Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1573 Blog Posts Since 2003
Go to Page: 1 | ... 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 ... 158
Search JDLand Blog Posts by Date or Category

(News is getting so overwhelming that I'm having to go to two-a-day link roundups. And still, I feel like I'm missing stuff or giving it short shrift. I guess all that patience being pleaded for by the city and the Nationals and Metro needs to extend to JDLand for the next few weeks, too.)
* Today Metro put out an expanded press release (after a similar one a few days ago) with additional details on how they're planning to handle the April 17 Mass at Nationals Park, or as I call it, Pope Day. There's also stories on Metro's plans by WTOP ("Forget about baseball, is Metro ready for the Pope?") and NBC4. In the meantime, Agence France Presse has a piece on how huge the demand for Pope tickets is.
* Via City Paper (which has taken the story to its bosom), a report from Fox 5 on the Positive Nature youth program at 1017 New Jersey, which is struggling to stay afloat after the huge increase in property taxes that has accompanied the redevelopment of Near Southeast. Don't forget that they're having an open house (they're calling it a "radical rally" to keep their doors open) on Saturday March 15 from noon to 3 pm.
 

Today the Usual Suspects convened on the Southwest corner of South Capitol Street and Potomac Avenue to officially rededicate the Frederick Douglass Bridge and to celebrate the completion of all the rehabilitation work that's been underway since last year. I took some photos of the ceremony, though you'll note that my camera kept being inexorably drawn to a certain new landmark across the street that's less than three weeks away from opening. (It's not my fault--they set up the podium with the ballpark in the background instead of the bridge!) If you've joined us late, you can browse all the background on last summer's Douglass Bridge Extreme Makeover that demolished the northern approach to the bridge and totally remade this portion of South Capitol Street. If you're hoping for a new Douglass Bridge, though, don't despair--city and federal officials announced themselves as still very much committed to building a brand new bridge.
 

Another batch of ballpark-related items, which weren't posted before my 2 am bedtime and so didn't make it into the previous roundup:
* Tommy Wells wants the RFK shuttles to stop at Eighth Street, to allow fans to get off the subway at Eastern Market and patronize the bars and restaurants along Barracks Row before going to the game. WTOP reports that Tommy wants the stop at Eighth and G, though at last night's community meeting ANC 6B commissioner Kenan Jarboe asked about a stop at Eighth and I (which would seem to be closer to the shuttle route). Nationals rep Gregory McCarthy's response to Jarboe was similar to what the WTOP story says, that the Nats would like to run the shuttle without stops for a few months first to get an idea of passenger loads and times before adding the stop.
* Which reminds me--McCarthy said last night that the RFK shuttle will drop off and pick up fans at 300 M St., SE, about four blocks from the ballpark.
* But, is the RFK shuttle even a done deal? The Examiner says that terms are still being worked out between the team and the DC Sports and Entertainment Commission. There's also still questions about how parking at RFK will be handled on days when DC United is playing. Oh, and those all-important beer sales are still needing some guidelines to be written. ("How many beers can a person buy at a time? What inning must the taps shut down? Who will be responsible for enforcement of alcoholic beverage laws?")
 

