Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2608 Blog Posts Since 2003
Go to Page: 1 | ... 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 ... 261
Search JDLand Blog Posts by Date or Category

Catching up after a quick trip to Florida:
* A few readers have mentioned some work underway around the Boilermaker Shops at The Yards, but I'll burst the bubbles and note that it's not a sign of formal construction getting started on the 46,000-square-foot retail space. Forest City is taking care of some remediation on behalf of GSA, involving the paint inside the building along with some potentially tainted soil around the outside.
On the same subject, there was a tidbit in the April Hill Rag on page 85 (hat tip reader J) in an article about Barracks Row restaurateur Xavier Cervera, who runs Lola's, Molly Malone's, the Chesapeake Room, and some other new ventures on the way: "And there's even more in his culinary sights: along the Southeast waterfront near Nationals Park, Cervera has leased half of the glass-and-steel Boilermaker building (1100 New Jersey Ave. SE) for a classy, 450 seat sports bar." (Ay-yi-yi on that really incorrect address!)
I asked Forest City about the report, and received this response: "Forest City Washington expects to announce soon a number of great restaurant and retail venues that will be located at The Yards. Upon completion of these leases we will commence redevelopment construction of the Boilermaker Building. At this point, we are not able to specifically respond to the inaccuracies in the Hill Rag piece. These inaccuracies will become evident when we make our official announcement." Hmmm.
In the meantime, you can see renderings and photos (outside *and* inside!) on my Boilermakers Shops page.
* After having a contract for more than three years, WMATA and Donohoe have finally completed the $3 million sale of 5,165 square feet of land at New Jersey and M where the east entrance of the Navy Yard Metro station sits. This allows Donohoe to build its planned 220,000-square-foot 1111 New Jersey office building, as soon as they find tenants. (The building won't sit directly on top of the entrance, as 55 M does with the west entrance of the station, but is pretty close, as you can see in the rendering on my project page.)
* And, in other land transactions in the 100 block of M, the longtime owners of the tiny 1,500-sq-ft sliver of land between 100 M and the alley have sold the property for Northwood Investors, the new owners of 100 M. (The property records say the price was $250,000, which, if accurate, would seem to a good deal less than what they might have been offered back when Opus East was acquiring the property to build 100 M.)
* On Tuesday, April 19 (tomorrow!), there's a Ward 6 Candidates Forum with the large field of candidates for the open at-large seat on the city council (you didn't know there's an election on April 26? You're not alone). It's in the North Hall at Eastern Market from 6:30 to 8 pm, and being hosted by the Ward 6 Democrats (but it's labeled a non-partisan event, so there will be no endorsement vote). You can submit a question for the candidates, whether you're attending or not.
* American River Taxi is getting some press as it gets its service underway between Georgetown, the Southwest Waterfront, and Diamond Teague Park across from the stadium (though Saturday's rains and the subsequent flooding along the Potomac have put a crimp in their schedule over the past few days). WTOP and the The Hoya have posted articles in the past few days.
 

Last missive from Monday's ANC 6D meeting..:
* It's apparently going to be "Neighborhood Day" at Nationals Park on Saturday, April 16. The Nationals said in a press release on Monday that residents will be able to purchase discounted tickets, but you apparently have to be in the know to find the nationals.com/neighborhood ticket sales link. (ANC commissioners got their free tickets for Saturday handed out at the meeting, since they'll be introduced on the field before the game.)
* With a unanimous 7-0 vote, the commission passed a motion authored by David Garber to request that DDOT fund a "comprehensive" traffic study of the M Street corridor and its neighboring streets in both Southeast and Southwest. Much of the discussion ended up centering around the wording of the motion (as is so often the case), with much concern about whether Maine Avenue should be specifically mentioned, especially given that the developers of the new Southwest Waterfront will be undertaking their own traffic study along Maine and Water Street. Commissioner Andy Litsky wondered about the traffic study in Southeast that the Capitol Riverfront BID is looking to fund, and Michael Stevens of the BID said that they would support a "holistic" approach to combining the various studies already done or on the boards (including the one CSX has apparently completed to look at the impact of their planned construction along Virginia Avenue, plus the reports done for the 11th Street Bridges EIS and the in-progress 14th Street Bridges EIS).
The motion was then amended to say that the ANC supports directing DDOT funds "to conduct a comprehensive traffic study and plan for the M Street SE/SW corridor and its feeder and surrounding streets and that all other area studies be integrated for DDOT's review in order to produce a comprehensive study, and that ANC 6D urgently supports the subsequent design process and implementation of a 'complete streets' plan to decrease the speed and volume of automobile traffic, and increase multi-modal transportation safety and efficiency as neighborhoods in 6D continue to evolve and develop."
(If you want to know more about the concept of Complete Streets and how it might inform a redesign of M Street, you can read my report on last year's public meeting held by Tommy Wells to start an "initial dialog" on the subject.)
* The commission also voted 7-0 to support the Pacers Home Run Classic 10K race, to be run on Saturday, June 18. Original plans to start and end the race at the Yards Park ran into some issues with the city's Emergency Management folks not wanting the race to run by the DC Water/WASA plant (and there was no explanation beyond that). So the race will now start and end at Half and N, across from the ballpark, then circle the ballpark down to South Capitol and Potomac before crossing the Douglass Bridge, running along Anacostia Drive in Anacostia Park to the skating pavilion, then doubling back. It's expected there will be 2,000 runners for the 8 am race. (Next year they expect to be able to start and end at the Yards Park and use the new floating bridge to Teague Park to get to Potomac Avenue and the Douglass Bridge.)
* In liquor license matters, it was reported to the commission that Das Bullpen did end up needing to get a new liquor license separate from that of The Bullpen 1.0, and that a new voluntary agreement was written up as well. This was all apparently done very hurredly, on the Tuesday before Opening Day, in order for ABRA to approve the new license on Wednesday in time for Opening Day on Thursday (though as we know Das Bullpen didn't open that day anyway). There's a full hearing on the license scheduled for May 31. If you haven't followed the Twitter flurry, Das Bullpen opened Tuesday (April 13) for the Nats/Phillies game.
* Also on the alcohol front, apparently both Harry's Reserve and Cornercopia are inquiring as to the possibility of the sale of "singles," in their cases to be the sorts of higher-end European beers that typically come in 20 oz or larger bottles. Coralee Farlee, who chairs the 6D ABC subcommittee, asked for some guidance as to whether the ANC is wanting to continue to not consider any exceptions for single sales, as has been the practice. David Garber and other commissioners expressed their support for the higher-end type of sales, and Andy Litsky said that 6D never really had the "singles" problem that lead the H Street NE corridor to ban those sales. Chairman Ron McBee instructed Farlee to check how other ANCs are handling the issue (apparently 6B allows sales of the 20-oz. bottles?), with an eye toward reexamining 6D's stance.
 

