Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2940 Blog Posts Since 2003
Go to Page: 1 | ... 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 ... 294
Search JDLand Blog Posts by Date or Category

Now that the Park Tavern looks just about ready to open (and the grapevine tells me it got its liquor license on Monday morning), it looks like Xavier Cervera is turning his attention to the project we have known as Willie's Brew and Que at the Boilermaker Shops at the Yards.
According the latest batch of approved building permits, a building permit has been issued (to Williams Willies Sports, technically), for a restaurant with 109 seats and 156 occupancy load.
So now everyone can start keeping an eye out for any work in the space on the Boilermaker Shops' western end, on Tingey at 3rd Street. (The photo above is from a visit I made to the Willie's spot back in September.)
Other items worth noting in the latest permitting blitz:
* The Park Tavern has gotten its permit for a 75-seat summer garden.
* Gordon Biersch's outdoor seating has been reduced from a 94-seat area to a 60-seat summer garden.
Then there's this additional tidbit, which needs to have a glaring "CONJECTURE!" label attached to it. But a few weeks ago EYA got a soil boring permit for 908 2nd Street, SE, which is the empty parking lot owned by the Housing Authority between I and K and between Canal Park and EYA's now-completed Capitol Quarter townhouse project. I have heard rumors for a while now that there's been talk of another deal between EYA and DCHA, though not for townhouses this time around. The empty lot where the soil borings took place is part of the Capper Hope VI footprint, and the plans have always been for a six-story, 147-unit mixed-income building on that site. Is something in the works? All together now: We shall see!
 

It seems like it's been forever since baseball was at Nationals Park (except for that Game 5, which feels like yesterday), and now we're in the final homestretch before the team returns to town, first for an exhibition game against the Yankees Friday, March 29, at 2 pm, followed by the season opener at 1 pm on Monday, April 1.
So, once again I highlight my Visting Nationals Park page, which I built last year to bring together links and information both about the ballpark itself and what's available and interesting outside the stadium.
For those wanting to know what's happened in the Near Capitol Ballpark River Yards (#NeCaBaRY) neighborhood since last season, my What's New and Notable list fills in the headlines, while the Google Map of Food and Drink options shows both the currently opened eateries and the ones coming soon.
There's also links to information on the Riverwalk, the Yards Park and new-to-you Canal Park, and the Navy Yard, for people looking for other ways to pass the time before and after games.
As for the ballpark itself, there's my map of official and "cash" parking lots, a "Getting There" guide, and of course all of my photos of the stadium's construction and milestones.
But, for people who can't even bear to click a link, I'll give the headlines that I know are most of interest:
* Brewery/Restaurant Gordon Biersch should open on Opening Day at 1st and M.
* The Park Tavern at 2nd and M could be opening Any Minute Now.
* Kruba Thai and Sushi at 3rd and Water in the Foundry Lofts has been open since November.
* Highly anticipated brewery Bluejacket is expected to open at 4th and Tingey in the Boilermaker Shops in late spring or early summer, as will Nando's Peri-Peri, Buzz Bakery, and (maybe) Willie's Brew and 'Que.
* Later in the summer should see the opening of the first two restaurants in the Lumber Shed at the Yards Park: Agua 301 (which has just begun its buildout), and Osteria Morini.
There's also still Justin's Cafe, Five Guys, Subway, Potbelly, Lot 38 Espresso, McDonald's, and the Fairgrounds.
And, alas, there's also still the hole in the ground at Half and N.
On the bright side, there are two new holes in the ground where work is actually underway, for new apartment buildings the Park Chelsea at New Jersey and I and Twelve12 at 4th and M, both expected to open next year.
And the Camden South Capitol apartments directly across South Capitol from the stadium are opening in just a few weeks.
In other words, believe it or not, good things are actually happening outside the ballpark. And it seems like good things should be happening inside the ballpark this year, too.
So bookmark the guide and use it whenever you come down to Near Southeast/Capitol Riverfront/Navy Yard/Nats Town/#NaYa/#NeCaBaRY.
 

