Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1683 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 169
Search JDLand Blog Posts by Date or Category

Those of us at the Nationals game tonight got an unexpected fourth-inning stretch when some of the banks of floodlights went dark. There were two banks of lights out on the first-base side, and two more on the third-base side along with the large lightpole by the third-base foul pole. MLB.com says that it took about 25 minutes to get them working again. The delay to get the lights fixed plus the slow pace of the game caused the cancellation of the planned postgame fireworks display, to the chagrin of chanting fans. But they cancelled them for you, ballpark neighbors! They didn't want to disturb you! (Anytime a game ends later than 10:50, the fireworks get cancelled.) All of this and an 11-4 loss did not make for a cheery evening, but at least the weather was nice!
Comments (0)
More posts: Nationals Park
 

When I went out yesterday to get photos of the demolition getting underway at 23 I, I also took a fair number of photos along the way on First, Half, New Jersey, I, and K, even though the weather was less than optimal. (Some day I'll get bright blue skies again.) The ones of 909 New Jersey show how it's now almost three stories above ground, and they hint at how much this 12-story building is going to change the northern end of New Jersey Avenue.
You can see all the shots paired with their befores at these links: New Jersey at I and K, First at I and K, and Half at I and K (where those with xray specs might be able to make out the excavation work underway at 1015 Half). The icon is a bit misleading on some of these, because it's still showing for pics taken in April that I didn't update this time around (but perhaps you missed them in the ballpark whirlwind, anyway). And use the See All Photos of This Angle icon to see the range of photos between the "before" and the "after." I hope to get some more photos this weekend, weather permitting.
 

With the ballpark now humming along like it's been here forever (Tom Boswell has a litany of good things to say in today's Post) , interest is starting to turn toward what sort of retail/restaurant options are going to come to the neighborhood, and when. For your Friday time-killing pleasure, I've tossed together a quick a survey of what's either available now or will be coming within the next two years. (I'm not including already existing retail; I'm just looking at where new stuff could arrive.) As of now, I've seen no announcements of tenants for any of these spaces, but maybe if residents, workers, and ballpark fans clap their hands and wish real hard....
* 20 M - Completed in March of 2007, its 11,000 sq-ft of ground-floor retail space would seem to be an enticing location (just across the street from the Navy Yard subway station's ballpark exit), but so far there's been no takers. "Coming soon" signs that were in the windows last year for Wachovia and Kinko's are now gone.
* Capitol Hill Tower - A 7,000-sq-ft restaurant space in the ground floor of this co-op building has been advertised ever since the building opened in 2006, but no takers so far.
* 100 M - The 240,000-square-foot office building at First and M is scheduled to be completed later this year, and they're offering 8,500 sq ft of "corner restaurant/retail space" with "great ceiling heights, storefront and outdoor seating." (There's no ground-floor retail planned for Onyx on First in the same block.)
* 55 M - The first part of Monument's Half Street project is this 275,000-sq-ft office building now under construction at Half and M (it's the building on top of the subway station entrance). It has over 10,000 sq ft of retail spaces on Half, M, and Cushing, and should be completed by mid-2009. (See retail spaces 1 through 4 on this page at the official web site.)
* 909 New Jersey - For the folks who choose to walk from the Capitol South Metro station, the under-construction residential building at New Jersey and K is going to have 6,000 sq ft of ground-floor retail space when it's completed in summer 2009.
* Velocity - The ground floor of this 200-unit condo building at First and L will have retail (I can't find how much), and will be finished by late 2009.
* The Yards - By the end of 2009, the renovation of the old Boilermaker Shop at Third and Tingey into a 46,000-sq-ft retail space should be completed, and there is also 10,000 square feet of ground-floor retail space planned for the Pattern Shop Lofts building on the south side of Tingey, which should have its conversion into a rental building completed by the end of next year as well. Both of these are situated on the route that most Nats Express users walk along to get from the shuttle stop at 300 M to the ballpark. (But will the Nats Express run after this year?)
* Half Street Part 2 - The southern part of the east side of Half Street north of the ballpark is going to be a combination of a 200-room hotel and two residential buildings totaling 340 units, with about 40,000-sq-ft of ground floor retail to entice the throngs that walk along Half Street before and after games. (See retail spaces 5 through 8 on this page at the official web site.)
* 1015 Half - Opus East hasn't yet committed to whether there will be ground-floor retail in this 410,000-sq-ft office building at Half and L, though about 10,000 sq ft of space will be there.
* 23 I - If this 420-unit apartment building does indeed begin construction in September of this year, there could be 15,000 sq ft of retail available at Half and I by the end of 2010.
That's about 200,000 square feet of space to be filled within the next few years--and this doesn't include the retail spaces in the ground floor of the baseball stadium along First Street (who knows when those will be occupied). It's possible other buildings slated to have ground-floor retail could pop up between now and the end of 2010--1111 New Jersey and 250 M are the main candidates.
And there will also could be more offerings at the Yards by 2011 (including that grocery store planned for 401 M as well as the Lumber Storage Shed and other to-be-built pavilions at the Waterfront Park). And maybe the first building at Florida Rock, across from the ballpark's grand staircase, could be done by the end of 2011. But this is getting a little too far down the road....
 

