Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1319 Blog Posts Since 2003
Go to Page: 1 | ... 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 ... 132
Search JDLand Blog Posts by Date or Category

During my poking around on the DC Office of Cable Television web site recently, I discovered that many of the groundbreakings and other events in Near Southeast this year that have been broadcast on the city's cable channel 16 are also available On Demand; the same goes for council hearings, available on Channel 13's On Demand page. (I kinda sorta knew that the On Demand stuff was there, but when I checked it many moons ago, it didn't seem quite so complete, so I hadn't looked back in on it for a while.)
So if you've missed any of the following four-star telecasts from 2007, you can watch them at your leisure:
* The July bill-signing ceremony at the Earth Conservations Corps pumphouse where the Anacostia Waterfront Corporation and the National Capital Revitalization Corporation were officially abolished;
* JPI's June "groundbreaking" for its four projects along I Street ("Capitol Yards");
* The January groundbreaking marking the start of the Navy Yard Metro renovation and Monument's Half Street project;
* And pretty much any ceremony anywhere in the city the mayor was at since the beginning of the year, plus a lot of other presentations and events. (Be sure not to miss the Reporters' Roundtable "Snitching Debate.") Check the dropdown boxes on the On Demand page for the offerings. I've added the above links to all of the various project pages in case you're desperate to find them again someday.
Two of the most recent shindigs haven't gotten added to the lineup yet--the Oct. 22 kickoff ceremony for the Capitol Riverfront BID (in which you can find out where the "Traveling Roadshow" moniker originated), and the mayor's remarks at the Nov. 13 turf unveiling at the ballpark. Ditto with the Waterside Mall Demolition program, which is currently playing on Channel 16 but hasn't yet made it to On Demand. But perhaps they'll show up eventually.
 

This has been rumored for a long while, but today's Examiner is reporting that it appears to be moving forward: "The D.C. Circulator bus system is expected to expand with at least two new routes in 2008, one between the Walter E. Washington Convention Center and Adams Morgan, and the other from Union Station to the new Washington Nationals ballpark. [...] But it is not expected to be implemented until late 2008, after the Nationals' season." The article doesn't give an exact route, but previous statements by DDOT and others mentioned that it could run past the new US Capitol Visitors Center (yeech--don't get me started) and the Capitol South Metro station as well. And no reason is given for why it wouldn't start until late next year. The Circulator is run by DDOT.
UPDATE: Here's the Washington Business Journal blurb on the plans, with not much additional detail but saying that the areas "should be covered by the end of 2008." And there's also a somewhat confusing statement late in the story, after it says that two new routes will be added, that says "The department will try to modify the existing three routes by extending them to the needed areas, but if that becomes too cumbersome, it will create the two new routes[.]" So now the question is, are there really two new routes, or just expanded routes being covered by the existing routes?
 

After a few days of knocking out the exterior brick walls and windows from the inside by driving Bobcats into them over and over, the showy demolition began at old Capper Seniors this morning, as the wrecking ball started bringing down the western wing of the building. Not the prettiest morning for pictures, but maybe the glum light is apropos. You can look at my main old Capper Seniors page for the basics, or the Expanded Project Archive for photos of the demolition from considerably more angles. (And don't forget to click on the Click to see all available photos of this location. on any of these pages if you want to see the images in between the first and last ones.) It's going to be a slow process, and the demolition is not expected to be finished until the end of December.
The 238-unit building originally opened in 1958 as one of the multiple new high-rises at the Arthur Capper public housing project; but by the early 1970s, crime and drug use and government neglect had already turned the building into such a wasteland that even the then-director of public housing for the city later described it as a "fearsome place" where "there was danger to life and limb to any ordinary citizen who wanted to live there." In 1973, it was finally boarded up, and plans were announced to renovate it into a 292-unit building for elderly tenants, with reopening planned for 1976.
But the renovation plans went awry as well, thanks to battles between the city and the Department of Housing and Urban Development over plans for a health clinic within the new building, along with escalating cost estimates, and fights over the bids on the project. Construction finally began in November 1978, scheduled to take 14 months but eventually stretching to three years as incomplete construction documents and a lack of project oversight by the housing authority brought delays, firings, and lawsuits. In late 1981, it finally reopened, but crime was never eradicated, especially as non-seniors began living in the building. The last of the tenants were moved out early this year, with some choosing to move to the new Capper Seniors #1 a few blocks away at Fifth and Virginia.
While this seniors building at 601 L Street was a home to many people for many years, I'm not sure it's a building to be mourned. It's also now the last remnant of what were once the sprawling Arthur Capper/Carrollsburg projects that stretched from 2nd Street to 7th and from Virginia to L. It's taken seven years, but with this demolition, all Capper/Carrollsburg buildings will be gone.
(As for the other impending demolition, I took a quick spin past 1345 South Capitol this morning and didn't see any action, though some construction equipment has been put in place.)
 