Here's either a late-night or early-morning update, depending on your sleep schedule:
* Marc Fisher of the Post takes a deep (and infuriated) look at why Nats fans (even just government employees with security clearances) can't park in the 1,060-space garage at the US Department of Transporation headquarters one block from the ballpark. "So how did a simple request to use empty parking spaces at night, after Transportation workers have gone home, turn into -- excuse the expression -- a federal case? A report by Transportation's inspector general makes it clear that the feds were desperate to find a way to reject the Nationals' proposal." UPDATE: Marc's blog includes a link to the inspector general's report.
* The WashTimes describes police plans to step up patrols during Nats games: "[O]fficers with the department's Special Operations Division would be deployed on foot, on bicycles, in cars and on Segways to at least 39 'static posts' around the ballpark to direct traffic and assist in crowd control. Additionally, he said, 10 beats -- staffed by either one or two officers -- will patrol, mostly on foot, the neighborhoods surrounding the stadium, looking out for auto thefts or other property crimes in the hours before and after games."
* The 55 M web cam doesn't show it real clearly, but Metro's signature red tile flooring is being installed in the new west entrance of the Navy Yard station at Half and M.
* There's also new stoplights (not yet activated) installed at Half and M. Which is good news for pedestrians, including neighborhood bloggers who have come perilously close to meeting their maker trying to cross that very intersection.
* A large new sign at Third and I announces that the parking lot now under construction there is Nationals Parking Lot T (in the orange zone). And while the asphalt hasn't been pored at this lot or its sibling to the south, the lightposts erected in the center of each lot are now operational, adding a bit of extra light to Third Street after dark.
* Wednesday night's public meeting on the ballpark traffic management and curbside parking plan heard many of the concerns that have been raised at previous events (visitor passes, stadiumgoers being directed to use the Maine Avenue exit from the SW Freeway, commuters and residents wondering how they'll get *out* of the stadium area on game nights, and more). Representatives of DDOT spoke what is now the official city and team mantra, along the lines of: "We've tried our best to come up with a system, and we'll be watching it closely to see what works and what doesn't, and we'll make changes to it as we need to. We're asking for patience. But there will be congestion, and there will be problems, and there will be *change.*" Which is a message that doesn't always go over very well. After the group Q&A, city and team officials answered one-on-one questions. (The somewhat striking view of the ballpark at dusk from the 10th floor of 20 M was probably not on the minds of most of these meeting-goers.) Oh, and a DPW official made it very clear: cars parked illegally on the new enhanced RPP streets will be towed.
 

I wasn't able to see the meeting myself (I was at Madison Square Garden watching my beloved Roger Federer beat Pete Sampras), but on Monday night the Zoning Commission gave its approval on the Capitol Gateway Overlay Review for 1111 New Jersey Avenue, Donohoe's 220,000-square-foot office building to be built just north of the east entrance of the Navy Yard Metro station. At the first part of this hearing a few weeks ago, there was much back-and-forth about whether the garage entrance should be on New Jersey Avenue (the developer's preference) or in the alley (DDOT's preference, which was not looked on fondly by the zoning commissioners). My sources tell me that DDOT has "somewhat grudgingly" agreed to allow the entrance to be on New Jersey after all, but that they expect Donohoe to work with them to better manage the public space on New Jersey and probably reduce the amount of parking offered. The web site for the project says that it will be completed in 2010, which would probably mean a start date later this year; we shall see if that indeed comes to pass. Read more about the previous discussion on the garage entrance and on what exactly a CG Overlay Review is, if you're wanting more information.
Hopefully soon I can post an update on what happened at ANC 6D on Monday, the *other* meeting I missed while in New York.
 

* If you've looked at the web cam in the past few days, you've seen that they're mowing the turf to get the pretty diagonal pattern in place. Can the Curly W in the outfield be far behind?
* A switch over to the 55 M web cam shows that paving of Half Street is more than Half done (ar-ar).
* The Nats are leaving it up to fans to determine the music that will be played at the ballpark. The choices are available at nationals.com/youmakethecall; voting starts there tomorrow (March 13) at 9 am and runs through March 26 at 5 pm. Read the press release for more details.
* And of course there's the parking for DoD employees at the Navy Yard and Ft. McNair that I just wrote about below.
* Fox 5 reported last night on crime near the ballpark. I only track crime that happens from South Capitol Street east (and the Fox report centered on Southwest), but if you're wanting hard data, look through my Near Southeast Crime Reports archive, which goes back to 2005. The data comes from the city's crime incidents xml feed.
Comments (0)
More posts: crime, Nationals Park
 

Back when the first information on parking for Nationals Park went out in November, there was a line about special parking arrangements for Department of Defense employees, and now we finally have more details, thanks to the Pentagram (h/t to Nats320): "Washington Nationals fans who wish to attend evening and weekend home games may park their vehicles at the Washington Navy Yard or Fort McNair. A Department of Defense common access card, Retiree or Dependent ID card, and DoD vehicle decal are required for entry onto the installations for game parking. Parking for Nationals Stadium events is available in non-reserved parking spaces outside normal working hours, after 4:30 p.m., on weekdays, as well as weekends and holidays. DoD members may sponsor non-DoD guests in their party. At the Navy Yard, MWR food and drink concessions will be available before the game. [...] Spaces on both installations are limited and will be filled on a "first-come-first-served" basis -- public transportation is highly encouraged for those who wish to avoid the inevitable stadium traffic. Parking will not be allowed for games that conflict with installation work schedules, or ceremonies and special events such as the Military District of Washington Twilight Tattoos on Fort McNair, scheduled for 21 May, 4 June and 25 June." See the article for additional details.
Comments (0)
More posts: parking, Nationals Park
 