Thanks to reader E. for the tip that demolition work is underway today along Half Street between I and K, where the little gray Alpha Towing building stands; as of earlier this morning, the brick wall was apparently down. This is the site of JPI's planned 23 I Street apartment building, which is expected to start construction by early fall. I don't yet know the fate of Wendy's next door, which is also part of the 23 I site and which was supposed to be closed down as of today. I will go check it out as soon as the rain stops. (This frickin' weather, I am so tired of it. And it scuttled plans I had today for something cool, which hopefully will happen next week--you'll have to wait to find out what it is. So do a sun dance!)
UPDATE: Yup, all gone. Building #152 demolished since 2003. Wendy's is still open, though, and one of the workers there told me they're open through the end of June. I've added a few new photos on my 23 I page to show the changed landscape as of this afternoon. (The sun appeared about 20 minutes later. Damn you, Old Sol!)
 

GlobeSt.com has a brief on 1015 Half Street, the 400,000-square-foot office building by Opus East on the site of the old Nation nightclub along Half, K, and L streets. Excavation started last month, and they're looking at a spring 2010 completion date. It will be certified LEED silver at a minimum, and possibly even reach gold status. It's being built on spec, with no tenants signed yet. There's the possibility for ground-floor retail (the zoning for the site doesn't require it), and there will be three floors of underground parking, which I imagine will be available for Nats parking. You can see my 1015 Half page for photos of the site, though I haven't updated them since digging started. (Hope to get a new batch soon.)
Opus is also the developer of 100 M, which is scheduled to deliver this fall. And the GlobeSt article says that Opus is looking around Capitol Riverfront for other opportunities....
 

The northeast corner of Half and M is home to Nats Lot J these days, with the Sunoco station that used to be there having closed in 2006 (taking with it my first Gas Prices in the Hood location). The land was purchased in 2007 by Monument Realty for $14.3 million, and they're currently marketing the site as 50 M Street, a 135,000-square-foot build-to-suit office building, targeting associations in the area as possible tenants. Monument was nice enough to pass along this early conceptual rendering of the building (bigger version here). Waiting for a tenant means that this building probably won't get started anytime soon.
The project's M Street location means it will have to go through a Capitol Gateway Overlay Zoning Review, which includes the requirement that all the building's non-entrance frontage along M Street be devoted to retail space, and that no less than 35 percent of the entire first floor be retail. (See page 15 for more of the overlay's M Street requirements.)
As for the one-story red brick building behind the 50 M lot, that's a warehouse owned by the Feds, which as of now doesn't seem to be going anywhere. But that little spot is getting kind of valuable, isn't it?
And, since I don't have much else to show you these days, take a few minutes to "drive" M Street, first heading east then back west, to see the changes since 2003. Remember to click on the Click to see all available photos of this location. icon for any location where you'd like to see the photos between the before and the after....
 

The new May issue of the Hill Rag has two articles on the not-very-positive response on Capitol Hill to the new Performance Parking regulations that have gone into effect, centered mainly around complaints that parking for visitors and guests via the one-guest-pass-per-household configuration is not working. You can read the report on April's ANC 6B meeting and the Rag Time column for more. And the latest Voice of the Hill also has an article about the ANC 6B meeting and the problems with guest parking. Feedback that perhaps the rules do not need to be enforced on non-gamedays seems to be growing, too.
These reports are all from outside my boundaries, of course, but we all know how much I enjoy covering parking. Anyone from Near Southeast want to weigh in and add to the fun?
It's also a good opportunity for a reminder about the May 7 community meeting organized by Tommy Wells on Performance Parking, at the Capitol United Methodist Church, Fifth and Pennsylvania/Seward Square, SE, from 7 to 8:30 pm, which ought to be a real barnburner.
Comments (0)
More posts: parking, Nationals Park
 

A reminder that tomorrow (April 30) is the first and only weekday afternoon game at Nationals Park, where the Nationals will be taking on the Atlanta Braves with a 4:35 pm start time. (There's a 1:35 pm game on Monday May 26, but that's Memorial Day.) Traffic and Metro might be a bit hairy during the evening commute, so regulate your blood pressure accordingly.....
Comments (0)
More posts: Nationals Park
 

