Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1609 Blog Posts Since 2003
Go to Page: 1 | ... 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 ... 161
Search JDLand Blog Posts by Date or Category

The Nationals have just sent out a press release with information on what fans will be greeted with (other than, you know, a baseball game) when they arrive at Nationals Park on Sunday. The highlights:
* The gates will open at 3:30 pm (and the Nats Express shuttle from RFK starts running at 3:00), and everyone will receive a Curly W lanyard and a "Welcome Home" rally towel. The Sheiks of Dixie (a local Dixieland jazz band) will be greeting fans exiting the subway at the reopened west entrance of the Navy Yard station at Half and M. (Half Street will be closed to vehicles, as will N Street east of Van and First Street south of M.) A barbershop quartet will also be installed on Half Street.
* There's even more once you get inside:"Face painters, balloon artists and stilt walkers will welcome fans at the entrance to the Center Field Plaza. Additional Opening Night entertainment may be found inside the ballpark, including the Mambo Combo, a regional zydeco band, Washington, DC guitarist Brian Gross staged in the Lexus Presidents Club, and face painters, caricaturists and balloon artists throughout the Main Concourse." The Braves will start batting practice at 4:30 and the Nats at 5:45.
* Pre-game ceremonies will start at 7:45 pm, which will include a flyover by four F-16s from the 121st Fighter Squadron of the DC Air National Guard, the singing of the national anthem by native Washingtonian Denyce Graves, and the throwing of the first pitch by President Bush. There will also be a new tradition of starting the game with "Washington.... Let's Play Ball!" to be intoned this first time by Mayor Fenty.
* American Idol alum Elliot Yamin will perform "God Bless America" prior to the Seventh Inning Stretch.
And, an answer to a question lots of people have been asking:
* "Grandstand tickets for Opening Night, in Sections 401 and 402, may be purchased for $5 at the Nationals Park Main Box Office, located on Half and N Streets, beginning at 3:30 pm on March 30. Fans may not camp out on Nationals Park grounds or line up for tickets prior to 3:00 pm. Fans may purchase only one ticket per person and must immediately enter the ballpark through the Center Field gates, located next to the Main Box Office."
Comments (0)
More posts: Nationals Park
 

* If you're a collector of these things, you may want to get to your street corner and pick up today's Examiner, which has a special section on Nationals Park, including all sorts of details on food, how to get there, etc. etc. In the meantime, here's the PDF version (the section starts on page 21). The Post will have a similar one (tomorrow, I think?).
* Also, word has gone out from DDOT that beginning at 8 pm there will be lane closures on the northbound 14th Street Bridge to install directional signage for the stadium. It's expected that all lanes will be reopened by 5 am Thursday.
* And, in other news, Bruce has now added a photo credit. Danke....
Comments (0)
More posts: Nationals Park
 

* Wednesday's Post uses the plight of the Positive Nature youth program to look at how all the remaining small businesses near the ballpark are having a tough time dealing with their skyrocketing tax assessments. The cab company moving next week mentioned in the article is Merritt Cab at First and K, where DRI is planning its 800,000-sq-ft office and retail project. There's also an accompanying video on Positive Nature; and it's interesting to note that Positive Nature arrived in the neighborhood in 2004, so it's not a long-standing business the way the Market Deli is, whose owner is now on the hook for $50,000 a year in property taxes.
* There's also a story that looks back at the openings of DC sports venues through the years, with highlights such as the Capital Centre getting its final inspection approvals just a few hours before the first Bullets game and the 15-mile backup on the Beltway that greeted the first game at FedEx Field.
* The Post's special section on the 2008 baseball season is also in Wednesday's paper, with plenty of mentions of the new ballpark, like these from Tom Boswell and Dave Sheinin.
Other ballpark stories from Tuesday (keeping in mind that for now I'm just pointing out pieces that have some slightly different angle from the eight billion other pieces):
* Bruce Johnson of WUSA blogs about the police presence planned for the ballpark, but I was unable to focus on the content after being greeted by my own photo from Saturday's GW game right at the top of his entry. Glad to know you're a reader, Bruce! Tell your readers and viewers about my site sometime!
* WTOP continues its ballpark-story-a-day regimen with word (and video!) that, while some of the new temporary surface lots *look* like they're dirt, they're actually a "mixture of compact concrete and other elements that help with drainage."
 