Although the Yards Park has been open since September of last year, the historic Lumber Shed that sits just south of Water Street between 3rd and 4th is not yet in its final form. Second-phase plans have always been for the shed to be turned into a glass-enclosed retail pavilion; however, as Forest City has been seeking tenants they have discovered that the vast majority of leasing interest has been for the first floor, not the second.
In order to get the building to the required percentage of leased space in order to get financing to start construction, Forest City is wanting to move their offices to the second floor of the shed, which requires a text amendment to the site's zoning. It would be on an interim basis, for no more than 20 years, and would allow Forest City to move its offices elsewhere before the end of that 20 years, and would require a return to retail or restaurant uses on the second floor after they move out. If the Zoning Commission approves the change, Forest City says they are looking to start construction this year and open the building in 2012. As part of the process for this zoning change, Forest City prepared a series of renderings of the completed renovation, which they have been kind enough to pass along to me. (Click on them to see enlarged versions.)
When Forest City first came to ANC 6D with information about this zoning text amendment request in March, the commissioners had concerns on three areas: the design of the roof (and whether it would be "green"), whether there would be controls in place to prevent the office workers from marring the look and feel of the glass walls by hanging posters or papers on them or putting other clutter too close to the glass, and whether the nighttime lighting of the shed on both floors would be designed to create a desired "jewel box" look.
Forest City addressed these issues at Monday's meeting. A green roof was studied, they said, but ultimately it was decided that it couldn't be implemented in a fashion that would respect the historic profile of the roof and the building, and given that the building is surrounded by almost 100,000 square feet of "permeable" surface (i.e, the park), they felt that another 300 or 400 square feet was not a necessity. The color of the roof will be a charcoal gray. As for the "Post-Its on the Glass" issue, Forest City said that they will stipulate rules as to not hanging items on the glass and how far away other items should be. And the company also agreed to the "jewel box lighting" concept of both floors, provided that it's left up to Forest City to determine the appropriate lighting levels. The rendering at top right (see larger version) shows the nighttime lighting of the building as envisioned.
In addition, David Garber suggested/requested that a sign or plaque of some sort be affixed to the building (but not on the glass!) to explain its historic significance, which Forest City also agreed to.
With questions answered, agreements reached, and plaques affixed, the ANC voted 6-0 to support the zoning change. No date for the hearing with the Zoning Commission has been set as of yet.
The Lumber Shed is not the only retail pavilion planned for the park's later phases--designs call for two additional buildings along Water Street on the empty lots to the east of the shed. You can see more information and renderings on my Yards Park page (scroll down a ways if the link doesn't jump you down to the Second Phase section).
(Coming tomorrow, one more post on 6D's meeting, with a roundup of the other Near Southeast-related items on the agenda.)
 

ANC 6D voted on Monday night to support the historic landmark nomination of the old Market Deli at 1st and L, lending their "great weight" to the application to save the wood-framed building constructed in 1885, which 6D07 commissioner David Garber (who helped prepare the nomination) has described as being the only remaining wood frame corner store in existence south of the freeway.
In moving the motion, Garber mentioned "vocal" support both for and against the nomination; two of the three 6D07 residents in the audience who spoke to the issue were against saving the building, with the third supporting it as long as it doesn't mean the building will just sit there in its current state (all of them live in the Velocity condo building across the street). Also speaking from the audience was an employee of Akridge (Dodd Walker a Mr. Walker, whose first name I didn't catch), which now owns the lot. He indicated that Akridge is not in favor of this nomination, and mentioned that there were surveys done of historic buildings in the neighborhood back when the ballpark was first proposed that went through the Historic Preservation Office and the DC Preservation League, and there was no move at that time to landmark the building. (I should note that I do not recall any studies like this, but if they happened anytime before 2006 I was not steeped enough in the city's planning and preservation processes to have necessarily been aware of them.)
Commissioner Roger Moffatt was unhappy that the Akridge rep didn't bring any copies of these reports, and Garber was skeptical that they existed at all (referring to "these supposed reports"). Commissioner Andy Litsky felt that if these reports are available, the ANC should be able to study them in order to have more information before taking a vote that would throw the fabled great weight of the commission behind the application.
Michael Stevens of the Capitol Riverfront BID spoke to agree with Litsky, saying that the commission should take time to look at all the available information, and that perhaps a community meeting to discuss the nomination should be scheduled (if the Historic Preservation Review Board could postpone the April 28 hearing). Stevens also mentioned that he was historic preservation officer for the city of Dallas for five years, shepherding many landmarking cases through the city's process, and that he does not believe that the Market Deli would qualify for landmarking status.
[Adding this after initial posting, because I missed it in my notes but didn't want to not include it.] Commissioner Ron McBee mentioned that he knows of one restaurant (unnamed) that is interested in buying the building, which would speed the process of getting the corner perked up (since as of now Akridge has no immediate plans to develop this site). McBee also said that he's not a historian, and would vote the motion forward so that the Historic Preservation Review Board could act on the nomination.
In the end, the commission voted 5-0-2 to support the nomination, with commissioners Litsky and Bob Craycraft abstaining.
The Historic Preservation Review Board will hear this nomination on April 28--the staff recommendation on the nomination should be available on the HPRB web site on April 22. I'm also trying to track down the studies mentioned at tonight's meeting.
If you're just joining us, this nomination has already sparked some pretty, ahem, spirited debate. You can see the application, along with the HPRB hearing notice, and read about the city's landmark designation process.
(I'll have more from the 6D meeting over the next few days, but figured I'd start with the item that is probably of most interest.)
[UPDATED here and there to clean up some messiness.]
UPDATE II: According to a source I've talked to in the Office of Planning, apparently the survey referenced by Mr. Walker of Akridge was an informal ("windshield") survey done of buildings in the ballpark area by the Historic Preservation Office to look for any buildings that might be candidates for landmark designation, and no written documentation was created.
 

