Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2000 Blog Posts Since 2003
Go to Page: 1 | ... 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 ... 200
Search JDLand Blog Posts by Date or Category

Thursday (Jan. 29) at 6:30 pm is the Zoning Commission Capitol Gateway Overlay Review for Akridge's planned 700,000-sq-ft mixed-use project along Half Street. You can read my summary of the project plans as presented to the ANC a few months back for details; the ANC voted to support this plan at their January meeting. (I still don't have any renderings--I hope to soon!)
There's also the Office of Planning's hearing report for the project, which was prepared a few weeks ago; it says that OP is "very supportive of the project" but was unable to make a recommendation at the time of the report because it required additional information. I believe there's been some back-and-forth between Akridge and the planning office since then, but details will have to come at the hearing. The OP report is a good offering if you want a pretty detailed analysis of how the project stands up against the CG Overlay requirements as well as explaining the various exceptions and variances being requested.
If you don't feel like schlepping down to the Zoning Commission offices at 441 4th St., NW at 6:30 pm (and there's no one who understands that more than me), you can watch the proceedings on live webcast (no archived offerings, though). I imagine I might send a Tweet or two, if there's something worthwhile.
 

With developers of three large projects needing to make presentations, ANC 6D has decided to have a separate presentation meeting on Feb. 2 in advance of its Feb. 9 monthly business meeting. And all three are Near Southeast spectaculars:
* The Housing Authority will be there to talk about the various modifications it's seeking to the Capper PUD, in advance of its March 19 Zoning Commission hearing;
* DDOT will be making a presentation on the final South Capitol Street Environmental Impact Statement (this includes the plans for the new Douglass Bridge), which I wrote about a few weeks back; and
* Forest City will be making a presentation about the park at the Yards (I believe these are the designs for Phase II, which include the various pavilions and the docks and marinas). The National Capital Planning Commission will be taking a look at Yards designs at their Feb. 5 meeting, and the Zoning Commission hearing on the park's second phase is scheduled for March 2.
The meeting is at the ANC 6D offices on the second floor of 1501 Half Street, SW, at 7 pm.
 

While everyone continues to nervously eye the commercial real market, Opus East has continued to sign tenants at 100 M Street. In addition to Parsons (who signed for 30 percent of the building's space early on), deals have now been completed with Battelle's transportation group (about 6,000 sq ft) and NAVSEA contractors CDI Marine (6,000 sq ft) and Orbis (7,400 sq ft). This brings the building to about 43 percent leased, according to Opus, with contracts closed to be completed for another 8,000 sq ft.
As for retail, SunTrust is still planning to open a branch there (perhaps as early as this spring, but nothing's confirmed), and Opus continues to look for a restaurant (or restaurants) to fill the remaining 8,500-sq-ft of ground-floor retail space.
Comments (0)
More posts: 100 M, Retail, Square 743N
 

While it's outside of my jurisdiction to blog about what the Nationals do to further their goals of winning baseball games, I do consider it part of my mandate to keep an eye on that big building they hang out in. So, with that, here's some hints for what will be coming at the ballpark in 2009, from Chico Harlan's transcript of Stan Kasten's remarks at NatsFest:
* There will be big changes to the Red Porch restaurant in centerfield, which was the last part of the ballpark completed ("We literally got it the day before the season opened," Stan said). Here's how he describes what's coming: "What's gonna happen there is the walls you see now out there where it says Red Porch are being blow[n] out, and it's going to open up right into the ballpark with tables out into the stands. The other wall into the plaza is being blown out; we're having the patio with seats on the plaza with a firepit out there. And of course we're changing the floors and the walls and the menu, so it's going to be a much different experience."
* A stage will be coming to centerfield to allow for more pre-game activities, including the MASN live pre-game show, and some other "surprises" that will be announced later.
* Status of Josh Gibson, Walter Johnson, and Frank Howard will be erected in the centerfield plaza by Opening Day or soon thereafter.
* There will be changes to the food prep/service/quality, presumably in line with the change from concessionaire Centerplate to Levy Restaurants. Stan says: "We're going to have more in the way of value meals this year, because we know the budget is something everyone is worried about." [To which the audience applauded, according to the transcript.] "We're gonna tinker with some all-you-can-eat sections on certain nights; this has become popular in other cities. We're going to try experimenting with it ourselves this year."
* There will also be more specialty ticket packages for certain sections, which weren't spelled out. (The Nats have already announced lower ticket prices for many seats in the park this year.)
Comments (0)
More posts: Nationals Park
 