There's not a lot to say about Monday night's continuation of the Zoning Commission's hearing on whether to amend the city's zoning laws to allow temporary surface parking on eight lots in Buzzards Point. This session was mainly to have representatives of the Nationals and DDOT available for questions from the commissioners, and most of the time was spent taking them through the Ballpark Traffic Management Plan.
The big question seemed to be the one that chairman Hood opened with: are additional lots (beyond the ones approved over the summer) required by the Nationals this year? Gregory McCarthy of the Nationals replied that the team has its parking-space inventory complete for the 2008 season, but that some of the lots being used could be lost to development projects in 2009, requiring the team to continue to find locations for parking. Commissioner May noted that some buildings in the area are already under construction and would have underground parking available when they open, but McCarthy said that "most" are residential buildings that wouldn't be able to offer stadium parking because of their need to have the bulk of their spaces available at night for tenants. (There are two office buildings opening in the next year which could be targets for Nats parking--100 M and 55 M.)
There was also some discussion of the state of sidewalks (and lack thereof) in Buzzards Point, which the commission feels DDOT would need to address before allowing parking in that area. DDOT representative Karina Ricks was a little vague on whether new sidewalks would be DDOT's responsibility or whether it would be up to the lot owners at DDOT's behest to build acceptable sidewalks.
There were some questions about the routing of traffic toward existing parking lots and whether it is going to keep fans off the residential streets; McCarthy told the commissioners about the brochures going out with season-ticket parking passes giving the preferred routes to a fan's specific parking lot. If the ability to build new lots in Buzzards Point were to be approved, DDOT indicated that the current traffic management plans would be revised to take the additional traffic heading to that area into account.
(And speaking of this, apparently signs are now popping up along M Street to guide fans to parking lots based on zone color; there will also be signs about which freeway exit to take for which zones put up soon, according to McCarthy.)
It's expected that the commission will vote on this proposed amendment at its April 13 public meeting. If you want more information on this case (07-08A), here's the Office of Planning report, and you can also read my discussions of the original amendment for more detail on the limitations and rules of these lots. And, it should be emphasized that, if this amendment passes, it doesn't mean that surface lots will definitely be built on these blocks--this is just a change in zoning rules to allow the possibility of lots, if the landowners wish to build them.
 

This just in from the Nationals: "Please be advised that the seating capacity for the Washington Nationals new ballpark -- Nationals Park -- is 41,888."
Comments (0)
More posts: Nationals Park
 

I always get queasy about self-promoting here, but if you're wanting a bit of a peek behind the JDLand curtain, blogger William Yurasko lobbed some questions my way about the ballpark and life here at the Obsessive Compulsive Time-Sucking Vortex, and I gave him some typically long-winded answers.
(But maybe you'd just rather look at the Curly W that appeared late this morning in centerfield.)
 

Short items:
* Positive Nature, the program for at-risk youth that is in danger of losing its rented space at 1017 New Jersey Avenue because of a sharp increase in its property taxes, is looking for volunteers to help with a "massive bucket fundraiser" on Saturday and Sunday as fans arrive for the first games at Nationals Park. They have been working on raising $200,000 by the end of March. The fundraiser info, which came via e-mail, isn't posted on their web site yet.
* Metro says via press release that the sales office at the Southeastern Bus Garage will close on Thursday (March 27), in advance of the garage itself shutting down operations the next day. And WTOP is reporting today on the proposal to lease the bus garage and its parking lot to the Nats for parking, but you can find far more detail about it all in my post from Friday than you will in WTOP's blurb.
 

