draft agenda (now posted online) includes a request to support the closing of the alley that bisects Square 696 (bounded by Half, I, K, and First) as a first step in DRI Development's plans to redevelop the entire block. As I posted here, DRI and development partner Jamestown Properties are planning a four-building office and retail project, to be constructed in four phases, starting in 2008 and ending in 2012 or later.
Non-Near Southeast agenda items include a discussion of the plans for the old Randall School at Half and I, an update on the plans for the Nassif building where the US Department of Transportation used to live, and a discussion of the apparent resolution between community members and the developers of the old Waterside Mall of the massing of the building facades facing M Street SW. The meeting is at St. Augustine's Church, 6th and M streets, SW, at 7 pm.

 

Following up on the official press release sent out yesterday, the Examiner writes about concession company Centerplate being named to handle the food at the new Nationals ballpark. (This was reported by the Post last week and WBJ a few days before that.)

More posts: Nationals Park
 

After getting all those purty stadium interior photos and shots of the surrounding skyline on Saturday, I ventured out Sunday morning to do my usual rounds, and so have posted some updated pictures of 100 M, 70/100 I, and Onyx, along with new shots from the Southeast Freeway showing how much that view is changing (again) as these projects progress. (Here's all the images from yesterday on one page, if you prefer.)
But when I started down First Street south of N to get my usual shots of the stadium's exterior, I was thwarted by guards informing me that access along First (and, by proxy, Potomac Avenue) is now restricted to construction vehicles and workers only. I protested somewhat vigorously--after all, there are still fences around the stadium on that side, and the signs say "Local Traffic Only" and not "Road Closed"--but I lost.
I'll still manage to get photos of the ballpark's south and east side eventually, and really at this point the eye-catching part of the construction on those sides is slowing, so a more leisurely schedule of updates of those pictures will not be catastrophic. (Plus I can always set up my zoom lens at Poplar Point and the Douglass Bridge. That'll show 'em!)
I did take this roadblock as an opportunity to rejigger my Stadium Exterior Construction Gallery page a bit, breaking up the old let's-walk-around-the-perimeter format by bringing the showier shots from all vantage points to the top. You'll see a few new photos from along N Street taken yesterday, but I was too cranky from my run-in with The Man to get new shots from South Capitol. Grrrr.
 

I got a stem-to-stern tour of the ballpark yesterday, and the glorious weather made from some pretty striking photos. So I've done a complete update of my Stadium Interior Construction Gallery, with views from the press box, the two ramp/viewing platforms, and lots of other locations around the ballpark. I also created some stitched-together collages of a few views, and while the small versions are on the gallery page, I've also posted somewhat larger versions on a Stadium Panoramas page, in case you want to inspect the photos more closely. Even if you're not all that interested in the stadium, I suggest taking a look at these two pages, because you'll see some pretty neat shots that show the views that stadium goers will have of the entire city from the ballpark's various vantage points.
UPDATE: In fact, I liked the skyline views so much I picked a bunch of additional ones and added them to my Overhead Photo Browser. Check it out for views of the river, the ever-changing Near Southeast skyline, Southwest, and the new South Capitol Street.
More posts: Nationals Park
 

My Ballpark and Beyond column in today's District Extra of the Post covers the recent departure of AnA Towing to make way for DRI's Square 696 development; the raze permits for the old Capper Seniors complex and the buildings just north of the stadium along First and N streets; and the planned opening in September of the new Spay and Neuter Center at 1001 L Street. (I can't believe I made it through a column without a single piece about parking!)
 

As expected, the Douglass Bridge did indeed reopen overnight, at approximately 4 am, and the traffic cameras at South Capitol and M and at the Suitland Parkway show vehicles moving across newly laid pavement. Channel 4 has a piece on the reopening, as does Channel 5, Channel 9, WAMU (audio only) and WTOP (though it's mostly an updated version of their it's-going-to-open piece from yesterday). And since I missed them yesterday, here's Channel 7 and Channel 4's it's-going-to-open stories.
 

Signs posted in the windows of the Exxon at 1001 South Capitol Street say that the station is closing. (See, I do look across the median into Southwest once in a while.) No date is mentioned on the signs, though I've heard rumors that it's within the next few days, and that the lot has been sold to an unnamed buyer. It might be worth noting--or it might not be--that Ruben Companies owns the other two lots on the block next to the Exxon. Ruben also owns the former KFC/Taco Bell lot in the next block, and the 1100 South Capitol property across the street. If you're looking for cheap cigarettes, the signs at the Exxon say they've got 'em!
 