A reminder that tomorrow (Wednesday March 12) is the community meeting on ballpark traffic management and curbside parking issues, where representatives of DDOT, the Sports and Entertainment Commission, and the Nationals will be on hand to answer questions on the Transportation and Residential Curbside Management Plan (so read it before you get there so you know what to ask about!). It's technically an "open workshop" that will "highlight the numerous parts of the overall transportation and parking operations that will be in effect during events at the new stadium." The press release about the meeting also says that DDOT "will also offer their appreciation to the area residents and business owners for their support and patience during the recent street upgrades in the South Capitol corridor." (Cookies? Cake? Gold stars for foreheads?) The meeting is on the 10th floor of 20 M Street, SE, from 6 to 8:30 pm.
 

For those interested in getting news on Benedict XVI's visit to the U.S. (which includes the April 17 Mass at Nationals Park) the Conference of Catholic Bishops has set up a blog with the latest headlines and items of interest, at uspapalvisit.org. And, if you want a blog about the visit that's a little closer to home, the Washington Times has a papal visit blog, too.
Comments (0)
More posts: Nationals Park
 

Yesterday Metro put out a press release with more detailed information (beyond what I posted on Saturday) on how it is planning to be ready for Opening Day at Nationals Park. Here are the highlights, which include a few answers for items that people were concerned about:
* The west entrance of the Navy Yard station will indeed reopen "the weekend of March 29", after its year-long $20 million renovation to expand its capacity from 5,000 to 15,000 passengers an hour.
* "On game days, the west entrance will be exit-only three hours before games, and entrance-only after games. During games, the Navy Yard east entrance should be used by people traveling in the opposite direction of the crowds."
* "The newly expanded N22 Metrobus route from the Navy Yard Metrorail station to the Eastern Market and Union Station Metrorail stations will operate every 10 minutes from 11 a.m. to 11:30 p.m." (Note that previous announcements about the N22 had it stopping at 10:30 pm; I don't know if the 11:30 pm end-time is only for Opening Day, or for all games, or what.)
* "To accommodate the crowds, Metrorail will operate up to 18 extra trains, most of them on the Green Line. All trains will be a combination of six and eight-car trains."
* "On weekends and at the conclusion of games, Metro will have extra trains available to get fans to and from the ballpark."
Also, beyond what is in this release, WTOP and the Examiner are reporting that Metro has decided to add one additional six-car train (with a capacity of about 900 passengers) during weekday evening rush hours, for a total of 13 six-car trains and 7 eight-car trains. There will also be four trains waiting on the Green line in case of problems. NBC 4 also has a piece on Metro's plans.
For more information, look at my Take Metro! page, as well as my other Stadium Transportation and Parking pages if you're planning on driving.
 

This just in from DDOT (no link yet): " DC Department of Transportation (DDOT) in coordination with The Federal Highway Admin (FHWA) will be installing the overhead Nationals Baseball Signs during nighttime hours Monday, March 10, 2008 from 8pm to 4:30am on the overhead sign poles for the South Capitol Street ramp exit off 395NB. The ramp will be closed to ensure the safety of the workers and all motorists. All work will be completed prior to rush hour on Tuesday. The work area is 395-North also known as East Bound SE/SW Freeway. DDOT will assist in controlling traffic in the immediate work area and guide motorist to the detour routes. Work installing the signs will began with the East bound side of 395 at the South Capitol Street. DDOT encourages all motorists traveling in the work area to follow the clearly marked detour signs and keep alert."
 