From a press release just out, word that EYA will be seeking LEED for Homes certification for Capitol Quarter: "The neighborhood's proximity to public transportation, employment centers, parks and neighborhood retail reduces the amount of time homeowners spend in their cars. Add to that environmentally friendly building materials such as Energy Star appliances and windows, water saving plumbing fixtures, high efficiency heating and cooling equipment, and low VOC paints and finishes. The homes at Capitol Quarter provide more energy savings, better indoor air quality, and less impact on the environment than standard new townhomes -- all qualities that the LEED for Homes program is designed to promote." Also from the release, this: "Traditionally, LEED certification has been sought by builders for commercial buildings and custom residential homes. Capitol Quarter will serve as a model for volume builders in how to implement LEED for Homes on a larger scale."
UPDATE: Here's the release on EYA's site, which reminds me to note that this will be the largest LEED for Homes development in the country.
Comments (0)
More posts: Capper, Capitol Quarter
 

I took a nice tour of the action spots around the neighborhood today, getting updated photos of the very showy progress at Capitol Quarter and 1015 Half Street.
I also snuck across the river (don't tell) to get a peek through my zoom lens at the goings-on at Diamond Teague Park, plus I took a photo or two through the fence at First and Potomac. It looks like the gangplank from the shore to the pumphouse has been dismantled; and there's definitely "in-water" work going on.
I also got a good batch of updated photos for 55 M, and gave my Monument Half Street page a badly needed refreshing--there's also this shot of the construction on the extension of the underground garage (and the shored-up hole on the south end of the block), as seen from Nats Parking Garage B.
I even took my first(!) set of photos at 11th and L, where the Southeast Freeway bends toward the 11th Street Bridges, to get an official "before" baseline in advance of the reconstruction and reconfiguration of it all. (And I found this plaque on one of the flyover pillars, which might be worth a chuckle or two.)
If you want to see the entire batch of new photos on a single page, here they are, though it's about a hundred of them so be patient. But the links above are better if you want to see them matched with their "before"s.
(Oh, and that dinky little For Sale sign at 10th and M by the Exxon that I wrote about on Friday is gone. Drunken property advertising?)
 

I wasn't able to stay for a real long time, but I did take a few photos from the first hour or so today's first NatsFest at Nationals Park. Looks like they had a really good turnout, judging especially by the lines for autographs.
Comments (0)
More posts: Nationals Park
 

