|
| ||||||||||||||||||||





|
Comments (0)
|
|
Comments (0)
More posts:
Nationals Park
|

icon is a bit misleading on some of these, because it's still showing for pics taken in April that I didn't update this time around (but perhaps you missed them in the ballpark whirlwind, anyway). And use the
icon to see the range of photos between the "before" and the "after." I hope to get some more photos this weekend, weather permitting.|
Comments (0)
|
|
Comments (0)
More posts:
100 M, 1015 Half, 1111 New Jersey/Insignia on M, One Hill South, 250 M/New DDOT HQ, 55 M St., 909 New Jersey, Boilermaker Shops/Yards, Capitol Hill Tower, Florida Rock, Foundry Lofts/Yards, jpi, Monument Valley/Half St., Onyx, Retail, Square 743N, Square 697n, Nationals Park, The Yards, Twelve12/Teeter/Yards, Yards Park
|
Thanks to reader E. for the tip that demolition work is underway today along Half Street between I and K, where the little gray Alpha Towing building stands; as of earlier this morning, the brick wall was apparently down. This is the site of JPI's planned 23 I Street apartment building, which is expected to start construction by early fall. I don't yet know the fate of Wendy's next door, which is also part of the 23 I site and which was supposed to be closed down as of today. I will go check it out as soon as the rain stops. (This frickin' weather, I am so tired of it. And it scuttled plans I had today for something cool, which hopefully will happen next week--you'll have to wait to find out what it is. So do a sun dance!)
UPDATE: Yup, all gone. Building #152 demolished since 2003. Wendy's is still open, though, and one of the workers there told me they're open through the end of June. I've added a few new photos on my 23 I page to show the changed landscape as of this afternoon. (The sun appeared about 20 minutes later. Damn you, Old Sol!)|
Comments (0)
|
GlobeSt.com has a brief on 1015 Half Street, the 400,000-square-foot office building by Opus East on the site of the old Nation nightclub along Half, K, and L streets. Excavation started last month, and they're looking at a spring 2010 completion date. It will be certified LEED silver at a minimum, and possibly even reach gold status. It's being built on spec, with no tenants signed yet. There's the possibility for ground-floor retail (the zoning for the site doesn't require it), and there will be three floors of underground parking, which I imagine will be available for Nats parking. You can see my 1015 Half page for photos of the site, though I haven't updated them since digging started. (Hope to get a new batch soon.)|
Comments (0)
|
The northeast corner of Half and M is home to Nats Lot J these days, with the Sunoco station that used to be there having closed in 2006 (taking with it my first Gas Prices in the Hood location). The land was purchased in 2007 by Monument Realty for $14.3 million, and they're currently marketing the site as 50 M Street, a 135,000-square-foot build-to-suit office building, targeting associations in the area as possible tenants. Monument was nice enough to pass along this early conceptual rendering of the building (bigger version here). Waiting for a tenant means that this building probably won't get started anytime soon.
icon for any location where you'd like to see the photos between the before and the after....|
Comments (0)
|
|
Comments (0)
More posts:
parking, Nationals Park
|
|
Comments (0)
More posts:
Nationals Park
|
|
Comments (0)
More posts:
Florida Rock, Nationals Park
|

|
Comments (0)
More posts:
Florida Rock
|
|
Comments (0)
More posts:
Square 699n, Velocity Condos
|
|
Comments (0)
|
|
Comments (0)
|
|
Comments (0)
More posts:
Monument Valley/Half St.
|
|
Comments (0)
|
|
Comments (0)
More posts:
11th Street Bridges, Boathouse Row
|
|
Comments (0)
More posts:
Nationals Park, Stadium Events
|
|
Comments (0)
More posts:
Douglass Bridge, Traffic Issues
|
|
Comments (0)
More posts:
11th Street Bridges
|


