Just a few items to end your day (or start it, I guess):
* WTOP makes sure DDOT is planning to take down the old "Stadium" signs on the SE/SW Freeway that point drivers to RFK rather than Nationals Park. Meanwhile, tonight in front of the Zoning Commission, Gregory McCarthy from the Nationals said that new signs will soon be posted on the freeway indicating which exits fans should use for the ballpark based on the color-coding of the parking lots.
* A press release from the Nationals gives the basics on Saturday's 6 pm exhibition game against the Orioles, which is open to season-ticket holders and invited guests only. In one small change, the Nats Express shuttle from RFK will begin operating three hours before gametime, rather than 90 minutes. (The gates at Nationals Park will be opening at 3 pm as well, allowing fans to watch batting practice at 3:30.) A pre-game ceremony will begin at 5:30 pm, with remarks from city officials and a ribbon-cutting at home plate. And then they'll actually play some baseball. It's been said that approximately 25,000 people will be expected for this dry run, in advance of the Big Kahuna the next night.
* The Baltimore Sun's architecture critic says nice things about the place.
* Last week I posted that Splash car wash at 10 I Street SE will be offering both same-day cash lot and season-account parking for $35 per game; word now arrives that the owner of the little empty lot at First and L (next to the Market Deli) is also offering a few spaces (season-long accounts preferred), at $25 per game. Call (301) 279-7033 and ask for Marty Resnick if you're interested. These are separate from the lots around the neighborhood that the Nats have officially contracted with to provide parking for season-ticket holders (and perhaps sameday parkers somewhere down the line).
 

Just a reminder that tonight at 6:30 pm is the continuation of the Zoning Commission hearing about whether to potentially allow temporary surface parking lots on some squares in Buzzards Point in Southwest. This is not approving lots themselves, just changing the zoning of certain blocks to give landowners the option to add lots if they wanted, as was done last year with a number of blocks in Near Southeast (only some of which now having parking lots on them). The hearing was continued so that DDOT and Nationals representatives could be there to answer questions. As of now, no Nationals parking lots are located in Southwest, except for one already existing surface lot right under the Southwest Freeway.
For more on all this, read my entry from before the first hearing, which includes the Office of Planning's report that has more details on which blocks would be covered, along with explanations of the rules governing these temporary surface lots (including that combined they may not total more than 3,775 spaces). There's also the ANC 6D resolution opposing this change. Tonight's hearing is at Suite 220 South, 441 4th St., NW, or can be watched via a live webcast, which is the preferred method of lazy bloggers.
 

* Within the past week, Fourth Street between the SE Freeway and M Street has been signed and striped to become one-way southbound. It's always been one-way southbound north of the freeway, but extending that another four blocks seems to be a bit of a surprise.
* If you live in Southwest or on Capitol Hill and received in the past few days a nondescript envelope addressed to "Ward 6 Resident" from DDOT, don't throw it out (like I almost did)--it's your Visitor Parking Pass. Guard this with your life.
* As soon as I swear off chasing every little story on the ballpark unless it somehow relates to the neighborhood, both the Post and the Examiner come out with stories this morning doing just that, talking about the development that's exploded in Near Southeast over the past few years. (And thanks for the hat tip, Michael.) Sayeth the Post, on A1: "Nationals Park opens this weekend and appears nearly complete. But it's surrounded for blocks by a construction zone. [...] Despite appearances, this is just the way District leaders hoped it would be: a ballpark set amid a vast Southeast Washington neighborhood in the middle of one of the biggest overhauls in city history. Some 500 acres are to be transformed, spreading south from Capitol Hill to the Anacostia River, sweeping away an accumulation of old auto body shops, sex clubs and debris-filled lots[.]" If you've read either of these stories and are looking to know more about all the development underway around the ballpark, I invite you to look at the big ole' map at the top right of my home page--moving your mouse across it gives you the basics on each project, and clicking the map takes you to pages chock full of additional details and photos.
* If you took a long weekend, you missed a lot of big news: Florida Rock got its preliminary zoning approvals, Metro has a plan to lease the Southeastern Bus Garage and an adjacent parking lot to the Nats, and I took scads of photos: check out the neighborhood from above with my latest rooftop photos, see pictures from Saturday's GW game at the ballpark, and see the exterior of the stadium in a pile of new shots taken yesterday.
* This is part of something bigger I'm working on that's not quite ready, but if you want to travel back to see how things used to look where Second Base now sits, here's your time machine. You're facing north, then you'll turn clockwise to catch the views in all directions....
 

