|
| ||||||||||||||||||||





There's been a lot of positive news in the neighborhood of late, but news today from Canal Park will be disappointing to many residents and observers: Because of "major underground obstacles" that weren't found until workers started digging, the park's underground storm water system is having to be completely redesigned and then approved by DC Water. |
Comments (18)
More posts:
Canal Park
|
|
Comments (0)
|
* Readers are reporting that the fence is coming down around the Bullpen on Half Street. This would be in preparation for the new Fairgrounds offering. Designs show that the new "fence" will be shipping containers, which makes sense given that the venture is centered around a shipping container market. Their intent is to have it up and running by Opening Day. (Read my Fairgrounds post from a few weeks ago for much more detail.)|
Comments (12)
|
There is no official announcement of this, but after finding a detail buried deep in some public records that jibes with some whispering I heard a few weeks ago, I'm going to pass along the rumor that a deal is in the works that would bring developer McCaffery Interests to the empty Willco Companies lot on Square 701 along 1st Street south of M, where Nats Parking Lot F currently operates.
Any designs for the site would need to go through a zoning commission review because of its location in the Capitol Gateway Overlay, and I've heard that there has been a recent meeting with at least one city agency, so *something* is afoot with this site. Whether the previous design concept of office/residential/retail is in play or something new is coming remains to be seen. |
Comments (1)
|
I'm hearing that 100 M Street, the 220,000-square-foot office building on the northeast corner of 1st and M, is up for sale. This is the building that was completed in late 2008 by Opus East, then spent some time in limbo during Opus's Chapter 7 liquidation. It was picked up in foreclosure for $57 million in fall 2010 by Northwood Investors. |
Comments (0)
More posts:
100 M, Development News
|
|
Comments (3)
More posts:
Canal Park, Canal Park, Events, Restaurants/Nightlife, Foundry Lofts/Yards, Potbelly, Nationals Park, Stadium Events, The Yards
|
Embarrassingly, I haven't had a camera in hand on the Navy Yard's portion of the Anacostia Riverwalk since 2004. (I'm always worried they're going to toss me in the brig as a security threat, especially after a run-in a few years back where I was chased down by both a gate sentry and the DC police after taking photos of the Hull Street gate from across M Street.) But I pushed forward yesterday and got a bunch of new shots that I've added to my Navy Yard page, taking care to demonstrate to the many security cameras that I was photographing the river and not the installation. (Don't miss the especially cool before-and-after of the gate to the Yards Park.)
links to see before-and-afters.
|
Comments (5)
|
* Capitol Hill Day School has moved back into its digs at the Dent School north of the freeway after spending the fall and early part of 2012 in "modular classrooms" on the Capper Community Center site at 5th and K, SE. |
Comments (2)
|
Another large apartment building for Near Southeast appears to be on the boards, with word filtering my way that Ruben Companies has begun working with Shalom Baranes Architects on designs for a 400-unit rental building on Half Street between I and K. |
Comments (21)
|
|
Comments (0)
|
Not exactly stop-the-presses news, but I would be shirking my fiduciary duties if I didn't make note of the fact that the all-black building on the southeast corner of South Capitol and M was demolished on Wednesday. |
Comments (2)
More posts:
M Street, Nat'l Assoc of Broadcasters HQ
|
I wrote recently about the bumpy first trip back to the Zoning Commission for the new designs for the project known as Florida Rock. The developers (MRP and FRP) want to build a residential building at 1st and Potomac instead of the originally planned office building, and also are looking for some tweaks to the plans originally approved in 2008 by the Zoning Commission for the rest of the six-acre site.
On Monday, Feb. 13, the full commission took up the case again. Despite the developers offering to increase the total amount of retail for the entire site by about 11,000 sq ft (up to 36,370 sq ft total), vice chair Konrad Schlater again felt the retail offerings to be lacking, describing the designs as having "no vision" and a "missed opportunity" for one of the city's few large-scale waterfront developments, adding that he doesn't get the sense that the design takes full advantage of the site and "how it can meet the waterfront." |
Comments (2)
|
|
Comments (2)
|
|
Comments (8)
More posts:
Boilermaker Shops/Yards, Retail, Nationals Park, Stadium Events, Stadium Events, The Yards
|
The first tenant for the Lumber Shed building at the Yards Park has just been announced by Forest City: the Italian restaurant Osteria Morini, by New York City chef Michael White. It will be a 4,250-sq-ft space, and is expected to open in the summer of 2013. |
Comments (6)
|
Modeled on Brooklyn's Dekalb Market and designed by Schlesinger Associate Architects, Fairgrounds will use salvaged shipping containers as retail spaces for vendors, in a program overseen by Diverse Markets Management, the people behind the flea market across from Eastern Market and the downtown holiday market. DMM touts a database of more than 2,000 vendors that it says it will tap into to "keep the market busy and diversified."
The Market (seen above and at left, click to enlarge) will be positioned on the Das Bullpen site at Half and M, across from the Navy Yard Metro station entrance. It will include "permanent" food truck versions of two of Blair's restaurants: Bayou and its New Orleans/Southern-themed food and drinks, and Surfside with its beach-type offerings. There are also plans still being worked out to have a rotating roster of additional food trucks every non-game day.
But, in what will probably be even bigger news to people who have been watching this area closely for a long time, Akridge says that they hope to begin construction this summer on the first phase of their 700,000-square-foot Half Street mixed-use development. Their intent would be to start with the 280ish-unit residential building on the south end of the block (directly across from the stadium), and the Fairgrounds' design would make it easy to just move the wall of containers further north on the site to still leave an events area available if indeed they do get underway before the end of the baseball season. The project also includes plans for two office buildings on the north end of the block, along with ground-floor retail along Half, M, N, and a pedestrian walk between the office buildings.|
Comments (30)
More posts:
West Half St., Fairgrounds/Bullpen, Restaurants/Nightlife, Retail, Nationals Park, truckeroo
|
|
Comments (2)
More posts:
photos, Rearview Mirror
|
|
Comments (3)
More posts:
bikeshare, Pedestrian/Cycling Issues
|


