Some items from the past few days. Big ones first:
* It's probably been true for weeks, but I've just now been by Diamond Teague Park for the first time in a while and can confirm that construction is definitely underway there. Fences are up, cranes (three of them?) are in place, and workers were there. Pictures tomorrow. (Probably *lots* of pictures tomorrow from all over, as long as the weather stays reasonably clear.)
* City Paper got its hands on the letter Mayor Fenty sent to DC Delegate Norton about the city's priorities should the Feds decide to toss some stimulus package dollars in this direction. As I predicted, the two Near Southeast bridge projects were mentioned: "In particular, aspects of the Eleventh Street and South Capitol Street Bridge replacement projects could be undertaken immediately." He also mentions the city's backlog of maintenance projects, along with investments in Metro and the implentation of the streetcar project. And school modernization. And public safety issues.And environmental initiatives. And housing affordability. And health care. (And now here's the stimulus bill itself, though it doesn't get down into specific projects. On the other hand, considering these two bridges ease the commutes to and from the district of the House Majority Leader....)
* Back in mid-November, the transfer of the plot of land known as Reservation 17A from the Feds to the city finally took place; it runs between New Jersey Avenue and Second Street, and is straddled by the trash transfer station building. With this now under District control, various wheels can start turning in that area, including allowing the establishment of I Street between Second and New Jersey that will form the southern boundary of WC Smith's 800 New Jersey Avenue project. There's hopes that the trash transfer station could be demolished in 2010.
* Reader T. reported yesterday that a small bought-at-the-hardware-store For Sale sign went up at 10th and M yesterday, in front of the fence of the Exxon station. I'm not sure what the deal is, since the land is actually owned by the Exxon Corporation, and you'd think they'd have better methods of marketing the land.
* The public notice for the March 19 Zoning Commission hearing on various Capper PUD alteration requests is now available.
* WBJ reports that the Nationals have parted ways with Centerplate, last year's concessionare at the ballpark. This year it will be Levy Restaurants for the food and Facility Merchandising Inc. for the retail.
* More of the fences are coming down at 55 M, as you can see on the web cam. (Though it took me more than a month to notice that the plywood "tunnel" at the Metro exit had disappeared.)
* The Douglass Bridge will be closed at 5 am Sunday until 10am-ish to test the swing span.
 

I've been waiting for this for a good while: sometime in the past few weeks, Google Maps updated its satellite images of Near Southeast, after having been stuck in 2004 time-range for a long time. It's now a shot from sometime in Spring of 2008 (May or late April, to judge by the work on the hole at 1015 Half Street and the leafy-ness of the trees at the ballpark), and, lo and behold, there's that Nationals Park, all shiny and new.
There's been other free online satellite images that were more recent than Google's, but the newest I had seen was this Mapquest shot from late 2006, where the steel work was underway at the ballpark. So this is quite a Great Leap Forward, not only because it shows the completed ballpark, but comparing the two images (as you can do on my Satellite Compare page) shows the incredible amount of change during that 18-month timespan in the neighborhood. (You can also compare this newest images to others from 1988, 2002, 2004, and 2005; my preference is to compare it to 2002.)
Comments (0)
More posts: Nationals Park
 

It's a few days behind schedule, but I've finally completed my 2009 State of the Hood roundup, where I take a few minutes (and a heck of a lot of words) to look back at what happened in 2008 and what's on tap (or, more realistically, not on tap) for 2009. If you haven't been following along closely (and I'm not sure who really does other than me anymore), this is a good way to get caught up on what's under construction, what's finishing up, and what's to come. (If you want some quick numbers, there's also my Development Since 1999, By the Numbers chart.)
The short version for 2008?
First half: All Nationals Park all the time.
Second half: Hello, is there anybody out there?
(On the bright side, this second part is pretty much the same story in any neighborhood anywhere in the country.)
As for 2009, at this point it's hard to imagine a whole lot of projects getting started, though if the economy starts to perk up in the second half of the year there could be some movement. (I'm no Dr. Doom, but you can still color me a bit skeptical.) I haven't put up the Gone Fishin' sign yet, but clearly the volume of JDLand content is going to continue to be a bit thin for a while.
And, while my expertise in predicting the ups and downs of the commercial real estate biz is somewhere around, um, none, I'll still pat myself on the back for this final paragraph from my 2008 SOTH: "Near Southeast will make its official debut with quite a splash in 2008, but we'll also find out whether the economy will slow down the blistering revitalization pace the neighborhood saw in 2007. And whether the Nats can christen their new home with a postseason run. And whether I can make it through to 2009." Well, two out of three ain't bad.
Comments (0)
More posts:
 