The latest presentation slides from last week's 11th Street Bridges project's Community Communications Committee Meeting have been posted, and a few of them caught my eye (or bought my eye, for you fans of obscure Monty Python references). TheWashCycle recently posted a photo of the work underway on the overlooks that are now under construction just down-river of the new local bridge, using the old piers as their bases, and this is what they are expected to look like when completed (click to enlarge):
There is also a rendering (seen at right) of how the Anacostia Riverwalk Trail will run both under the bridges and down from O Street when finished; it also shows the small overlook that will be built out into the river just to the east of the entrance gate to the Navy Yard Promenade. WashCycle also got a recent photo of the path under construction, where you can see the outlines of what the rendering shows is coming.
The presentation slides also have some photos of the demolition underway on the old outbound freeway flyover, and aerial photos of the work that's completed and still underway on the east side of the river. There's also, on page 21, an image which looks like they've already almost completed the filling-in of the portion of the Southeast Freeway between 8th and 11th, since it shows dirt almost up to the underside of the existing bridge that takes 11th Street across the sunken freeway between I and L.
What all of this really means is that I need to get back to 11th Street with my camera pretty soon, since my last batch of photos is now a bit dated (waaah!).
 

The Yards has announced on its Twitter/Facebook feeds that furniture store Desi Living Loft Furniture is coming to the Foundry Lofts in June.
The company, which according to its web site currently has locations in Rockville, Arlington's Pentagon Row, and Annapolis Towne Center, bills itself as "the DC area's premier stop for the most affordable, stylish, and unique concepts in living room furniture." Presumably this is coming to the retail space on the building's southeast corner, next to Kruba Thai and across from the Lumber Shed at the Yards Park.
This would be the first non-food non-services retailer to open in the neighborhood (other than CVS).
I've reached out to Forest City for more information, and will update when I get it.
UPDATE: The store will be a 3,000-square-foot showroom, and the official press release says "late spring" for opening. The release also gives a slightly different name for the company than its own web site, calling it "Desi Living Loft Furniture," apparently because this will have a slightly different type of furniture mix, so I've changed the title of this blog post.
 

I wandered around on Thursday, it was sunny, I had my camera in hand, etc., etc., yadda yadda yadda.
Some items of note (click photos to embiggen):
On your left, hard-to-get evidence of the ongoing work at Bluejacket at the Boilermaker Shops. They've covered up all the eye-level windows, but peeking through the (dirty!) glass above the large door on 4th shows the fermenters now installed on the mezzanine level.
At right, my first viewing of the renovated Team Store at Nationals Park's Center Field Gate.
Below, the Lumber Shed in the sun.
Agua 301's space is to the left, and Osteria Morini's is to the right. (On the ground floor.)
And, everyone's dream come true, a parking garage being born:
Of course, it's actually the parking garage that will be underneath the Harris Teeter in the Twelve12 apartment building at 4th and M, so it's probably allowed. If you want even more photos of rebar and concrete, my Twelve12 page has them.
 

The Washington Business Journal has a short piece on Agua 301, the "modern Mexican" restaurant coming to the Lumber Shed at the Yards Park.
The restaurant, developed by the same people who run Zest Bistro on Barracks Row, will be on the building's southwest side (the left side in the photo at left, closest to the pedestrian bridge), and buildout is apparently now getting underway, with the owners "hoping for" a late July opening.
It is a 3,500-square-foot space, and will have 107 seats indoors, plus another 43 on the patio.
So, let's do a run-down of the next few months:
Canal Park's Park Tavern could be close to opening {ahem}, so let's call that March.
Bluejacket says "May/June" for its highly anticipated arrival at the Boilermaker Shops.
Nando's Peri-Peri says June for its opening, also at the Boilermaker Shops.
Agua shooting for July.
No dates other than "summer" have been announced recently for Osteria Morini, Chef Michael White's Italian restaurant planned for the southeastern corner of the Lumber Shed. So, August or September might not be out of the question, though until a buildout is underway, that would just be speculation.
Also no dates for Buzz Bakery or Willie's Brew and Que at the Boilermaker, though since Buzz is by the Bluejacket folks, perhaps it'll come around the same time? UPDATE: A Facebook commenter passed along this Hill Rag piece by the Capitol Riverfront BID's director, saying that Buzz is aiming for an April opening. Willie's remains a mystery, though.
Anyway, basically one new restaurant a month from now through summer is a little bit different from what the neighborhood has seen since, well, ever. (Though, of course, we know how targeted opening dates can sometimes slide...)
For Nats fans doing a little preseason salivating, here's my map of where the neighborhood's restaurants are, and will be. (If you haven't been to the neighborhood since last season ended, you'll also want to note the arrival of Kruba Thai and Sushi at 3rd and Water Streets, in the Foundry Lofts building at the Yards.)
 