Positive Nature, the non-profit at 1017 New Jersey that works with at-risk youngsters, is having a "radical rally" on Saturday March 15 from noon to 3 pm, an invitation to the public to tour the facilities and meet the participants as they try to save their program. You can read about their work and their struggle to remain at their New Jersey Avenue site as their property taxes have skyrocketed in this recent City Paper article.
 

Mar 10, 2008 1:12 PM
* Thanks to reader K for the heads up that the 55 M web cam is back online. Looks like they painted those distinctive beams above the Metro entrance during the blackout. (UPDATE: And the webcam now shows that Half Street is getting paved today.)
* Today it's an Examiner columnist who rails against the traffic and transit catastrophe at the ballpark three weeks before the first regular-season pitch even happens, using his crystal ball to predict that an unfinished Metro station now means an unfinished Metro station then.
* The GW Hatchet explains how to get tickets to the March 22 game at Nationals Park.
* Howard University's paper looks at Southwest residents wary of the development starting to surround them.
* Get in on the Douglass Bridge design discussion in the comments from a few days ago.
 

Mar 9, 2008 3:18 PM
* I mentioned this a few days back, but why not pass along another reminder that Monday at 7 pm is the ANC 6D monthly meeting, with presentations and votes on 401 M Street, the ballpark traffic management plan, and the South Capitol Street Draft EIS, plus a briefing by the Nats on the Opening Day "Fan Fest" activities. To get in on the fun, go to St. Augustine's Episcopal Church at 6th and M St., SW, starting at 7 pm.
* If the ANC isn't your bag, you can watch the Zoning Commission take up again the Capitol Gateway Overlay Review for Donohoe's planned office building at 1111 New Jersey. It's a continuation of the last hearing, which revolved mostly around whether the garage access would be from New Jersey or from the alley. The hearing starts at 6:00 pm, and 1111 is also on the public meeting agenda at 6:30 pm, which perhaps is a display of optimism that Donohoe and DDOT will have the garage issue straightened out and the review ruling can be made. Watch the webcast, if you're so inclined. (I'm going to be missing both of these meetings, so it might be a few days before I can get the scoop on them.)
* The new Enhanced Residential Parking Permit signs, which allow non-Zone 6 parking only on one side of the street in certain areas near the ballpark, continue to get installed. They came to my street north of the freeway within the past day or so.
* I thought I did good with last week's find of a November 2006 satellite photo of the neighborhood, but reader JK has upped the ante with the "Bird's-Eye View" option at Microsoft Live Search, showing not-real-high-up images from March 2007. But be careful when you're scrolling around--if you go to fast, the images flip back to shots from early 2003. (Which is festive in its own fun-house kind of way.)
 

Mar 8, 2008 4:03 PM
Metro has posted some information about how it plans to handle Opening Day at Nationals Park on March 30, and the Mass by Pope Benedict XVI on April 17. (This document comes from the agenda for its March 13 Customer Service, Operations, and Safety Committee meeting.) Some highlights, above and beyond the we've-put-up-a-web-site-and-printed-brochures bullet points:
* Metro is expecting 24,000 fans to come via Metro for Opening Day (21,000 of them via the Navy Yard station), and 26,000 Mass attendees. They also expect 60 percent of baseball fans to arrive via Metro during the season.
* The Opening Day plan includes the newly enhanced N22 bus service, 18 extra pre-and post-game trains (mainly on the Green line), extra eight-car trains (perhaps up to every third train), and converting the Navy Yard Station to "one-way" traffic. (I presume this means for pedestrians, though I'm not sure if this means that *no one* can enter/exit the station against the flow before and after the game.) The fact that this first game is on a Sunday night is allowing Metro and the city to avoid a possible complete meltdown of the transportation network that might happen if it occurred during an evening rush-hour.
* Because Mass attendees must be through security and into the park by 9 a.m., Metro expects the largest crushes of travel to be between 5 and 8 am (the height of the morning rush hour) and again post-Mass. All available extra trains will be used when the Metrorail system opens at 5 am, and there will be 18 extra trains after the Mass ends. And, again, the document says that the Navy Yard Station will be converted to "one-way," which ought to be interesting for the commuters trying to use the station to get to and from work during this Thursday event. And the dreaded phrase "Rolling Street Closures" is mentioned for Pope Day, in that it might affect bus routes coming into the neighborhood. If there were ever a day for Near Southeast residents and workers to telecommute....
With the uncertainties about how fans and the transportation network will handle the crush of getting to the new ballpark for the first time, and with the president expected to throw out the first pitch, the Nationals are opening the gates at 3:30 pm on the 30th, 4 1/2 hours before the 8:05 pm start time. I've been told that they've acquired more than 50 magnetometers to try to lessen the burden of passing 41,000-plus fans through security, but if you're going to the game, you might not want to show up at 7:55.
UPDATE: For more, see this Tuesday entry on additional news on Metro's plans.
 