Pulling together some reminders and other recent Twittered tidbits:
* This Sunday is NatsFest at the ballpark, from 1 pm to 5 pm. It's being held indoors in the various club areas, so if you've never gotten to see some of the lounges, or the conference center, or the clubhouse, this might be a good opportunity. Season-ticket holders get four free tickets; for the rest of the world it's $10 for adults and $5 for children under 12.
* Last week a raze permit was issued for the defunct Wendy's on I Street. No word on when demolition will actually occur. This is where JPI is planning its fourth Capitol Yards apartment building, 23 I Street, but there's been no recent intelligence on when they might decide to get underway.
* Construction hasn't yet begun on the Park at the Yards, but some additional information and more detailed renderings should be coming to light over the next month. Forest City is scheduled to make presentations to the National Capital Planning Commission on Feb. 5, and the Commission on Fine Arts on Feb. 16, and possibly ANC 6D on Feb. 9.
* A reader is reporting this morning that a derrick crane is going up at Diamond Teague Park--perhaps that's to begin work on the water taxi piers. (Though note that there was already a crane of some sort there back in December when I took these photos.)
* Apparently the various property owners surrounding the section of Eighth Street south of the freeway have gotten together along with the Capitol Riverfront BID to start working on plans to perk up the area, using the Connect Barracks Row report by University of Maryland Urban Studies and Planning students as a jumping-off point. Look for public meetings in February-ish.
 

I haven't seen it with my own eyes yet, but a couple readers reported yesterday (as I Twittered) that Capitol Quarter vertical construction has now begun on the north side of L Street between Fourth and Fifth, across from the units already well underway. (There's also a rumor that bricking will begin on those first townhouses soon.) The foundations have been underway on this block for a while, so I'm assuming it's the showier framing work that has begun. I'll give them a day or two to make some progress, and will get photos this weekend.
Comments (0)
More posts: Capper, Capitol Quarter
 

It's not terribly exciting to look at photos of parked buses, but if you want to see a couple shots of what Near Southeast looked like on Tuesday, here's a few pictures. (You'll also see there a sprinkling of images of 1015 Half Street, now four stories high.) I left the Hill around 9:30 am and walked down south of the Freeway, crossing into Southwest on I Street, and inhaling all manner of bus fumes (from illegally idling vehicles) along the way. I then followed the mobs westward along Independence (since the Mall was closed off before I even left home) and ended up at one of the Jumbotrons along 17th Street near the World War II Memorial. From there, it was an easy trip back homeward along Maine Avenue to I Street.
For all of the hassles that now are part of living on Capitol Hill, a day like yesterday reminds one of its benefits, since the Metro or bus rides or parking were not part of my day--just 5 1/2 miles of walking. My only regret of the day is that I didn't follow the brave souls who took the ramp up onto the SE/SW Freeway to cross toward RFK--it would have been my one chance to get photos from the freeway without being in a speeding car!
If you want to see additional photos of my inauguration trek (with a number from Southwest), here they are, though note that they are in reverse chronological order.
UPDATE: And, just so that people don't think I'm praising life on the Hill at the expense of the other close-in spots, I'll note that a day like yesterday also shows the benefits of living in Near Southeast or Southwest. (You folks in close-by neighborhoods north of the parade route, though, didn't get to live the good life like the south-of-the-Mall-ers did, unless you really enjoyed that trek through the Third Street Tunnel.)
Comments (0)
More posts:
 

On January 19, 2003, I decided to take a bunch of photos of the area south of the Southeast Freeway, and then came home and posted them on my personal web site. No grand plans for hyperlocal journalism or neighborhood blogging--I'd just heard there were plans to revitalize the neighborhood (even though I didn't even know what the area was called), and wanted to have a few pictures of what it looked like "before." And then I created a page of links for myself so that I could keep an eye on the various projects without having to dig through my bookmarks.
And now here we are.
There's too much going on in the city right now to really pay much attention to this little anniversary, but I couldn't let it go by completely unmarked. I'll look back over the past year and look ahead at what's {probably not} coming in 2009 within the next few days, but until then, Happy Anniversary to me. And a big thanks to everyone who reads the site and who send tips or feedback--this site never would have grown into the monstrosity it's become if I hadn't discovered that people were actually interested in what was being posted.
(And, as a useless aside: astute observers might note that I'm not marking the anniversary of JDLand.com--that's because I've had a JDLand web site since 1996, containing several different online projects of which Near Southeast DC blogging was just one. The root JDLand.com address only became the official Near Southeast web site in 2007, when I finally figured out this particular project was a bigger draw than,say, photos of our kitchen remodel.)
Comments (0)
More posts:
 