Sorry I went off-grid most of last week--when I said that the weather on Opening Day reminded me of 2008, I wasn't expecting to then come down with pretty much the same bug that clobbered me after the big event three years ago. (I'm also getting too old to traipse around outside for many hours over multiple days in 40-and-rainy weather.) I'm still not 100 percent, but here's a few items I'm passing along as I work my way back into the swing:
* As already posted, ANC 6D is meeting Monday night at 7 pm at the Courtyard by Marriott at New Jersey and L SE. There's lots of Near Southeast items on the agenda, including the Market Deli landmarking nomination, a call for a combined M Street SE/SW transportation study, and Forest City's desire to move its offices to the Lumber Shed at the Yards Park. ANC 6B then meets on Tuesday, but there don't appear to be any south-of-the-freeway items on their agenda, so I'll be skipping that.
* Sensorium starts its six-week run at the Yards Park on Tuesday, April 12. The Post's Going Out Guide posted some photos of the dome last week during construction, as did the Sensorium folks themselves. If you haven't been following this, Sensorium pairs a 12-course tasting menu with visual/performance art into a production that sounds like unlike anything on the current or recent DC agenda. There are two seatings every night (except Mondays), with tickets $150 per person. If you go, tell us all about it!
* Also at the Yards Park this week is the DC Challenge race and festival on Saturday the 16th, where you can test out your Amazing Race-type abilities in this "Ultimate Urban Scavenger Race."
* The Nationals have a big home stand, starting with the Phillies Tuesday through Thursday (so beware the descending hordes) and then the Brewers Friday through Sunday. All weekday games are at 7:05 pm, Saturday's game is at 1:05 pm, and Sunday is the usual 1:35 pm start. I haven't heard yet if Das Bullpen will be making its debut this week or not. UPDATE: The owner of the Bullpen told me on Monday afternoon that Das Bullpen will be open on Tuesday evening for the Nats/Phillies game.
* American River Taxi has begun its service between the Georgetown Waterfront, the Southwest Waterfront (which we're now calling The Wharf, I guess), and Diamond Teague Park. They have an 8 am commuter run on weekdays from the Wharf to Georgetown, then regular runs between the three stops starting at 10 am until 6 pm weekdays and 9 pm on weekends. (If you're wanting to try out the service to get to any of the Nationals games this week, they say that the boat leaves Georgetown at 6:05 pm [updated time].) Ticket kiosks are at Tony and Joe's at the Washington Harbor in Georgetown and the Gangplank Marina in Southwest, and tickets can also be purchased on the ship. Tickets will normally be $9, but are currently discounted at $8, according to SWill, who's doing a fine job following the venture's launch. ART has just one boat so far (the Dolley Madison), they are still adjusting their run times (right now it takes 20-35 minutes between stops), so following them on Facebook and/or Twitter is a good way to keep up with their service. They hope to eventually expand their offerings to National Airport, Alexandria, and National Harbor. (As of now, the Potomac Riverboat Company is the only outfit sailing to Teague from Alexandria, and that's just for Nationals games.)
* Harry's Reserve at New Jersey and I had its first wine tastings on Friday and Saturday. If you want to keep up with their news and events, you can friend them on Facebook (they've set themselves up as a Facebook "person" rather than a product page to "like"--perhaps they'll rejigger that soon.)
Also, a site note: with more neighborhood information being tweeted these days than I could hope to write about or even retweet, I've created a Near Southeast Businesses/Organizations Twitter list, which you can also browse on the JDLand.com home page, in the box below the map in the right margin--which is below the box with my own latest tweets, so clearly you can get a lot of Twitter content right here if you haven't joined the cult social media outlet yet. I'm trying to keep this list to very-very local businesses and groups (and not DDOT or the Nationals or other feeds that aren't mostly about goings-on in this area). If I'm missing any, let me know.
 

There's nothing I like more when fighting a cold than to think about an upcoming ANC meeting, but these are the sorts of sacrifices I make for you people. Miraculously, ANC 6D has already posted the agenda for Monday's meeting, which is chock-full of Near Southeast-related items and is coincidentally being held in Southeast this time around, at the Courtyard by Marriott at New Jersey and L. Up for discussions and/or votes:
* The Market Deli historic landmark application, which will get a vote from the ANC as to whether or not to support it (and of course we know that at least one 6D commissioner will be voting for it!). The hearing in front of the Historic Preservation Review Board is scheduled for April 28.
* A presentation on the zoning request to allow Forest City to "temporarily" include office space in the Lumber Shed building in the Yards Park. I've written about this Lumber Shed request before, and in fact Forest City did a information presentation on this at last month's ANC meeting, but I was hoping to get copies of the new pretty renderings of the buildings before writing anything, and that never happened, and I knew they'd be back again in order to have a vote on whether the ANC will support the zoning request, so.... I promise to write about it this time.
* A resolution on a long-term traffic and transportation study for M Street SE and SW, also to include a "complete streets" plan, according to David Garber. This would appear to be wider in scope than the transporation study discussed in the draft Performance Parking report I wrote about recently that seemed to only cover the east side of South Capitol, but I imagine all will be clarified at the meeting.
* It turns out that Das Bullpen needs a new separate liquor license rather than operating on the Bullpen 1.0 license, so that's on the agenda as well. The hearing for that is scheduled for May 31, but the ANC will be voting on a "stipulated license," which I believe means that the bar could operate while waiting on the full license hearing. (And no, I haven't heard when they might be opening, though it wouldn't be before the next Nats home game, on April 12 vs. the Phillies.)
* And the BID is looking for support for the "Home Run Classic Pacers 10K Race" on June 18, that appears to start and/or end at the Yards Park and which I would guess (but don't know for sure) would involve some street closings.
The meeting begins at 7 pm, and does allow for short audience questions/statements on any agenda item where a vote will be taken, just in case there's any particular agenda item that people may feel strongly about one way or the other. (And all of this assumes that a government shutdown wouldn't affect an ANC meeting? Anyone?)
 