Mar 8, 2008 10:48 AM
Just a bunch of tiny items worth highlighting on a dreary Saturday (no new photos today in this muck):
* A building permit has been approved to build a surface parking lot along First Street between M and N, where Normandie Liquors and its brethren were demolished last month. And the Archdiocese of Washington has applied for a public space permit for the 1300 block of First Street, SE--does the Popemobile need special parking permits?
* As plans at The Yards continue to move forward, there's now official names for the first-phase projects. Say hello to The Boilermaker Shop, The Pattern Shop Lofts, and Factory 202. (And 401 M and 400 Tingey, but those aren't anywhere near as catchy.)
* The 55 M web cam is no longer available to the public. Perhaps they want the Opening Day vista to be a big surprise. Or they don't want people watching the last-minute work on the Navy Yard Metro station. (I wonder if the gas main hit on Thursday was caught by this camera.)
* Some commenters are discussing the idea that's been floated of someday demolishing the Southeast-Southwest Freeway. Getting rid of this Berlin Wall that separates Capitol Hill and Near Southeast (and splits Southwest) was brought up in the National Capital Planning Commission's 1997 Extending the Legacy framework plan, if you want to see it actually on paper. (Apparently an updated NCPC framework plan is scheduled to come out this spring, which looks like it continues to have Virginia Avenue marked where the freeway currently is.) As to whether I'll see this done in my lifetime, well, it would be a nice surprise.
If you really want to go high-concept, you can read DDOT's 2003 South Capitol Street Gateway and Improvement Study to see their ideas for a tunnel that would link I-295 and the SE/SW Freeway for through traffic, leaving South Capitol Street to become the grand urban gateway boulevard planners envision. At Wednesday's public meeting on the South Capitol Street Draft Environmental Impact Statement, DDOT said that the tunnel isn't totally off the table, but they decided that a new Douglass Bridge and other South Capitol Street improvements could move forward separately. But could a tunnel still work if the dream of dismantling the SE/SW Freeway were realized?
* I've tried to remain (mostly) unopinionated on various projects during the five years I've run this site. But sometimes, it's necessary to take a stand, to come out from behind the cloak of neutrality and crusade for what you believe in. So I'm going to take advantage of this bully pulpit and fight for one thing: Arched Bascule!
 

Mar 7, 2008 2:41 PM
* Tommy Wells's web site has the details on the new times and routes for the N22 bus that runs between Union Station and New Jersey and M. The expanded hours and route changes start on March 30. I've added them to my Take Metro! page.
* After the recent columns that have caused some gnashing of teeth with their representations of the area around the ballpark, readers might enjoy Marc Fisher's "Scenes from a Changing City" posts this morning: "But it was the walk from the Metro station to the stadium that taught me something about how cities change. The Metro entrance closest to the stadium isn't open yet--it will be done by Opening Day, we're assured--so I walked the extra couple of blocks from New Jersey Avenue. Any walk around the ballpark area these days is a bit treacherous, as the area is cluttered with construction materials and work crews. But it's possible to see that what two years ago was an industrial and nightclub zone in which only the brave dared walk alone is on its way to becoming another piece of the grid. What was a collection of rutted roads, empty lots, warehouses and fringy businesses is becoming an extension of downtown in which walking around is as routine as on Seventh Street in the East End, K Street downtown or M Street NW in Georgetown." (And thanks for the shout out, Marc.)
 