On Saturday, the Park Tavern restaurant at Canal Park sent this out on Twitter:
"Our new chef is in place!! Should be about 10 days until we open. More details to come"
Is the opening really now looming? We shall see...!
 

Forest City Washington is moving forward with the plans for a sixteen screen movie theater near Nationals Park, having submitted a truckload of documents this week to the Zoning Commission for its plans to redevelop more than five acres of land currently occupied by DC Water.
This site, which sits between the current footprint of the Yards and the ballpark, would be turned into four new city blocks with 600 residential units in two buildings, an expansion of Diamond Teague Park, and somewhere around 50,000 square feet in retail, which would include the theater that we first heard about a few months ago.
The plan apparently would be to build the theater first (and in fact FCW is requesting second-stage PUD approval for the theater plans, for those of you who know what that means), and in the zoning filing FCW says that they intend to file for building permits by this fall and start construction by the beginning of 2014, with an expected opening of the theater by late 2015.
There would be 337 parking spaces at the theater, which would be above-ground and contained within the first four floors of the theater building. DC Water would continue its operations on the other three blocks that are part of this plan while the theater is constructed and operating, with the development of those blocks waiting until those operations can be relocated (and, of course, "subject to market conditions)."
A few months ago I wrote in great detail about the plans for the theater itself, expected to be operated by Showplace Icon, after a public meeting was held for residents about the crowds that might be drawn, who seemed mostly mollified by the "policies to encourage courteous behavior." Read that post for more.
There should be a hearing on these plans within the next few months. And I'll dig through the documents to look for more tidbits, but mainly I wanted folks to finally see a rendering!
 

The Post's Going Out Guide is reporting that the Gordon Biersch at 1st and M is planning for an April 1 opening, which just happens to be the Nationals' 2013 Opening Day as well.
GoG says the restaurant will open at 11 am seven days a week, with happy hour from 3 to 6:30 p.m. Monday through Friday. The bar will stay open open until 2 a.m. Friday and Saturday, and midnight the rest of the week. (Food looks to be available until 10 pm Sunday-Monday, 11 pm Tuesday-Wednesday-Thursday, and midnight Friday-Saturday.)
The restaurant will have 226 seats inside, along with another 88 on the planned outdoor patio (they have applied for the required public space permit, but it's not approved yet). Might be a bit crowded on game days, but it will be interesting to see what kind of crowds it draws the rest of the time, especially from outside the neighborhood.
The location is now on the Gordon Biersch web site, too. And the head brewer has popped up on Twitter.
(The next question: will Biersch end up opening before the Park Tavern, which is now apparently delayed again?)
 