Saturday's Post has a piece on the new turf at the ballpark, giving specifics about the grass itself, the installation, the drainage system, and more. Of course, you can look at my Stadium Interior Photo Gallery for pictures taken last Monday if you want to see lots of images of the field midway through the turf's arrival, or check the Stadium Web Cam for the gazillionth time to see it now that it's completed. There'll be a ton more media coverage of the ballpark's progress on Tuesday, when the mayor and other bigwigs come to the stadium to celebrate the new field.
More posts: Nationals Park
 

The second camera angle at the Stadium Web Cam site is back in business, providing a full view of the press box that's now been painted red as well as complete coverage of far left field, where it looks like the turf installation will be completed today. To see it, choose "Centerfield" in the dropdown box at the top of the page.
UPDATE: And the turf is now finished. Kinda looks like a baseball stadium now!
More posts: Nationals Park
 

A notice in this week's District Register says that JPI has applied to remediate the land it recently purchased at 23 I Street, as part of the District Department of the Environment's Voluntary CleanUp Program. Quoting: "The application identifies low to elevated levels of Total Petroleum Hydrocarbons (TPH) and Benzene in soil and TPH, Benzene, and methyl tertiary-butyl ether (MTBE) in groundwater." JPI is planning a 420-unit residential building with ground-floor retail on the site, with construction expected to begin sometime in 2008. The VCP application for 23 I is not yet online, but you can see JPI's 2005 application for 100 I Street and the city's 2006 application to clean up the stadium site to get the idea.
 

On Nov. 6, the city council passed the final version of Bill 17-0159, which creates a new Southeast Water and Sewer Improvement Benefit District, where landowners will be subject to a special assessment to fund $12.45 million in upgrades already underway to the water and sewer infrastructure under streets near Nationals Park.
To be lazy, I'll quote my own description of the bill, from a post back in July: "It was decided to take care of these upgrades now because the streets that the pipes lie under--South Capitol, Potomac, First, N, and I--are scheduled to be reconstructed in the coming months as part of the streetscape improvement project before the Nationals ballpark opens, and it was thought best to take care of the sewer work now rather than having to dig up newly renovated streets. Landowners (including the city and the U.S. government) would be assessed based on total land area and the gross building area as allowed by zoning for each parcel of land that abuts or benefits from the improvements, and would be able to pay their assessment either in an up-front lump sum or over time."
The specifics are all laid out in the bill (which was passed with an amendment-in-the-nature-of-a-substitute that rewrote the bill's original language), but if you're one of the landowners in this assessment area, I'm guessing you have high-priced attorneys who you're paying to sort out exactly this kind of stuff for you, so I'll gleefully refrain from going into any greater detail.
The infrastructure work on these streets is expected to continue until February, in concert with the streetscape improvements being done at the same time (new curbs, sidewalks, streetlamps, etc.).
More posts: DC Water (WASA)
 

On Wednesday morning at 11 am, demolition began at the old Capper Seniors building at 601 L Street, SE. And, 24 hours later, a lot of progress has already been made on getting rid of the exterior windows and walls. I was amazed to see that, instead of swinging the wrecking ball, workers are actually working inside the building, driving Bobcats into the brick exterior walls over and over to punch them out, turning the building into a skeleton before the actual bringing down of the skeleton begins. (Don't hit the gas instead of the brake, boys!) I've created an Extended Project Archive for this building, to see the before-and-afters from lots of different angles beyond the basics on the main old Capper Seniors page (which also has some photos taken from the interior of the building last week) so take a look at today's photos to see how the work is progressing.
(And speaking of demolition, fences have now gone up at 1345 South Capitol, and workers there are telling neighbors that demolition could begin tomorrow [Nov. 9]. We'll see!)
 