Mar 7, 2008 8:49 AM
Beginning the trek through the approvals process are the first new-construction buildings planned for The Yards--a 320,000-square-foot office building at 401 M Street and a 170ish-unit apartment building to its south at 400 Tingey Street. They would both have ground-floor retail, but it's what's planned for 401 M that will probably have everyone's attention, because a grocery store is proposed for that space, just inside the historic wall and sentry tower on the southeast corner of Fourth and M. (No, which grocery store it could be hasn't been announced yet.) Recent documents have said that 401 M could begin construction in late 2008, with delivery in 2010; the residential building's start depends on "market conditions." (Uh-oh.) A few more early renderings are on my 401 M/400 Tingey page. (See my Yards First Phase page for information on the retail and residential projects that are getting underway this year.)
There's a Zoning Commission Southeast Federal Center Overlay Review of the plans scheduled for April 17, and ANC 6D will be voting on whether to support the project at its March 10 meeting.
Also at Monday's ANC 6D meeting will be presentations and votes on plans for the Opening Day Fan Fest at the ballpark, the ballpark Transportation and Residential Curbside Management Plan (formerly known as the TOPP), and the South Capitol Street Draft Environmental Impact Statement. I attended Wednesday night's public meeting on the Draft EIS, and while the slides from the meeting haven't yet been posted on its web site, the DEIS's executive summary is a good substitute for the information that was available at the meeting--you can read my summary of the plans as well. There wasn't much public comment (maybe seven or eight speakers), and the concerns seemed to be more about making sure DDOT does a good job of handling the inconveniences and resident issues as a result of the planned changes, rather than any real opposition to the plans themselves. The public comment period ends March 31, and the Final EIS is expected to come out late this year.
Alas, I won't be able to attend this ANC meeting that's so chock full of Near Southeast goodness. But I'm guessing that spending that evening watching the Roger Federer-Pete Sampras exhibition at Madison Square Garden might be a bit more enjoyable.
 

Mar 7, 2008 8:31 AM
* The WashTimes has a getting-ready-for-the-baseball-crowds piece, surveying what Metro and DDOT are planning, and also talking about the Transportation and Residential Curbside Management Plan (formerly the TOPP) that I've been writing about extensively. (Read it already, would you?) Metro is planning 14 extra trains for Opening Night, and will be presenting its plan for handling ballpark traffic to its board on March 13. Central to this piece--and to many conversations I've had with city and team officials--is that residents and fans need to know that The Powers That Be will be watching Opening Day very closely (DDOT plans to be watching from the air) to see what works and what doesn't, and will be tweaking the initial plans as necessary. In fact, there's probably going to be an entire season's worth of responding to initial problems, not only in terms of getting to the ballpark but at the stadium as well. Patience is counseled, though of course that's never been a strong suit in this city. And it's worth a reminder that there's a public meeting on the transportation plan on March 12 from 6 to 8:30 pm at 20 M St., SE.
* Commenters yesterday were quick with the news about the gas leak that closed the Navy Yard and Waterfront Metro stations yesterday afternoon, thanks to construction workers at Half and M hitting a gas main. Considering all the work that is being done in the area (not just on new buildings but with a lot of digging in the streets lately), it's kind of surprising that something like this hasn't happened sooner.
 

Mar 6, 2008 12:56 PM
This morning the Usual Suspects re-assembled at the ballpark to plant one of the 14 cherry blossom trees being installed along the centerfield concourse and at the Center Field Gate plaza. And the sun was out! That never happens! Here are some quick photos of the event itself, and check back later today for an update to my Stadium Interior Gallery with a bunch of new photos from centerfield and the plaza. (If you're a fan of my large panoramas, here's one from today taken from the Red Porch restaurant, to whet your appetite for the photos coming later.)
UPDATE: More new photos from today now posted in the Stadium Interior Gallery, mixed in with others I've posted in the past two weeks. So you have a wide range of hideously-dreary-to-fabulously-sunny vistas to look at.
And I'll keep updating this section with links to any media coverage, starting with Dan Steinberg's Sports Bog report. And, as a commenter noted elsewhere, today officials announced that peak cherry blossom time is expected to be March 27 through April 3. With Opening Day smack in the middle. Tim Lemke has a blog entry about the ceremony today as well.
Comments (0)
More posts: Nationals Park
 
1573 Posts:
Go to Page: 1 | ... 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 ... 158
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.