So far I haven't heard of any events in Near Southeast for Monday's Day of Service that is part of the inauguration schedule, but I have received word that the Earth Conservation Corps (who occupy the pumphouse where Diamond Teague Park is soon to be) is participating in "Renewing the Anacostia Together," which is "a tree-planting and community service project in celebration of the Presidential Inauguration Day of Service." This event at Anacostia Park has been put together by Maryland Rep. Steny Hoyer, along with other members of the Maryland congressional delegation and DC Delegate Eleanor Holmes Norton. Alas, I see from the info page that it's already reached the maximum number of RSVPs (350!).
 

Since it's slipped down the home page a bit, here's my Near Southeast Inauguration Road Closures and Parking Restrictions page, again. I've also added the information on parking at Nationals Park to the page as well.
I also did a bit of wandering around the Click and Park web site where bus companies can reserve their parking, and I see that all bus parking at Nationals Park is sold out. Also, all bus parking spots on Second Street, SE between Virginia and M are sold out, but the other Near Southeast streets are still available for reservations. (All Southwest bus parking is sold out.)
Residents by these bus-parking streets might want to put in earplugs on Monday night at bedtime, since the buses are being told to arrive at their parking zones between 4:30 and 6:30 am Tuesday morning.
Also, the city now has this map (3 MB PDF) showing the bus parking zones, "pedestrian priority" walking routes, bus routes, and other information for the Mall and the areas to the south. I can't quite figure out if you can continue up South Capitol Street toward Washington Avenue and then get to Independence Avenue and the Mall that way because that's part of the restricted area, but maybe as long as you're on the south side of the Independence it's okay? So look for a pretty fair amount of foot traffic on New Jersey Avenue and I Street as people walk from Capitol Hill and points south and east.
 

With a hat tip to the DC Sports Bog: Nationals Park is offering covered parking for the Inauguration starting on Friday in Parking Lot B, at N and South Capitol, though read all of the restrictions carefully:
"Beginning at 7 a.m. on Friday January 15 {sic?} and continuing through midnight on Monday, January 19, Parking Lot B will be open to the public on a 24-hour basis. The garage will operate on a cash only, first-come, first-served basis. No advance reservations will be taken. Vehicles can be left overnight and will be charged the full day rate for each night in the garage. Rates are $20.00 for daytime parking and $35.00 for overnight. No in and out privileges will be allowed.
"Due to the security requirements for the inauguration, no additional cars will be allowed to park in the garage after midnight on Monday, January 19. If a customer has previously parked their vehicle in the garage prior to midnight on Monday, they can exit the garage but will be required to defer to security and police requirements for exit routes from the area which could be severely restricted. Any vehicle can be retrieved after 6 p.m. on January 20 when the travel and parking restrictions are released."
 