This afternoon there was a ceremony marking the pending reopening of the Douglass/South Capitol Street Bridge, with remarks by Mayor Fenty, DC Delegate Norton, Council Member Barry, and others. I'll post photos in a little while, but did want to get the news bullets out first:
* They will start opening the bridge around midnight tonight, but it will take a little while to coordinate the opening of the various intersections on each side of the bridge.
* For the first week or so, no left turns will be allowed through the intersection at South Capitol and Potomac, and the intersection stoplights will be a constant flashing yellow. They want people to get used to the new configuration at its most basic before adding in some of the new "options."
* The intersections with O and P streets probably won't be opened for another week or so as well.
* Work on the medians and sidewalks on South Capitol Street, the railings on the bridge, and other improvements will continue for a few more weeks. The emphasis was on getting the roadway back open, but there is still additional work to be done that can be handled while traffic flows. (But watch for some lane closures during off-hours.)
* (Added) The streetscape improvements along South Capitol won't be completely finished until spring, when the stadium is ready to open.
* Everyone still wants a new bridge. This is stopgap work while the city tries to get the funding for a completely new bridge. Congresswoman Norton remarked that the city's performance in getting this project done early and on budget has not gone unnoticed on Capitol Hill as she works to get the new bridge fully funded.
UPDATE: I've now added a bunch of photos of the new South Capitol-and-Potomac intersection to my Douglass Bridge Extreme Makeover page, and there's also additional photos in the Extended Archive. (Didn't take any new shots further up South Capitol; I'll wait until the streetscape improvements are farther along.) And here's the DDOT announcement of tonight's reopening.
UPATE II: I'll put the links to news coverage of the ceremony here. (There will be a new post tonight/tomorrow for the actual opening.) Here's WTOP's piece. And Channel 9.

 

Yesterday was the day that WMATA was supposed to open the bids received from developers who want to purchase the Southeastern Bus Garage and its parking lot at 17 M Street (I've archived the Invitation for Bids, which is no longer linked to on their web site). I keep checking around, but have found so far no indication of who the winning bidder is. I suppose it's possible that this might not be announced until the Real Estate, Planning and Development Committee meets on Sept. 13, or even not until the full board meets Sept. 27. If anyone wants to whisper the winner in my ear, I'll listen. And of course I'll keep digging.
 

The Post's Thomas Boswell takes up the stadium parking and transportation issue in this morning's column, "Fans Can't Fill Seats If They Can't Find Spots." He is concerned that the city and the Nationals aren't moving fast enough to get parking lots lined up and ready by Opening Day 2008. He also takes a swipe at the US Department of Transportation for not allowing some of its 800 spaces to be used by the public, an issue that you might recall was brought up at the July 12 National Capital Planning Commission hearing on temporary parking lots at The Yards--the answer basically was "Sept. 11."
If you want to know more about the current plans, my Stadium Parking and Transportation page is a good place to start, with a map showing possible lots, a link to the draft Transportation Operations and Parking Plan, and all the news items I've written both here on the blog and in my Ballpark and Beyond columns in the Post on various parking-related issues.
This would also be a good time to note that a public space permit application was filed last week by Lerner Enterprises, to put a parking lot on the land it owns at 1000 South Capitol Street.
More posts: parking, Nationals Park
 

Word is out that the Douglass Bridge will be reopened early Thursday morning. More soon.
UPDATE: Here is the media advisory from DDOT; there will be a ceremony with invited speakers on Wednesday afternoon, and then sometime during the overnight hours, before Thursday morning rush, the bridge will be opened to vehicles and pedestrians. It was originally scheduled to reopen Sept. 6, so for those of you counting at home, that means the work will have been completed a week ahead of schedule.
UPDATE II: And here come the torrent of news stories: WashPost, WTOP, Channel 7, Channel 9, Channel 4, Examiner. With more to come, I'm sure.
If you're wandering through here from a web search about the bridge, be sure to check out my Douglass Bridge Extreme Makeover page to see photos from before and during the bridge's rehabilitation.
 

After a week of days that were either overcast and drizzly or ridiculously hot and humid, today's sunny-and-warm profile gave me no choice but to venture out for a reconaissance mission. My report:
The masses of workers and the well-positioned fences make it nearly impossible to take photos of the current state of South Capitol Street, but I have added a decent photo to my Douglass Bridge makeover page showing the new South Capitol and Potomac intersection, which appears very close to being ready for traffic. Streetlights are in place, curbs have been built, paving has begun, and the historic globe streetlamps are installed all along the length of the bridge.
I also snuck a peek into the huge hole where Monument Realty's Half Street project is underway, and from N Street you can see what appears to be vertical construction is already underway at the bottom of the hole. It's along the M Street portion of the site, which will be home to the 55 M Street office building, which itself will contain the expanded entrance to the Navy Yard Metro station. Because that Metro work must be completed by Opening Day 2008, I guess it shouldn't be surprising that they're already pouring concrete and working upward, eight months into construction. The office building itself and the rest of the Half Street Phase I won't be completed until 2009.
And I unexpectedly found Demolished Building entry #138, as the beige garage that has long sat on the northeast side of the Half and I Street intersection bit the dust today, which I'm sure JPI is happy to see, given that 70/100 I Street is growing like a weed right next door.
Speaking of 70/100 I, it got updated photos today, along with Onyx on First and 100 M Street. You can look at those project pages (and their accompanying expanded archives), or you can browse this page showing all photos I've posted from today, which includes a few new shots of Capper Building #2, which I believe is just minutes from opening. And I even finally added a photo of the "Starbucks Coming Soon" sign out in front of the DOT HQ, for the caffeine-deprived.
 

The MPD First District weekend report by First District Commander Diane Groomes includes a robbery on Friday in Near Southeast. Quoting: "2nd and I St SE at 1615 hrs - as a female citizen was walking down the street -two b/f (teens) jumped out of white car and approached the citizen - they stated hello and then jumped her and grabbed her purse - the females jumped into white car (unk type) and fled with a male driver."
More posts:
 
1174 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 118
Search JDLand Blog Posts by Date or Category