After a week's vacation, I'm still trying to remember how this whole blogging thing is supposed to work, so while I'm figuring it out, here are a few links:
* Dr. Gridlock looks at the Nats Express from RFK, and finds it acceptable. (Except for perhaps more signage.) And talks about the fun e-cruzer electric carts that are ferrying people for free between the shuttle stop at 300 M and the ballpark.
* Last week's Weekend section has a feature on the KegBus, which shuttles revelers from the bars on Pennsylvania Avenue and Eighth Street to the ballpark.
* Not to go all Prophet of Doom on you, but the Post's Sunday Magazine has a big piece on what DC may look like in 2025. In one scenario: "His mother didn't know it, but Paxten and his friends loved to wander around the mostly abandoned Nationals Park and the ruins of the entertainment complex, despite reports that coyotes had a den in the Nationals' former bullpen. The park had been neglected since Major League Baseball dissolved Washington's team in the second wave of contractions to hit the sport." Yes, but is Florida Rock built?????
 

Monday's Metro section of the Post has "Beside the Diamond, a Lump of Coal", bringing readers up to speed on the Florida Rock concrete-plant parcel just south of the ballpark. Nothing in it that folks wandering through here on a regular basis won't already know (you can read the piles of entries I've posted on the project over the past five years for additional details, including my post about last month's surprise preliminary approval of the latest design, and my project page has plenty of renderings and photos).
Comments (0)
More posts: Florida Rock
 

Within the past few days, I've gotten messages from a few people asking What's the Deal With the Velocity condos project at First and L, noting that construction has taken a vacation recently (like me!). I've been told that it should be starting back up again within the next week or so, and that it's still on schedule to be finished next year. It's still a condo project (not switching to rentals), and about 40 of the building's 200 units have been sold.
 

Apr 25, 2008 8:31 PM
Just a quick note that both the zoning review and special exception applications for the office/residential/grocery project planned at 401 M Street at The Yards and the Public Space Committee's consideration of an application for Five Guys to operate a sidewalk cafe appear to have been approved. (I didn't get to see either meeting, so I know nothing more than that.) See the entry below for additional links and details to find out what the heck I'm talking about. And normal posting here on the blog will resume very soon (I promise), since the JDLand batteries are now just about recharged.
 

Apr 23, 2008 10:36 AM
A somewhat busy Thursday (April 24) is on the boards:
* We might be getting some news on the state of Monument Realty's lawsuit against WMATA over the sale of the Southeastern Bus Garage to Akridge--the WMATA Board of Directors is meeting at 11 am, and the agenda for their executive session includes "Legal Issues - Monument vs. WMATA." I know nothing beyond that.
* Forest City's plans for the office/residential/retail project at 401 M Street will be getting a Southeast Federal Center Overlay District Review in front of the Zoning Commission at 6:30 pm at Suite 220 South, 441 4th St., NW; you can also catch it via live webcast, if it's working. Read more about this from my ANC 6D wrapup last week and an earlier entry on the project.
* And, if you want to make your voice heard about the public space application by Five Guys for a sidewalk seating area, the Public Space Committee will be bringing it up at its monthly meeting, at 941 North Capitol Street, NE, 7th Floor, starting at 10 am. This is the application that ANC6D refused to support last week because of the lack of a community benefits package for the "loss of public space."
 

Apr 22, 2008 10:23 AM
If you're looking for more lunchtime food options in Near Southeast (and who isn't?), here's word from the Capitol Riverfront BID that local "eco-vending" company On the Fly, which has been setting up shop before Nationals games on Half Street about 100 feet north of the ballpark entrance, will now be offering lunch from their neon-green electric "smartkarts" at that location daily from 11 am to 3 pm, starting today (April 22). Quoting: "In addition to its spicy turkey chili, named a "Home Run" by the Washington Post, On the Fly will offer Rocklands BBQ sandwiches, soft tacos with your choice of chicken estafado, pork carnitas or veggie filling, Japanese edamame salads, Brazilian chopped salad with beef tenderloin, couscous, vegetarian sides, energy bars and other organic natural snacks and beverages." Here's a coupon for a complimentary side order or snack between now and Friday--and it mentions Julia's Empanadas as another of their offerings (yay!). On the Fly also has carts at Farragut North, Gallery Place, and the Arboretum.
 

Apr 20, 2008 9:34 AM
The Nats continue to expand their single-game parking offerings, with new options for drive-up cash lot parking now posted on the official web site (and being mentioned during game telecasts). The latest offerings are: a) valet parking (at $50 a pop!) inside the Southeastern Bus Garage at Half and M (which the Nats are now leasing from WMATA), b) additional cash-lot parking in official Nats lots T and W (at Capper) for $20 and lot HH for $15; and c) pre-pay-only individual-game Red Zone parking at a mere $40 a game.
Even broadcaster Don Sutton remarked during a broadcast a few nights ago that perhaps the Nats did *too* good of a job of telling people how tight parking and traffic would be, and that now there's plenty of inventory. (Perhaps the Nats also saw the private cash lots cropping up and saw a little bit of $$ flowing away from their grasp....)
But will this additional traffic flow to parking lots increase congestion, causing angst about the volume of cars descending on the neighborhood? (Then again, if it does, perhaps the pendulum then swings back toward people using Metro or the Nats Express.)
 