With thanks for the gorgeous weather, I've spent the day on what may be one of the final complete updates of my Stadium Exterior Photo Gallery, with new versions of not only the main photos on that page, but the complete lineup of shots on South Capitol Street, N Street, First Street. and Potomac Ave. It's these pages that show what has happened to the 21-acre site now occupied by Nationals Park in the last 22 months, by comparing photos taken before the start of construction to what those streets look like today.
(You can also see my latest Interior Photos, most of which are from yesterday's GW game.)
I've also decided, after a bit of pondering, that I'm not going to spend this week scrambling after every story written about the ballpark. If there's *news* (like the Navy Yard station west entrance opening), of course I'll post about it, but this is a time where I'm pretty sure people can find the latest about the stadium without my assistance.
I'm going to focus more on how the ballpark's completion has changed the look of the neighborhood, and on the state of the neighborhood itself as it prepares to welcome thousands of people who've never been here before. I'll be working on some special pages with lots of before-during-and-after photos as a way to step back a bit from the falderal, and to try to drive home to people wandering through exactly how much has changed in the short time since work on the stadium began.
But I won't be able to resist completely, and at the end of this pretty historic week I'll have a big pile of images from Saturday's exhibition against the Orioles and from Opening Night.
Comments (0)
More posts: Nationals Park
 

I'm actually not finished yet (still need to caption them), but for those of you who can't wait a moment, here's way too many photos from today's first-ever baseball game at Nationals Park. (There's also five new bigbigbig panoramas, too.) The pretty brisk day started off cloudy, got sunny as the game got underway, and ended up with a bit of rain here or there by the end, but on the surface it seemed to go well (not like wildfires suddenly erupted in right field or anything). I'll link to the media coverage later, but enjoy the photos in the meantime. Tomorrow I'll be doing a full Exterior Gallery update.
UPDATE: Captions are added, so enjoy the photos. The Post says: "After years of political debate and turmoil that almost caused Major League Baseball to pull out of Washington, the city has a stadium that seems just about ready for prime time. Sitting behind home plate, there was little to see that didn't look finished."
Here's MLB.com's take on the day (and another on the food): "George Washington University scrimmaged St. Joseph's on Saturday afternoon, and while the stadium may not have been finished, it was good enough for the fans and Nationals president Stan Kasten." AP has a story being run all over the country as well. The local networks have had some stories, but they aren't posted on the web.
Comments (0)
More posts: Nationals Park
 

I'm barely even reading these pre-Opening Day stories anymore, but I'll still link to them in case anyone *hasn't* had their fill:
* A church on Capitol Hill complains to WJLA about the new on-street parking restrictions, saying that they shouldn't have them because they're a "40-minute walk" from the ballpark, which is quite a bit of hyperbole for 400 D Street, SE. I live two blocks closer to the ballpark than the church, and I'm pretty sure those two blocks don't double the time of the trip (and the 20 minutes it takes me from my house is definitely at "amble" speed).
* WAMU looks at the environmental impacts of the ballpark.
* WJLA talks about Ben's Chili Bowl at the ballpark, and NBC4 talks about the complete lineup of food at the ballpark that some of us reported weeks ago . If you want more, um, intense coverage of the events at Ben's yesterday (and equally intense coverage of basically everything having to do with the Nationals), visits Nats320, where no Nats tidbit ever is overlooked. He makes me look like a once-a-month dabbler.
* I always predicted that the ballpark would drive every media organization in the country to do a story, and it's now starting: here's Fast Company's quick overview of Nationals Park, from a more business-oriented perspective.
* Scripps wonders what sort of reception President Bush will get when he throws out the first pitch next Sunday.
And now it's time to get ready for the first-ever baseball game at Nationals Park, GW vs. St. Joseph's. The 2,000 fans who got tickets are going to be restricted to moving around on the main concourse and in the lower bowl only.
Comments (0)
More posts: parking, Nationals Park
 

A proposal will be going before the WMATA board next week to allow the Nationals to lease the Southeastern Bus Garage at Half and M (just across from the about-to-reopen Navy Yard subway station west entrance one block north of the ballpark) and an adjoining surface parking lot just across Van Street. This would happen once the Metrobuses are relocated, which apparently is supposed to be by Friday, March 28.
The lease for the Van Street lot would start the next day, and the garage itself would be available on April 20 (after Metro takes a few weeks to remove equipment). For the first 12 months, the Nats would pay $27,370 a month to lease the garage and $9,500 a month to lease the Van Street lot. If they were to decide to lease them until 2010, the rates would be slightly higher.
This money would be used to offset operating expenses associated with the garage's closure, and could bring WMATA nearly $900,000 in revenue if the leases were to run until April 2010.
The unknown, of course, is what will happen with the sale of the garage site, which of course was originally awarded to Akridge for $69.25 million but which is now tied up in a lawsuit brought against WMATA by Monument Realty. The parking lease with the Nats does allow for cancellation by either party with 30 days notice.
The WMATA Planning, Development and Real Estate committee will vote on the propsal first on March 27, and, if it's approved, the full board will vote on it later that same day.
For Nats fans who might be wondering, the garage and lot are both in the Red Zone, so would cost $35 per game to use.
If the garage is indeed closing next week, there will be much rejoicing by pedestrians who've been dodging the buses for years, including distracted neighborhood bloggers trying to grab photos while standing in the middle of the Half and M intersection.
 