It must be a sign of a revved up fan base that I'm already starting to receive queries about the lineup of available parking lots around Nationals Park, with over a month to go before Opening Day.
There's still a lot in flux, but the big news is that three of the lots that have long been in the official Nats inventory are not there for 2013. But users of the lots formerly known as J, N, and M should know that I've talked with Monument Realty and have confirmed that these lots will be cash lots this season. (If you're not in the know on the lot lettering, these are the lots at South Capitol & N SE, South Capitol & M SE, and the northwest corner of Half & M SE.) Rates and details are still to come, and it's possible that season passes for the lots may be sold as well. If you're interested in keeping updated on these three lots and don't trust me to tell you the latest (boo), you can e-mail natsparking@monumentrealty.com to be added to their distribution list.
What seems to be causing some angst, though, is that the $5 economy lot under the SW Freeway at South Capitol Street, known as HH, is also apparently no longer in the official inventory. I haven't been able to track down who is running that lot to find out if it will still be available for cash parking, but will keep trying.
There appears to be one new official Nats lot this year, labeled Lot P, positioned on the team's map next to existing Lot K. If that position is correct, it would be at 1015 Half Street, which would make it garage parking, though it's not labeled as such on their map. I've written the team to confirm that 1015 Half is the actual location, but have not heard back.
I've also been in touch with folks at the Yards and they say that they are planning to offer the same parking lots as they did last season, including the "new" lot that became available at 1st and M when the National Geospatial Intelligence Agency folks decamped in 2011. Prices for those lots are still under discussion. (UPDATE, 2/25: The folks at the Yards are clarifying and now saying that their easternmost lot, on 4th south of Tingey, won't be available this year. Map is updated.)
It also looks like the Nationals raised the single-game parking prices for Lots T and U on 3rd Street by $1 for non-"prime" games, to $21 and $26, respectively. ("Prime" game cash prices at the official lots range from $15 to $45, compared to $10-$42 for nonprime.) Season ticket holder prices seemed to go up by $2 in most lots, except for Lot T ($1) and Lot W, which remains the one "economy" lot at $10.
As to whether the non-official cash lots scattered around the neighborhood that were available in 2012 will still be operating in 2013, we may just have to wait until Opening Day to see what lots are operating where, and for what prices. (For now, I've left the 2012 prices on the map.) The only non-official cash lot from 2012 that I know to be gone this year is the old Lot K at 2nd and H, which is now where the big Park Chelsea hole is being dug.
I've updated my Stadium Parking map with all the changes that I know of, and will keep updating it as more information becomes available. And any tips on the cash lots' operations as the season gets underway are always appreciated.
Comments (7)
More posts: parking, Nationals Park
 

You don't have to wait for the Wednesday print edition of the Post to see the lead article in the Food section, previewing the Bluejacket brewery coming to the Boilermaker Shops at the Yards this spring.
Quoting: "If most craft breweries are akin to spacious but modest homes, Bluejacket, when it opens in May or June, will be a small mansion with all the amenities. The quantity and variety of equipment, much more than a brewery of its size would usually have and all custom-built, will arguably make Bluejacket like no other small brewery in the country: a facility that [Neighborhood Restaurant Group] hopes will turn out a staggeringly diverse, constantly changing array of topnotch beers."
After much describing of the how Bluejacket's approach to its brewery differs from many other ventures in the US, the Post asks, "So what, then, will be the end result of this perfect-world brewery buildout? Once we descended from the mezzanine to the ground floor, Engert began describing a wildly ambitious beer program: 15 drafts and five cask ales at all times, plus five drafts from other breweries, along with an assortment of house beers in 375- and 750-milliliter bottles and even magnums and Jeroboams. He wants to implement the same sort of constant rotation that is a hallmark of Birch & Barley/ChurchKey and other NRG restaurants."
I haven't been inside the space since September, but the photos I took that day, from before the buildout began, should help envision the setup that the Post piece describes.
 

With the reconstruction of the old Southeast Freeway east of 8th Street into the new Southeast Blvd., DDOT is running a transportation planning study that is looking how best to integrate this rebuilt stretch of road with the adjacent neighborhoods between 11th Street and Barney Circle. To that end, there is a public meeting about this "opportunity for adaptive reuse" being held this Thursday, Feb. 21, at 6:30 pm at Payne Elementary School at 1445 C St., SE. Representatives of DDOT and the technical team working on Southeast Blvd. will be there to provide details about the study and future plans for the area, as well as to answer questions.
This would probably be the perfect forum to ask some of the questions that have been posted in the comments here, such as whether the new boulevard will have an intersection with 13th Street, and how the pedestrian/cycling trail planned to be built alongside the boulevard will be handled.
 