Still knee-deep in inauguration craziness in real life, so can't devote much time to Hood things these days. Here's some quick bullet items, which at least I've managed to Twitter over the past few days so that I'm not completely shirking my responsibilities. (Don't forget that these Tweets get displayed at the upper right of the JDLand home page, if you just want to check them every so often.)
* I've received some swell new renderings of the Plaza on K office/retail project at First and K. The official web site also now has a whole lot of detailed information as well. Transwestern announced last week that they have officially begun marketing the project, and that the two buildings along First Street--88 K and 77 I--would make up the first phase. There's also a 10,000-square-foot public plaza at First and K that would be surrounded by ground-floor retail. It also is "designed to LEED Gold standards." See the above links for additional details. No timeline for the start of the first phase--I'm guessing they're not building on spec in this environment.
* The final Connect Barracks Row report has been posted; this was the study by University of Maryland students on how to reconfigure the southern end of Eighth Street below the freeway to better connect it with its neighbors to the north.
* I mentioned the other day that none of the *hundreds* of Near Southeast bars would be taking advantage of the special Inauguration extended hours, but I was incorrect. A lot of people (like me!) probably don't know that the "Bachelor's Mill/Back Door Pub" at 1104 Eighth Street SE in the block north of the Navy Yard even exists (even though their web site lists it as "The District's oldest and largest entertainment complex exclusively dedicated to the gay and lesbian communities"), but they're on the list of approved late-hours venues.
* A resident reports that last two little buildings standing on the 1345 South Capitol footprint have been demolished in the past few days. But no word on whether this means Camden is starting to move forward on this apartment project.
* I failed again, and couldn't make the ANC 6B meeting on Tuesday night. But I'm hoping that the update on the South Capitol Street Final EIS--my main reason for going--will be done for ANC 6D next month.
* Every year I've celebrated on January 20 the anniversary of my starting to track the goings-on in Near Southeast (Jan. 20, 2003 was the first day I went out to take photos, which I then posted on my web site). The past few years I've marked it by posting my annual State of the Hood roundup. However, this year, given that the lead-up to January 20 is going to be just a touch busy, I'm guessing I'll miss my self-imposed deadline by a few days. Waaah!
 

I was unfortunately unable to get to Monday night's ANC 6D meeting, thanks to an avalanche of Inauguration-related work at my real job that couldn't wait, plus there was the arrival yesterday afternoon of my brother's third child, Teddy. (And if you think you've got it bad over the next week, light a candle for him--he's Washington correspondent for the Cox Radio Network, and has to cover all of the inauguration while tending to a newborn and two other kids under the age of five who will be wondering what that squirming, crying package is that arrived at the house.)
Anyway, I've been able to find out that the ANC gave its support to Akridge's planned 700,000-sq-ft mixed-use project on Half Street between M and N, subject to the finalization of the community benefits package. I wrote a long entry after last month's ANC meeting describing Akridge's designs for the project, if you want all the details. I hope to get renderings within the next few weeks, in advance of the January 29 Capitol Gateway Overlay Review.
I hope to find out soon whether the illustrious Capitol Quarter trash enclosures discussions have been brought to a close.
(And I hope to make it to tonight's ANC 6B meeting, which will have a briefing on the South Capitol Street EIS. But only if work doesn't intervene again.)
 

Tommy Wells has posted on his blog additional information to clear up some of the confusion around the Bus Parking Zones in Ward 6. The map I posted last week looks to be pretty much on the mark (and the Post's maps showing huge zones where no parking would be allowed are incorrect). If you live elsewhere in Ward 6, Tommy's post is worth reading, and should calm some nerves in Southwest, where the Post was making it look like the entire area would be no parking, which isn't the case. (Of course, if you were going by my map, you knew this already!)
For Near Southeast, there is this additional piece of info: "DDOT will allow up to 325 buses to park in the Nationals Stadium parking lots (entry and exit will be controlled via the Frederick Douglass / South Capitol Street Bridge)." Also, Tommy's list of closures says that M Street will be closed all the way to 12th Street, which is different from DDOT's list. (There's also the fact that the city's Inauguration site now has two different lists of street closures, with their new Street Closures page not listing any of the bus zone closures that are on their Parking Areas page.)
UPDATE: Apparently even the city isn't quite sure where it should be putting up signs; Channel 7 reports that Emergency No Parking signs went up today in the 900 block of Fifth Street, SE (across from Capper Seniors #1) in front of private homes where buses are not supposed to be directed to park. And the report mentions the increasing confusion over the online and print maps and the bus parking zones.
Comments (0)
More posts:
 
2000 Posts:
Go to Page: 1 | ... 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 ... 200
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.