* A reminder that Saturday at 1 pm will the very first baseball game played at Nationals Park, between George Washington University and St. Joseph's University. MLB.com has more--and I'll have photos from it sometime Saturday or Sunday.
* MLB.com also has a Q&A with Stan Kasten about the ballpark and other items. "You want all of it to work right, but you know there is going to be a hiccup here and there. We are going to be looking at everything. We'll be getting right back at it that Monday morning [March 31] to see what worked and what didn't work -- to see what we could improve on. Hopefully, we'll have that whole week to improve things even further."
* You can't swing a cat today without hitting news of the Metro Peeps.
* Poor Phil Mendelson. He still wants to use 225 Virginia Avenue for some MPD functions, and the mayor and the executive branch appear to be ignoring him.
* Elephants will be on parade just a few feet north of the neighborhood on Monday morning. No, really. I'm serious.
 

With a surprise motion at the end of last night's second-stage PUD hearing, the Zoning Commission has given preliminary approval to the design of RiverFront on the Anacostia (better known as Florida Rock), the 1.1-million-square-foot four-building mixed-use project nestled between Nationals Park, the Anacostia River, the Douglass Bridge, and Diamond Teague Park. It's been about 11 years since FRP Development first entered the zoning process for this site, and almost two years since the commission unexpectedly sent architects back to the drawing board for a design that better responded to the changes brought by the ballpark.
You can see a few renderings of the latest design on my project page, and read about the specifics (dear heavens, I'm not going to summarize it all AGAIN--read the Office of Planning report for more on this submittal). The one big addition to the design is a large sculpture to be placed on the public plaza ("Anacostia Place") across from the grand staircase of the ballpark, celebrating the Anacostia River watershed, which the commissioners seemed to respond to favorably.
The commissioners all remarked that the project has come a long way, and were pleased with the overall design. There were some concerns from commissioners Peter May of the National Park Service and Gregory Jeffries about the facades of the two western buildings that will face the proposed traffic oval on South Capitol Street at the foot of a new Douglass Bridge, that they aren't "animated" enough in terms of retail for such a prominent location. May had also called the project "too complex", with too much going on with different facades and finishes, but when longtime commissioner Michael Turnbull of the Office of the Architect of the Capitol said that he "liked the complexity," it was clear that there weren't going to be requests for large-scale changes to the design.
After 2 1/2 hours of presentations and questions, Chairman Hood brought up the idea of giving initial approval immediately, which, judging by the wide-eyed glances between the many representatives and consultants in the audience, was not expected. Commissioner May was not really in favor of moving forward, and Jeffries initially seemed to be leaning that way but then hemmed and hawed his way back to agreeing that the proposed action could go forward. (Earlier Jeffries had noted with some surprise that a project of this scope had not brought out a single member of the community in opposition.)
It was decided that the developers need to submit more detailed drawings of the plans for the South Capitol Street facades, and that no final approval would be given to the project until all commissioners approved of them. Commissioner May ended up abstaining on the vote, which was 4-0-1.
Architect Davis Buckley asked for six weeks to prepare the new renderings, and the commission scheduled a Special Public Meeting for May 22 at 6 pm to take final action.
This doesn't mean that earthmovers will arrive on May 23 to start building Anacostia Place and the eastern office building; construction drawings will have to be completed, and the trip through the vaunted DC permitting process will have to begin. But the notion of a Fall 2009 start date for the first phase of this project is looking closer to a reality. As for when the entire project could be completed, the western two buildings are dependent on the construction of the new Douglass Bridge before they can start. So, mark your calendar for about 2018.
I hope to snag some additional renderings included in last night's presentation; there was also a cool fly-over animation of RiverFront and its relationship with its surroundings, though it included the long-defunct Garages Wrapped With Development Goodness once envisioned for the north side of the ballpark, causing Commissioner Turnbull to spend some time lamenting What MIght Have Been.
Comments (0)
More posts: Florida Rock, zoning
 