The resident organizers of a drive to transform the warehouse at Half and L Streets SE into a "Half Street Market" are holding a public meeting on Tuesday, Feb. 19 at 7 pm at 200 I Street (aka the Post Plant, aka 225 Virginia Avenue).
The "idea and design team" -- now with neighboring ANC 6D07 commissioner David Garber taking on a larger role and 6D02 commissioner Ed Kaminski having "stepped away," according to Garber -- are wanting to have the building become a "public market, restaurant(s), and culinary incubator/training center."
There's no indication from GSA that the building's move to the surplus list is imminent, and there's also questions on how exactly the building (on such valuable land, just north of the Navy Yard Metro station's Half Street entrance) would escape being auctioned to net the feds millions of dollars and instead be transferred to the city and/or some as-yet-uncreated nonprofit group. This would have to happen under the federal guidelines for acquiring federal real property for educational purposes, which includes applying to the Department of Education to sponsor the transfer and which would seem to require that the incubator/training center be the centerpiece of the building's new mission. On the other hand, Garber recently described the project in an e-mail to his neighborhood mailing list as "still in its infancy and constantly evolving," so no doubt the organizers of the drive to acquire the building have a plan they feel will meet the feds' requirements.
I probably won't be at the meeting, so if you're interested in the project, best get thee to 200 I on Tuesday rather than looking for a summary here.
Comments (0)
More posts: 49l, halfstmarket, meetings
 

It might be a little hard to think of sitting in Canal Park watching movies on a warm summer night when folks are still skating on the park's rink, but the Capitol Riverfront BID has now released the list of 10 movies that will be shown at the park in this year's Summer Outdoor Movie Series, on Thursdays beginning May 30th.
This year they are going with a comic book theme, so get your inner geek fired up for these offerings:
May 30th - Captain America
June 6th - Green Lantern
June 13th - Iron Man
June 20th - Batman and Robin
June 27th - The Hulk
July 4th - No Movie (Holiday)
July 11th - Batman Begins
July 18th - Thor
July 25th - The Dark Knight
Aug 1st - The Avengers
Aug 8th - The Dark Knight Rises
 

A hail of bullets on various retail, restaurant, and recreation-type items, some of which are relatively new, but some of which decidedly aren't:
* The boxing and fitness club DCBFIT opened last week in the ground floor of Capitol Hill Tower, at the corner of New Jersey and L SE. While their web site makes me tired and sore just looking at it, I'm sure there are plenty of folks who will find this offering intriguing.
* Gordon Biersch, coming soon to 1st and M, has "Now Hiring" signs up: go to Work4GB.com.
* Also hiring, according to commenter JT who passed along the Craigslist link, is the Park Tavern at Canal Park. The Hill is Home says that it's opening "very soon," even saying "around the 20th of February," but We Shall See.
* Nando's Peri-Peri now has signage up at the Boilermaker Shops--it's a little more than halfway down Tingey between 3rd and 4th, closer to the Bluejacket end of the building. It's supposed to be opening this spring.
* The Navy Yard portion of the Riverwalk was supposed to reopen today--anyone give it a shot yet? And, if so, is there any actual trail once you go out the east gate? As I showed a couple of weeks ago, the old asphalt had been ripped up as part of the 11th Street Bridges work, though of course it will be back at some point.
* Maybe now is finally a good time to mention the opening of petcare store Wagtime Too at 900 M Street, where it has been for a number of weeks now, offering boarding, daycare, grooming and "cool stuff." And I actually have taken a photo of it.
* Apparently the Quizno's at 8th and Potomac closed permanently back in December. And Chicken Tortilla at 8th and L was closed when I walked by a few weeks ago, though I don't know the story on that.
UPDATE: Yes, the Riverwalk is apparently open. And I meant to also mention that Kruba Thai and Sushi's web site is now up and running.
 