It can be hard to get much information when you're dealing with one of the more cloak-and-dagger-y agencies of the US Government, but word is filtering out that the National Geospatial-Intelligence Agency has begun the BRAC-mandated move of its employees from the windowless fenced-off building at 1st and M SE to its $1.7 billion new Campus East facility in Springfield.
According to NextGov, the first of NGA's 8,500 employees arrived at their new home in January with more continuing to make the move, and I've confirmed that this includes some employees from the Near Southeast location as well as NGA's other locations in Bethesda, Reston, and Ft. Belvoir. The moves are happening in a staggered fashion, working toward the required "fully operational" date of September 15 in Springfield. (You can see construction photos of the new campus on Flickr, or learn more about the history of NGA via Wikipedia.)
The 1st and M building, known as Building 123 213 in Southeast Federal Center parlance, is the northwestern-most portion of the footprint of The Yards, and the long-term plans for the site are for new office space with ground-floor retail. Perhaps once NGA has completed the move there will be a freer flow of information about the site (if the building will be torn down or used for other purposes in the interim, if the fence will come down, etc.). It also is more than likely that there are other somewhat shadowy outfits operating in this space as well, and I'm not sure whether they're heading for even more shadowy pastures elsewhere during this move.
But the departure of NGA is a step toward replacing the armed encampment one block from Nationals Park with something a bit more welcoming--and I'm sure the building's security folks aren't terribly unhappy about no longer being surrounded by red-clothed hordes (toting cameras! the horror!) 80 days a year. (I will admit to once starting to point a camera at a few of the guards behind the fence--without coming close to squeezing the shutter--just for the fun of showing the people I was with how quickly the guards would reach for their guns.)
It's not like there's ever been a whole lot of detail about the goings-on on this corner: the Post reported back in 1964 that the CIA moved into the renovated Naval Weapons Plant warehouse in January 1963 with "no announcement, no little ceremony, no welcome-to-the-great-southeast-sector fanfare." There also hadn't been any announcement in November 1961 when the GSA awarded a no-bid contract to get the building renovated.
(Current residents and observers will get a kick out of the Post's 1964 description of the building's surroundings as "liquor stores, run-down shops, a railroad spur, and, right around it, a formidable chain link fence topped by five rows of unfriendly barbed wire," which WaPo said made "the six-story cream-and gray building [...] positively glamorous" in comparison.)
If you look at this map of the future layout of the Yards, you can see the 1st-and-M site at upper left, with plans for three buildings and a new east-west street (which this map says will be called Quander Street) about halfway down the block, along with the new "1 1/2 Street SE" running north-south from Quander to N Place.
 

It didn't exactly make one believe that Spring is anywhere close to springing, but a big crowd of fans still braved the weather to head to Nationals Park for Opening Day 2011. I took some photos here and there of the park and the opening ceremonies before retreating to the warmth (yes, I'm a wuss) including the above stitched-together panorama.
Is there optimism for the season? Pessimism? Or will it really not matter, as long as the sun eventually comes out?
Comments (1)
More posts: Nationals Park
 

The news from Tom Sietsema whizzed around the Twitterverse early today: "acclaimed" New York restaurateur Danny Meyer is bringing four of his creations to Nationals Park, including Shake Shack, which has already had DC foodies salivating over a planned Dupont Circle location. Shake Shack will be replacing Five Guys on the Scoreboard Walk, and surrounding it will be El Verano Taqueria (serving Mexican snacks), Box Frites (Belgian-style fries with dips) and Blue Smoke (barbeque). The ink is apparently barely dry on the deal, so construction is only just now getting underway (as you can see in the photo at right and this one, which I took today at the ballpark). Shake Shack and the others are already operating at the Mets' stadium, Citi Field.
This isn't the only news of the day in regards to the ballpark food, as the team also announced new food partnerships: the Boston Beer Company will bring Sam Adams beers to the stadium, along with a new Sam Adams beer garden in May; Kayem Hot Dogs are now the "official frank of the Washington Nationals"; and Breyers is now the official ice cream. There's also changes to the existing concessions, including two portable Hard Times Cafe carts that will sell nachos. And a new "point of sale" operation that is supposed to speed up food sales and other transactions. (We shall see....!)
As for outside the ballpark, I peeked in on the progress at Das Bullpen, and while they were working very hard, it was hard to judge whether they'll be open by tomorrow morning. But the original Bullpen at Half and N will be opening at 10 am for all your late-morning beer-drinking needs. (Justin's Cafe will open at 10:30.) There was also work going on along Half Street, with Monument Realty finally replacing the Half Street advertising signage that for so long has declared "Coming 2009" with a more gentle "Coming Soon."
All this reconnaissance came as part of my short visit to NatsFest, and you can see a quick gallery of my photos from the event, none of which are terribly exciting and are more about little things here and there than the players or any of the activities. (I figured those sorts of photos would be a dime a dozen since every fan was toting a digital camera.) One change at the stadium visible in one of the photos (above the big honking new Jayson Werth banner) is that the red tent on top of the left-field garage that has been obscuring views of the Capitol for the past few years is now gone. Yay!
In other news, DDOT has announced that the Navy Yard Circulator's hours are indeed being extended beginning on April 1. From Friday through Sept. 30 (though could be continued in the FY12 city budget), the buses will run from 6 am to 9 pm weekdays and from 7 am to 9 pm on Saturdays, in addition to the extended hours on Nats game days. (They're supposed to post the 2011 Game Day Schedule, but it's not there quite yet.)
And, if you want more transit info before heading off to the ballpark, here's Metro's press release on its plans for extra trains, crowd monitoring, etc.
If I were in a generous mood, I could also link to today's front-page Washington Times story about how nothing is happening around the ballpark in terms of development, but if they are silly enough to dub the "new" Courtyard by Marriott (finished in 2006) as one of neighborhood's "signs of progress," then I'm not sure you need to read the rest. Besides, you can just read my roundup of what's changed since the end of last season to find out all you need to know.
We'll see what the weather does on Thursday--people seem to be sounding a bit more optimistic, but be aware that if there's rain, they'll most likely play Friday and not Thursday night.
UPDATED headline, tweaking "before June" to "by June."
 