Apr 18, 2008 2:47 PM
The Capital Rowing Club and the Anacostia Community Boathouse Association are offering free lessons in "sweep rowing" on Sunday (April 20) from 1 to 4 pm at the boathouses on the Anacostia River nestled between the 11th Street Bridges on O Street. No reservations are required. Even if you don't want to learn to row, it might be a chance to make a visit to the boathouses if you haven't been there before. (And, don't worry, they won't be demolished by the upcoming rehabs of the bridges, though the boathouse operations will be moving to the north a couple hundred feet during construction.) If you can't make Sunday's session, there will be another one on June 7, as part of National Learn to Row Day.
 

Apr 17, 2008 10:59 PM
So, I failed as a neighborhood blogger and archivist and didn't get down to the ballpark (or anywhere close by) for today's Papal Mass. But I didn't have a ticket and couldn't have gotten within a block of the stadium without one. And I figured it all just might get some coverage in the media. I'm not going to track down every article, but here's a sampling:
Check out the Post photo gallery of the day, along with the main article and a feature by Hank Steuver. The WashTimes Papal Visit blog proclaims "Wow--What a Mass!" NBC 4 has a page devoted to all of its video coverage--make sure to scroll down and see the little piece on the St. Vincent de Paul Catholic Church that sits right at South Capitol and M. Channel 9 also has a story and a photo gallery, as part of all of their coverage.
Dr. Gridlock kept track of the roads and rails both before and after the mass, and there seem to have been no major meltdowns. Again.
And, in what baseball fans really want to know, NBC4 has the goods on the work it's taking to transform the ballpark back into a ballpark.
Despite my abject failure with the mass, this was a milestone day for me, because during the ridiculously busy home stretch of the ballpark's completion, I just kept telling myself that I only had to hang on through Opening Night and Pope Day, and then all would return to "normal." And now, after posting nearly 2,000 photos and 270 blog entries in these 108 days of 2008, I seem to have made it. Yay!
So, as a present to myself, posting will be a bit light over the next few days as I do a bit of battery recharging.
 

Apr 17, 2008 7:20 PM
From DDOT, word that testing of the swing span of the Douglass Bridge necessitates some nighttime closures this weekend. "To conduct a full test of the swing span, and ensure the safety of motorist and workers, the bridge must be closed during the testing activity. The first closure is scheduled for Friday evening, April 18th from 10 pm to 5 am. If all results return positive no further closures will be necessary. However, if minor adjustments are found to be necessary, additional testing and closures will be conducted on Saturday from 10 pm to 5 am and repeated again with test-dependent closures scheduled for Sunday from 10 pm to 5 am. Motorist will be detoured to the 11th Street bridges."
 

Apr 17, 2008 2:03 PM
On Friday (April 18) at 3 pm, the city council's Committee on Public Works and the Environment will be having the "initial segment" of the hearing on DDOT's proposed FY09 budget. And, quoting from the hearing announcement: "The initial segment of this hearing will focus on the proposed construction of new 11th Street Bridges. A project currently budgeted at $450 million."
I haven't quite been able to get an answer as to whether this means that some portion of the project will begin next year--a contact at DDOT told me that they will "begin work on the ramps to RFK late this summer/fall" and that "removal of these ramps was recommended in the Middle Anacostia Crossings Transportation Study." That *sounds* like they're demolishing those ramps later this year (which, you can see in the EIS Preferred Alternative are indeed slated to be removed, though not technically as part of the 11th Street Bridges project), but until I see it specifically announced (or mentioned in tomorrow's hearing), I hesitate to say that's actually what's about to happen. If anyone out there has insight..... I won't be able to watch the hearing right away, but will try to get to it within a few days.
Comments (0)
More posts: 11th Street Bridges
 

Apr 17, 2008 8:56 AM
So, the faithful are streaming toward the ballpark as we speak. Although the 55 M cam showed the upper decks pretty empty with about 90 minutes to go, Channel 9 (already on the air with its coverage of the mass) gives a better view of the tens of thousands already inside. (48,000 people are expected.) How's everyone faring, either trying to get out of the neighborhood or into it for work? Or is everyone just staying home? And, for those reading this later today who went to the mass, how did your trip go?
In other news, my Ballpark and Beyond column this week is yet another one about stadium parking, taken mainly from my Monday night post about ANC 6D's muted reaction to parking and traffic issues (along with the Zoning Commission's approval of having additional lots built in Southwest if landowners want them). I also tossed in a quick roundup of the private cash lots springing up.
 
1683 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 169
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.