Word has officially gone out that next week (Nov. 13) the mayor and other city bigwigs will be at Nationals Park to "celebrate the new, freshly-laid playing field" -- for those who want specifics, the turf is 13-month-old Kentucky Bluegrass sod, arriving in strips 5/8" thick and 65" long. At the same event, team president Stan Kasten will "share information about the seat relocation process for season ticket holders." The turf installation is moving along today, with right field now finished and work progressing out from the infield to the center- and left-field walls. And the last panel of the HD scoreboard has been installed.
More posts: Nationals Park
 

Nov 7, 2007 2:09 PM
The daily feeds of crime report data that the city makes available have now been expanded to include a "narrative" explaining what happened. (These narratives have been available for a long time in other places, but not in the city's own daily data feeds.) So you'll now see these explanations here on my home page, in the DC Data Feeds/Recent Crime Incidents section. And, if you never scrolled down far enough to know that I have this data, then you'll be surprised to find that I display Near Southeast public space permits, building permits, property sales, and requests to the city-wide call center (which is now pretty much all-parking-enforcement-all-the-time).
More posts:
 

Nov 7, 2007 8:47 AM
Time to go back to watching grass grow on the Stadium Web Cam--this morning workers resumed laying the turf, in right field. And you can also see that there's just a few more panels left to complete the HD scoreboard.
UPDATE: And I should note that the second web cam, in centerfield, is down again. The construction folks are aware, and are working on it.
More posts: Nationals Park
 

Nov 6, 2007 10:30 PM
From Wednesday's Post: "District officials are outraged that the Washington Nationals plan to go to Maryland for major events celebrating the team's first season in the city-funded $611 million stadium complex. The baseball club's charitable arm will host its annual black tie 'Dream Gala' at Gaylord National, a new hotel across the Potomac in Prince George's County, and the team will hold its FanFest, a day-long celebration, in Bethesda. There are no firm plans, as of yet, to hold a kick-off event in the District, though the team says it is working on that. 'I guess we're like Charlie Brown or Rodney Dangerfield. We can't get respect,' council Chairman Vincent C. Gray (D) said yesterday. 'This is just an outrage.' " Read the article for lots of choice quotes from other council members. And the Examiner covers the skirmish as well.
More posts: Nationals Park
 

Nov 6, 2007 12:58 PM
I haven't really done before-and-afters for the inside of Nationals Park (at least when compared to the obsessive coverage of the stadium's exterior), but if you want to look back at how far the ballpark has come in a very short time, you can look at my latest interior photos from yesterday and then wander through these pages from 13 months, six months, and four months ago.
More posts: Nationals Park
 

Nov 5, 2007 7:47 PM
The mid-fall late-afternoon light was a bit hard to work with, and someone didn't think to clean the lens before starting out, but if you can tolerate these transgressions you can check out my new photos from the interior of Nationals Park. Yes, including the turf (though they've stopped installing it over the past few days so they could finish off some last tasks in left field; look for the greening of the outfield to start again later this week). And here's the link again to the Stadium Web Cam, since these photos will be out-of-date almost immediately.
UPDATE: Damn, thought I had a scoop with these photos, but WUSA-9 got inside this weekend. There's some video as well, from up in the stands and in the locker room. But I guess I can say that they don't have that "exclusive" anymore.
More posts: Nationals Park
 

Nov 5, 2007 6:36 PM
A press release went out this afternoon announcing that the Velocity Condos project at First and L sold 10 units during its first five days of sales. Here's the breathless opening text: "If any skeptics still doubt that the rapidly revitalizing Capitol Riverfront, surrounding the new Nationals baseball stadium, will be DC's hottest new address, they need only look at the initial sales success of one of the neighborhood's first new condo buildings. Velocity held its official Grand Opening on October 26, and homebuyer response to this sleek, contemporary new condo community wowed even its developer, The Cohen Companies."
 