It's hard for me to believe that this week marks three years since the first Opening Day at Nationals Park, but time does march on. Wednesday evening's NatsFest followed by three games against the Braves (starting with Thursday's 1:05 pm season opener) will bring a lot of people back to Near Southeast for the first time since last summer.
If you're one of them, and you haven't diligently been reading my posts (gasp!), you might be interested in knowing what's been going on since the last time you ventured into this neck of the woods. Here's the big items:
Yards Park: In early September, the first phase of the six-acre Yards Park opened on the banks of the Anacostia, just two blocks east of the ballpark. It's a space unlike any in Washington, and is definitely worth a visit, perhaps even on your way to Saturday's afternoon game, since the park is holding a Family Fun Day that starts at 11 am. (Even if you don't make it to the park right away, you can easily see it from the ballpark's southeastern viewing platform.)
It will probably be a neat place to watch the Friday night post-game fireworks as well (UPDATE: waah! no fireworks this year!), a trip which will be made even easier when a floating bridge connecting Diamond Teague Park--just across Potomac Avenue from the First Base Gate--with the Yards Park is completed, perhaps by the end of the season.
Unfortunately, most people visiting the park in conjunction with a Nationals game won't get to walk along the river all the way to 11th Street: while the Navy Yard has announced that its stretch of the boardwalk is opening April 1, the initial hours will only be from 8 am to 5 pm Monday-Friday.
Foundry Lofts: Just to the north of the new park, work re-started last September on the stalled Foundry Lofts building at 3rd and Tingey, and it is expected to be completed this fall.
Bullpen: It may not be ready by Thursday, but the open-air bar and live music gathering place across N Street from the stadium known as the Bullpen is opening a gameday beer garden to the north of its current spot, on the corner of Half and M across from the west entrance to the Navy Yard Metro station. With close to 80 picnic tables, it will have a capacity of over 600 and will offer European beers, sausages and other like fare, and a quieter environment than the original Bullpen (which will be remaining open for this season as well). The name of the new spot? Das Bullpen. (Yes, that's the moniker I flippantly gave the project back when the news first broke, which the owners decided to go ahead and use. #winning!)
Capitol Quarter: If you park in lot T on 3rd Street, SE, you'll see new townhouses going up directly across the street as part of Capitol Quarter's second phase of construction.
200 I: Just to the north of lot T and right by the Southeast Freeway, you'll see the old Star/Post Plant at 225 Virginia Avenue in the process of losing its exterior "skin" as it moves toward becoming 200 I Street, a DC government office building that will be completed next spring.
Canal Park: Right in the middle of things, across from the Five Guys and Subway, you'll see construction at last underway on Canal Park, the stretch of 2nd between I and M that at one time was a schoolbus parking lot and which has been plain open space for the past two years. The park is expected to be open by spring of next year, and so during the next 12 months expect there to be almost no parking along 2nd; the eastern part of the street is closed altogether. Also, note that L Street is closed for this one block, so you can't use it to get from New Jersey to 3rd or vice versa.
Harry's: If your path to and from the ballpark includes a walk down New Jersey Avenue (perhaps from the Capitol South Metro station), and you find yourself in desperate need of adult beverages, Harry's Reserve has now opened on the southwest corner of New Jersey and I, in the ground floor of the 909 New Jersey apartment building.
Florida Rock: While it hasn't happened yet, plans are for the concrete plant just south of the ballpark to be razed sometime this year, bringing unobstructed views of the Anacostia River to the southeastern viewing platform and clearing the Florida Rock site until the proposed 1.1-million-square-foot RiverFront project can get some financing and get started.
Getting Here: I've got my Stadium Parking map ready to go for 2011, though I've made no additions or deletions on it yet for the new season. I'll wander around this weekend and see if any new lots have popped up or old ones have gone away, though first impressions are that there are no major changes, certainly not in terms of the official Nats lots. (If you see any new lots or old ones that have gone offline, let me know so I can update the map.)
But with this area being a multimodal paradise, your better bet is Metro, or the Circulator that runs from Union Station and Eastern Market, or even Capital Bikeshare, now that there's a station at 1st and N. UPDATE: Forgot to mention the water taxi running from Alexandria, and it's possible that the new American Water Taxi service may get started up soon.
Retail? Eats? Unfortunately, if you were expecting this post to include a litany of new food and retail offerings, you will be just as disappointed as the residents and officeworkers currently are with the continuing lack of options beyond Subway, Five Guys, Justin's Cafe, and Cornercopia. There could be at least two additions before the end of the season, however: another beer garden (separate from Das Bullpen) is under development at 8th and L, SE, and the old "Little Red Building" site at 2nd and L is on its way to becoming "Lot 38 Espresso." Neither project has an announced opening date.
There is also lots of under-the-radar chatter of various restaurateurs starting to look at the area (which I haven't bothered posting, because a) I don't do rumors and b) it shouldn't really be news that they're looking in such an underserved area). With the above projects underway, along with DDOT and the FAA soon moving into 55 M, 20 M now 97 percent leased, and 100 M off the DL thanks to its foreclosure sale, there is a definite shift in the economic winds, and it would not be surprising to get some announcement of some new retail before the end of this season.
For more information on what's changed and what might be changing, check out my 2011 State of the Hood. The BID also did a recent roundup of changes.
If you want to relive the glory days of the ballpark's construction, you can wander through all my exterior and interior photos from that heady time, along with my many photo galleries from ballpark-related events over the years, from the groundbreaking to the topping out to each Opening Day. You can also check out what that part of the neighborhood looked like before the stadium's arrival. (Yes, I'm wallowing in nostalgia. It was a fun time.)
(UPDATED headline, because I can't count.)
 