* The New York Times looks at the plans for replacing Capper/Carrollsburg with Capitol Quarter. (They also sent it out via their news service, so it's appearing in lots of papers around the country.) "Bucking national trends and citing what they call 'a moral goal,' District of Columbia officials have pledged to preserve and even expand low-income housing, replacing dangerous projects with new communities that keep both poor and 'work force' residents -- firefighters, teachers and laborers -- in the mix. The redevelopment of the Arthur Capper and Carrollsburg projects, where Ms. Jackson lived, is the first in the country to promise replacement of all low-income units within the same neighborhood[.]" There's a lot of good detail about the public-housing side of the project, along with comments from former residents.
* Here's a few photos that show the fences around the Capper surface lots that I was blathering about yesterday, if you haven't seen them.
* Don't miss yesterday's photos from on high.
* Coming as soon as I can finish writing it, big news about a milestone finally passed for one of Near Southeast's oldest "new developments."
Comments (0)
More posts: Capper, Capitol Quarter
 

You can't say the folks at Metro aren't trying everything to get the word out about using public transit to get to Nationals Park--witness this YouTube video that hit the streets today, where two Peeps try to tell another Peep to take Metro instead of driving. The production values won't win any awards, but it manages to talk about the two-way New Jersey Avenue entrance, the capacity expansion to 15,000 passengers an hour, and the N22 bus, all while making you crave Easter-y sugar. (h/t DCist, and ABC 7, too)
If you want the less-viral version of information about the Navy Yard expansion, NBC 4 and WTOP and WUSA have video from a tour given today to the media of the revamped west entrance, scheduled to open in time for Opening Night. Also, during yesterday's Metro ride-along with Stan Kasten, Nats320 grilled WMATA's COO with a pile of Metro/Nationals-related questions.
If you haven't been following along, Metro has spent $20 million increasing the number of fare gates and vending machines, adding two elevators and relocating the station kiosk, fare gates and fare vendors from the mezzanine to the street entrance. One thing in today's reports that is quite different from anything I've heard in the past two years--Metro is now saying that the upgrade to 15,000 passengers an hour is just for the west entrance, and that the east entrance can handle an additional 5,000 passengers an hour. Seems odd that this has never been emphasized before now, that it's always just been that the upgraded station would handled 15k....
Oh, and the commemorative Nationals SmarTrip cards go on sale Friday (March 21).
You can see my Take Metro! page for more details on links.
 

Caught a break with such beautiful weather today, and so I snagged a new batch of overhead photos from up high at the Courtyard by Marriott. I took the entire batch, both east and west, and have paired them with the first ones I took, in March 2006. It's quite a difference; these are the views that people should see when they're carping about "how the area around the ballpark is one big construction zone" -- yes, it is, but look what that construction has done in just two years. (And think of what the commentary would be if this construction *weren't* happening.) You can also toggle to include all the photos from here in 2007 as well, to watch the process step-by-step.
These photos show the progress of 100 M, Onyx, Velocity, 70/100 I, the changes with the Capper Seniors buildings and all the demolitions (and new parking lots!) at Capper. There's even the first views of 909 New Jersey coming up above ground level. I'm still adding some updated photos to those project pages, but you'll get the idea.
 

A little bit of news broke yesterday in the comments, as the owner of the Splash car wash at 10 I Street, SE (next to the McDonald's) announced that he will be offering the first known cash lot parking near the ballpark. Splash "will be offering stadium parking on a very limited basis (11 cars) during our 8-5 work week hours and Sundays and federal holidays from 10 to 4pm, but many more than that in the evenings (40+ cars). It is suggested that parties interested in season long parking only 4 blocks from the stadium contact us at [splashdc@earthlink.net], not the car wash. The charge will be $30 per car per event."
As we've been told ad infinitum, as of now there is only parking for season-ticket-holders in the lots that the Nationals have contracted with in the vicinity of the ballpark (though that may change); fans who want to drive to a Nats game but who don't have a season ticket parking pass have the free parking at RFK (or parking at a Metro station) as the only other option. Street parking is a definite no-no.
Comments (0)
More posts: parking, Nationals Park
 
1609 Posts:
Go to Page: 1 | ... 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 ... 161
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.