Nov 5, 2007 1:49 PM
Apologies for the late notice, but tonight ANC 6D is having an "presentation meeting", to break out the issues that people and organizations want to bring in front of the ANC but which don't require an official vote. This is an attempt to shorten the monthly business meetings, which can run for hours and kill numerous brain cells of all in attendance. The meeting will be at 25 N Street, SW, at either 7:00 or 7:30 pm (now confirmed). Items on tonight's agenda include WASA talking about lead pipe replacement in the neighborhood and an update on Arena Stage construction and schedule.
There's also going to be a presentation by a group called the Coalition of Concerned Citizens of Eastern Washington, who are raising questions about the various road and bridge projects planned along the Anacostia and who have been contacting city officials over the past few months requesting that a new "traffic mobility study" be undertaken. (Here's their flyer and a copy of a letter to Mayor Fenty they sent back in August.) I imagine this group will also be interested in the Nov. 16 hearing before the City Council's Committee on Public Works and the Environment on "Major Bridge Construction Projects in the District".
 

Nov 5, 2007 1:27 PM
Today the Capitol Riverfront Business Improvement District (which covers both Near Southeast and Buzzards Point in Southwest) has launched an interactive map, allowing users to browse the neighborhood's developments, attractions, retail, parks, and transportation options. [Insert self-pitying comment about watching my readership flee here.] You can click on points of interest or additional details and distances to other attractions, or filter the map to only display different types of data.
 

Nov 5, 2007 12:23 PM
You can't tell from the street, but there is some demolition-like work underway today on the roof of the old Capper Seniors building at 7th and M. However, the showy stuff with a wrecking ball will probably start later in the week, perhaps on Wednesday. It would be fab if folks who have a birds-eye view of the building could drop me a line if you see the wrecking-ball-crane getting into place, since the building is out of range of any handy web cams.
 

Nov 4, 2007 8:33 PM
As I took two ventures out over the weekend to take pictures (and cursed the skies for only seeming to be cloudy when I was hitting the shutter, so be prepared for rotten lighting), I came to realize that my desire to capture the changing skyline means that I pretty much have to take photos at every intersection between New Jersey, I, South Capitol, and N, because there's hardly any spot covered by those 10 blocks or so that isn't seeing a big change to its view.
The new player is 55 M Street, with the signature steel beams above the Metro station now visible from two blocks in any direction. And I had to capture the brick work on 70 I, and the continuing climb of 100 M, and the preparations for glass hanging on the sides of Onyx, which gave me way too many photos to post, so it's probably just as well that I have no ballpark photo updates for you. (But be patient, there might be some coming soon.) You can see all of this weekend's photos here, or check out the Expanded Project Archives if you want to see the new photos paired with their "befores."
A couple things to note: 1015 Half Street now has signs marking it as a construction zone, and apparently all that stands between it and the start of excavation is waiting for permits from DCRA. (Snicker.) And Tingey Street, behind DOT, closed last week, I imagine for infrastructure work and perhaps streetscape work as well.
Looking ahead, this coming week should see the start of demolition at old Capper Seniors; I'll be lurking there pretty regularly for the next few weeks, I imagine.
And by the way, a general hat tip to the various folks who have said "hey" when coming upon me taking photos over these past weeks and months. Always nice to talk to people who read the site, and I also always appreciate everyone's kindness in not running over me when I'm standing in the middle of the street.
 

Nov 3, 2007 4:34 PM
I received word earlier today that immediately on the heels of the nine home sites that EYA released at Capitol Quarter as scheduled at 11 this morning, they decided on the spot to release an addtional nine units, which have probably been snapped up by now and which complete the market-rate homes that make up Phase I of the project. (Phase 2, with no announced timetable, will be the townhomes on the blocks south of I Street between Second and Third.) There will still be additional workforce-level income houses to be offered, but those will be filled through a different process (last time it was a lottery) and no dates have been announced. (And low-income rental units are sprinkled throughout the development as well.) Bet it was a wild scene at the sales center when word of the additional units hit the people standing in line....
More posts: Capper, Capitol Quarter
 
1319 Posts:
Go to Page: 1 | ... 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 ... 132
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.