Today the head of the National Community Church is announcing to his parishioners that a deal has been struck for NCC to buy the People's Church at 535 8th St. SE in the middle of Barracks Row.
With their home base at Ebenezers Coffee House near Union Station overflowing and any completed construction on their new Virginia Avenue footprint probably 3-4 years away, this gives the church an instant "phase 1" building with more than double the capacity of Ebenezers.
Mark Batterson tells me that the first service on 8th Street will be on Palm Sunday, April 17. They'll have one service a week there until the land deal is completed in early June, after which more services and events will be held at the new location, but they'll continue to meet at Ebenezers as well. In time, they are looking at converting the building back to its previous life as a movie theater: it opened as Meader's Theater in 1910, then became the New Academy Theatre before being converted to a church in the early 1960s. (If you've been inside the church, you certainly would recognize the seats and layout as vintage movie theater design.) NCC may even reopen the balcony, which has been closed off as a separate meeting space. They also hope to adapt the stage so that the space can be used for community events; and they're open to suggestions and ideas if you have any.
The People's Church will be moving to Maryland, where most of their members now live.
This gives NCC a bit of breathing room for designing and getting through all the bureaucratic hoops of building at 8th and Virginia, but Batterson considers 535 8th to be a "stepping stone" to the new location. And you can see how excited he is in his recent tweets hinting at the deal, which described to me as a "double miracle for both churches."
UPDATE: Here's Batterson's blog post on the news, with some cool vintage photographs of 535 8th.
 

The April lineup of events at the Yards Park continues to grow: on April 16 it will be host to the DC Challenge, an "Amazing Race" style scavenger hunt through the city. Competitors will "solve tricky clues" to plot the best route and race for cash prizes, and then afterwards there will be a "Finish Line Festival" with music, games, food drink, and the "crowd-judged costume contest." You can register online, and the web site has much more information on what's billed as "America's largest adventure race."
Also, in a slightly different vein, if you haven't already seen it, here's the schedule for NatsFest on Wednesday afternoon.
(One note on my handling of upcoming events--generally I'll post about something when I hear about it, and maybe give another reminder a couple days beforehand if the timing's right, and of course they're all always on my events calendar. But if you want lots of updates and reminders on goings-on at the Yards Park or other events handled by the BID, you'll want to follow those Facebook or Twitter feeds.)
 

Numbers geeks rejoiced on Thursday when the 2010 census numbers for DC were released, and of course I had to dig right in.
The population of Census Tract 72 in 2010 is given as 2,794, an increase of nearly 1,000 residents from 2000 and which accounts for about 11 percent of the entire Ward 6 population increase. The demographic numbers are striking: Near Southeast is now nearly 60 percent white and 31 percent African American, compared to being nearly 95 percent black 10 years ago. It's also interesting that it found 95 percent of the population to be age 18 or older, compared to only 69 percent in 2000. There's also 1,459 more housing units counted in the neighborhood (and that number has certainly gone up since the census was taken).
Here are the numbers:
(You can see an expanded list with percentage change and some additional numbers here, which also shows that the neighborhood's population counted at 2,089 residents in 1990 and 2,994 in 1980.)
The Capitol Riverfront BID has estimated that the neighborhood population was around 3,300 at the end of 2010.
Even though the population of DC itself climbed by nearly 30,000 in the last 10 years, Near Southeast is now a larger portion of the overall population than it was 10 years ago, skyrocketing to a whopping .46 percent of the city's count.
"Tract 72" covers the area south of the freeway from South Capitol Street to 11th Street, but unless people are living east of 11th on their boats (or in a van down by the river), the boundaries would cover all of the residential areas of Near Southeast.
Of course, what future researchers looking at census numbers will never see is how much more the neighborhood emptied out through 2005 (when only 410 M and the private single-family homes were occupied). My guess would be that the population got down to around 400 during that time, if not lower.
Income-related demographic numbers for 2010 aren't yet released, but it's not hard to assume that those numbers will show an equally dramatic change.
And now that the city's numbers are out, the fun really begins with the need to redraw the ward boundaries, which will then beget a redrawing of the ANC boundaries. ANCs are supposed to have about 2,000 residents per single member district--will Near Southeast cease being covered by a single SMD? Or, for that matter, will all of Near Southeast remain in Ward 6, given the noises Marion Barry is making about the necessary redrawing of Ward 8's boundaries? "I'll defend the riverfront," is the quote from Field Marshall Thomas von Wells. (Hey, we kid because we love.) "Ward 6 should remain the same."
(Note: I wrote a slightly different summary of Near Southeast's census numbers for the Post; the numbers cited in that article use the Post's internal numbers by neighborhood instead of going purely by Tract 72. Not sure exactly where the different boundaries are, but I'll stay with Tract 72 here since it's easier to get access to those numbers publicly for checking and comparison.)
 