When wandering by the Gordon Biersch space earlier today, I managed to sneak a peek inside:
I also caught some more fermenters arriving, plus some signage (click to embiggen):
The sign kind of says it all, right? "Early April" -- will they manage to make Opening Day?
Seems hard to believe this is actually coming. There is also a public space permit application in the window for unenclosed sidewalk seating, so you can look forward to dining al fresco at 1st and M while hordes of Nationals fans traipse past in the summer.
(I also added these photos, and a few others, to my 100 M page, which I kind of hadn't really looked at since the building opened in 2008.)
 

A few weeks ago, Google updated its satellite images of the DC area, including of course Near Southeast.
It appears to be from early October 2012, perhaps Oct. 13, since there's an event at the Yards Park that could be Snallygaster, plus the postseason signage is on the Nats diamond, and the trash transfer station's final demolition is just underway.
As I've done with each new image since 2002(!), I've posted it on my Images from Above page, where you can choose to display multiple versions going back to 1949(!!) to compare them.
I also always highlight the changes from the previous image, which in this case means the completion of Capitol Quarter's second phase, the Teague-Yards bridge, the Florida Rock site clearing, the 11th Street Bridges construction, and more.
If you want to zoom into the historic images, Google Earth allows you to view archival versions. (For the record, I love the ghostly images of Nats Park under construction in the 2006 shots.)
Comments (2)
More posts: Rearview Mirror
 

As I wrote a few days back, the portion of the Southeast Freeway between 8th Street SE and Pennsylvania Avenue will be fully closed after the evening rush hour on Thursday, Jan. 31, to both begin work on the new Southeast Blvd. and to demolish the existing outbound flyover ramp and replace it with a new three-lane one.
One thing I didn't mention in that post is that, with these closures Thursday, both the 8th Street SE on-ramp to the outbound I-695 freeway bridge and the 9th Street ramp toward Pennsylvania Avenue will be closed.
As the helpful graphic at right from DDOT shows, if you're wanting to get on I-695 outbound, you'll need to use the ramp on the southeast corner of 11th and M.
Since this closure now makes the Southeast Blvd. project truly seem underway, I've been spurred into an unexpected burst of action, and have created a Southeast Blvd. project page, separate from my recently refreshed 11th Street Bridges page. Right now it's mainly drawings, "before photos," and links to my previous posts on the project, but I will keep it updated throughout the expected 18-to-20-month span of construction:
I also threw together a new 11th Street Bridges Progress Photo Gallery with some new shots from this past weekend, when I traipsed around N and O streets and up on the local bridge for the first time in way too long.
And now I think my guilt over some long-neglected photos is assuaged, at least for a little while.
 

Some quick shots from today of the other projects underway at the Yards, in case a new dry cleaners just isn't exciting enough for you.
The new exterior glass is now almost completely on the Lumber Shed at the Yards Park, where Osteria Morini and Agua 301 are slated to be tenants when it opens later this year (along with Forest City Washington on the second floor):
A before-and-after that can't possibly be resisted:
Facing the Anacostia:
Meanwhile, over at the Twelve12 apartment building project on 4th Street (more popularly known as the Harris Teeter/Vida Fitness building), the progress isn't quite as showy, unless you're a construction nerd and you know what the arrival of a tower crane means:
Yes, it means that vertical construction is not far off. The building is expected to be completed in 2014. And in case you want one more shot of the hole in the ground:
See the project pages for the Lumber Shed and Twelve12 for renderings and additional details.
 

The Boilermaker Shops at the Yards now has its first operating retail tenant, with Wells Dry Cleaners having at last opened its doors to the public. (Note that I avoided any "it's about to open" posts, having learned my lesson the hard way too many times in the past!)
It's open from 7 am to 7 pm Monday through Friday and 8 am to 6 pm on Saturdays, and is closed on Sundays. It's right next door to the Willie's Brew and 'Que space, much closer to 3rd Street than to 4th.
(Fun signage, too! Check out another view of it from the side, to see the smaller sign sticking out for easy reading when walking the long length of the building.)
 
2940 Posts:
Go to Page: 1 | ... 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 ... 294
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.