Michael Perkins at GGW got his hands on the draft version DDOT's 2010 Ballpark District Performance Parking Report, and while I'll leave it to him to handle the in-depth discussion of pricing and meter use in Near Southeast as well as other neighborhoods, there are a few action items in the report that might be of general interest (you should read all 31 pages if you want the nitty-gritty).
Now, this is a draft report, but assuming it becomes final...:
Revenues from the parking program have been able to provide $812,100 for "non-automotive transportation improvements" in 2011, which will include a new Capital Bikeshare location at the Yards Park and $135,000 for a new fence along New Jersey Avenue by the railroad tracks (presumably it won't hide the "Water Pylons" public art coming to the freeway underpass). There will also be two or three other new bikeshare stations somewhere in the Ballpark District parking zones (Near Southeast, Southwest, and southern Capitol Hill), but those haven't been announced.
There will also be a $70,000 grant to partially fund a Capitol Riverfront BID Transportation Study, which the page 25 of the report says will happen during this fiscal year and will look at:
* The need for additional traffic signals and stop signs based on pedestrian and vehicular patterns (and recent accidents);
* Neighborhood traffic circulation patterns including one way street circulation and freeway access and turning movements onto the freeway frontage roads;
* How the CSX tunnel reconstruction will impact traffic flow and SE/SW freeway access/egress;
* Existing and future parking demand and the proposed parking supply to meet that demand;
* On street parking strategies and supply for commercial, residential and visitor populations;
* Optimum Circulator routes and hours of operation;
* Recommended routes for bike lanes that tie into the Riverfront Trail system;
* The optimum route for a streetcar line in the M Street right of way and how it would service the Buzzard Point subdistrict; and
* How M Street is designed and works as a multi-modal transit corridor while exhibiting a high quality of design in the public realm.
Gosh, I'm just not sure if residents will be interested in any of these! If perchance a reader or two might have an idea or data point for the above items, feel free to discuss in the comments.
Note that this study doesn't quite seem to match the overarching Near Southeast/Southwest combined traffic study that got some discussion late last year, but perhaps there's more going on than what's mentioned in the DDOT report.
DDOT is also proposing that non-gameday parking rates at the multispace meters between South Capitol and 2nd Streets from the freeway to M Street go up to $6 for three hours (first hour $1.50, second hour $2.50, third hour $3). Plus, the boundaries of the parking zone will move eastward to 11th St. SE from 9th St.
By the way, if you have a fab idea for how some of the proceeds from the parking revenue can be spent on the aforementioned non-automotive transportation improvements, you can submit a written proposal to DDOT (further information on page 26 of the report). And if you want background on how the Performance Parking Pilot came into existence back in 2008, my Stadium Parking page can help with that.
 

I've gotten a bit more information about the raze permit application at the Florida Rock site, the concrete plant on the banks of the Anacostia directly across from Nationals Park.
According to Florida Rock Properties, the owner of the site, the tenants are building a new plant on land also owned by FRP down South Capitol Street on Buzzard Point (at S and Water streets near the Pepco plant and the Coast Guard building). Once that new site is completed, the existing operations on Potomac Avenue will be shut down and the structures will be razed, which should happen sometime this summer (though timelines on these sorts of projects are never written in concrete, ha ha).
The plant is one of the last specimens of the ballpark area's previous life as an industrial zone, and has housed a gravel/stone/concrete operation since the 1920s, when Smoot Sand and Gravel operated there after moving from what is now the Yards Park site when the Navy Yard expanded its boundaries during World War I. I have taken scads of photos that have included it over the years, and should probably thank my lucky stars that I was never mowed down by any of the trucks coming in and out of there during all my photographing of the ballpark's construction. There was certainly a close call or two.
As I've noted about a billion times over the past eight years, the site's redevelopment plans call for a 1.1-million-sq-ft mixed-use four-phase development, but Florida Rock Properties does not as yet have any deals in place to get this new "RiverFront" project started. In 2009 they received a time extension on their zoning PUD, and are not required to file building permits until June 2012. The site will probably remain fenced and unused in the interim, but at least the dismantling of the tower will finally allow unobstructed views of the Anacostia River, the Douglass Bridge, and the east bank of the river from the ballpark's southeastern viewing platform. Not to mention nicer views of the ballpark from the river, for boats such as those using the Diamond Teague Piers next door. At least until the new development goes up....
 

All sorts of small stuff that has recently been Tweeted, or just left to molder until I finally got around to posting:
* A raze permit application has been filed by the Florida Rock folks for the concrete plant operated by Vulcan Materials Co. on Potomac Avenue just south of Nationals Park. This in an of itself is quite interesting, made even more interesting by a lack of response from Florida Rock Properties when I inquired as to what this planned razing might mean. From what I'm told, raze permits are valid for one year from the date of issuance (and this one hasn't been issued yet). The plan has been for a 1.1-million-square-foot mixed-use project that would include office, residential, hotel, and retail in four buildings, plus lots of open space. (Note that the western part of the project can't be built until the new Douglass Bridge is built and the current one is demolished, which doesn't seem to be happening anytime soon). Whether the current plans will still be going forward with the current owners or if changes are in the works, we'll just have to wait and see, though considering that it took FRP a decade or so to get zoning approvals for the site, it would be no fun to see the process start over again.
* There was a kitchen fire on the 3rd floor of the Capper Seniors building at 900 5th St. SE on Monday night, according to tweets from DCFireEMS. The bulk of the fire was handled by the sprinkler system, they say, and there were no injuries.
* The DC Music Fest planned for the Yards Park on May 7 has been cancelled "due to a lack of funding and sponsorships."
* The Five Guys at Nationals Park will not be back for the 2011 season, says Curbed DC. (The one on 2nd Street across from Canal Park is not affected by this.)
* Speaking of the ballpark, in case your attention hasn't yet turned to baseball, note that Opening Day is next Thursday (March 31), with NatsFest being held at 4 pm the day before. The first series of games (Thursday, Saturday, and Sunday) will all be early afternoon starts (1:05 pm on Thursday and Saturday and the normal 1:35 pm start on Sunday).
And Saturday's game is bookended by Family Fun Day at Yards Park, being held from 11 am to 4 pm in conjunction with the National Cherry Blossom Festival. (Plus there's all the goings-on that day on the Southwest Waterfront, including the big fireworks display.)
 

The proposed 8th Street Beer Garden is back before the Historic Preservation Review Board, with a "substantially simplified" design that the board's staff has deemed sufficiently compatible with the character of the surrounding Capitol Hill Historic District.
The first floor is now proposed to have a brick veneer (though it's not really shown on the new rendering that the beer garden team was kind enough to pass along), and there have been other changes that HPRB staff say have improved the overall proportions of the building. There's also now a pergola (arbor) on the roof to help with shading on sunny days. Sidewalk seating spaces are also shown, though the developer will have to get a public space permit and work around the bus stop currently at the 8th and L intersection.
There are still a few small issues the HPRB staff would like to see addressed, but they have recommended that the concept be approved by the board, and the project has been placed on the consent calendar for the March 24 meeting. (Though the board may choose to remove it from consent if they have any issues they want to discuss before voting.)
You can see a larger view of this revised design alongside the previous version and some current photographs on my new 8th Street Beer Garden page, which isn't exactly a barn-burner but at least it's something. (It goes hand-in-hand with my new National Community Church page, which has photos of the lots NCC now owns.)
The HPRB meeting is on Thursday at 10 am, and will be available via live streaming or on demand. (Or you could go to the meeting in person, but that's so 20th century.)
UPDATE, 3/24: The consent portion of the agenda passed with no discussion, so the design concept is now considered approved by the board ("as consistent with the purposes of the preservation act"), with final approval delegated to HPRB staff.
 

Saturday was a lovely day for taking a couple of walks with camera in hand, and with work underway at locations that couldn't be any closer to my out-of-neighborhood house, I had no excuse to not get some updated photos of 225 Virginia/200 I, Capitol Quarter Phase 2, Canal Park, and the Little Red Building. (It was also nice chatting with the folks who correctly guessed that the oddball standing in the middle of the street taking photos must have been me.)
The showy demolition work is now well underway at 225 Virginia/200 I, and if the few shots and renderings on the project page aren't enough for you, you can do a virtual walk around the block to see which walls and windows are blown out at this point and to compare the current images with their "befores."
No time is being wasted at Capitol Quarter, where framing has now wrapped around from I to 3rd to K Street on the first block of Phase 2. You can take a "walk" around that block, too, if you haven't lately, or wander through the project page, both of which have plenty of images of the old Capper public housing buildings that were on this block for a very long time. I also added to the database some photos of what will eventually be the intersection of 3rd Place and L, once the new street gets built through its second block south of K. If you're big on old Capper photos, there's a few "before" images of L Street buildings in that sent that haven't been displayed on the site before now.
If photographs of fences are your thing, take a "walk" around the Canal Park perimeter, to see many pictures of the "traffic control" now in place in advance of the start of construction on the park (presuming it ever actually comes). Those barriers are going to put a crimp in some of my standard shooting locations for the next year or so, including where I've stood for the past eight years to take photographs of the Little Red Building, which in its new incarnation is now more of a brick red than the beet red it used to be. ANC commissioner Garber posted on Friday that the roof is going in over the next few days, at which point work on the interior can begin, as it slowly progresses toward becoming "Lot 38 Espresso."
Remember that the Click to see all available photos of this location.icon on any page gets you to the full batch of photos I've taken at any location (which, since I'm getting into the eighth year of doing this, can be kind of voluminous in some spots).
(I know that It seems kind of odd to still be posting photos when so many readers now live in the neighborhood, which of course wasn't always the case. But it's my schtick, and so I continue onward! Plus. there are plenty of people interested in Near Southeast who don't wander around every day--or maybe some of the residents don't know what these spots used to look like before....)
 

Just released from the Navy:
"Gates at the east and west end of the waterfront promenade (Riverwalk) at the Washington Navy Yard (WNY), will open for limited public access on Apr. 1, 2011. The WNY Riverwalk terminates at the Yards Park to the west and 11th Street SE to the east.
"The gates at both ends of the WNY Riverwalk will be open during base working hours, 8:00 a.m. to 5:00 p.m., Monday through Friday excluding Federal Holidays. Exceptions to these operating hours will be made when restricted access is necessary to accomplish Navy operations. The Navy may block or restrict access without notice for safety or operational reasons.
"The Display Ship Barry, located along the WNY Riverwalk, will be open to the public with access directly from the Riverwalk when the Riverwalk is open. The Display Ship Barry and the Navy Museum can be accessed through the WNY during normal hours when the Riverwalk is closed. Holders of valid Department of Defense (DoD) identification cards will be able to enter the WNY via turnstiles along the Riverwalk during operating hours. Access for non-DoD identification card holders will continue to be via the WNY visitors center, located at the intersection of O Street and 11th Street SE."
 

(Continuing along with my posts on Monday night's ANC 6D meeting....)
StonebridgeCarras, the folks who are morphing the old Star/Post Plant at 225 Virginia into a new DC government office building at 200 I (I'm still fighting that address) came to ANC 6D looking for support for a public space permit covering the landscaping, paving, sidewalks, and other exterior improvements.
There are a number of large oak trees surrounding the building, and Jane Mahaffie of Stonebridge said that they are "going to great lengths" to save as many of them as possible, although arborists have already determined that two or three of them need to come down. (At least one of those trees, however, will be dried out and reused in the rebuilt structure.) You can see on the graphic at right (see larger version) the larger trees that denote which ones are expected to be saved. Of course, when CSX digs its trench, the trees along Virginia Avenue may not end up being quite so lucky....
The landscaping will not be on too grand of a scale, since the city will be responsible for maintaining it and isn't exactly rolling in dough.
What is also depicted on this drawing that hasn't always been obvious in the renderings of the new 200 I is the parking deck planned for the southEAST corner of the block. It's a one-story deck, with an entrance on 3rd Street for visitors to park on the roof of the deck, and another entrance on I Street for DC government staff to enter and park either on the lower part of the deck or in the basement of the building. (There are upwards of 200 total spaces, if memory serves.)
But, as anyone who has walked north on 3rd Street to the freeway can tell you, there is a considerable rise in the grade of the street, so while the parking deck will look one story tall down at I Street, it will actually be at the same level as the street up closer to Virginia, as you can see in this rendering of what the deck and its "dense buffer plantings" will look like as seen from 3rd Street:
The larger version of the above graphic has additional renderings of the parking deck as seen from 3rd and from I, showing how the designers are attempting to hide the deck as much as possible, especially as time goes on and the plantings mature.
The ANC voted 7-0 to support the public space permit.
If you haven't been following along, 200 I is expected to be home to the Office of the Chief Technology Officer, the DC Child and Family Services Agency, and the Commission on Arts and Humanities. Its new entrance will be on I Street, facing Canal Park, and the lobby will include a gallery of artwork that will be open to the public (without having to go through security). There also may be some small "incubator" service retail in the southwest corner of the building. The developers are going for LEED Gold certification, and 50 percent of the new roof will be "green." Exterior construction is expected to be completed by January of 2012, with move-ins expected to happen in late spring of '12. You can see renderings of the lobby and more photos on my 225 Virginia project page.
(And, one more 6D recap to come.)
 
2608 Posts:
Go to Page: 1 | ... 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 ... 261
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.