Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2981 Blog Posts Since 2003
Go to Page: 1 | ... 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 ... 299
Search JDLand Blog Posts by Date or Category

In another blast from the past, we've learned from WBJ that the Cohen Companies have filed zoning paperwork for their proposed project at 1333 M Street SE, a mere 3 1/2 years since they last discussed the development of this three-acre triangular plot of land east of the 11th Street Bridges near the Anacostia River.
However, it's no longer the 815,000-sq-ft office/hotel/retail project that was unveiled in 2010 -- Cohen, developer of the Velocity Condos at 1st and L, now is proposing a four-phase, three-building project with 673 residential units and 10,370 square feet of retail use. WBJ quotes Eric Siegel of Cohen as saying "the office market is just not there" in DC, and that the company felt that "creating a sense of place with a residential community was a much better opportunity than just creating an office environment."
Currently the site is home to, well, not much. Temporary trailers and surface parking were installed as part of the 11th Street Bridges project, and this stretch of M is pretty ripped up now as part of DC Water's big dig. To the west of the site are the two buildings and large surface parking lots of Maritime Plaza, and south of Water Street is the stretch of waterfront uses known as Boathouse Row. The invisible "intersection" of 13th and M is probably known to passersby only because of the somewhat incongruous mini-traffic circle built there. The eastern end of the triangle is where Water Street meets M, which isn't exactly exciting either (though my photos of that spot are from before DC Water started ripping it up). Directly to the north of the triangle are both the CSX train tracks and the stretch of road that is on its way to becoming Southeast Blvd.
The first phase of the project would be a 10-story, 218-unit building, viewed in the design as the first of two towers in a single building at 1333 M. A large open lawn area would be installed to the south of the building, at least until construction of the second tower, planned for Phase II, which would have 133 units in a nine-story building.
Together, the two buildings would have 7,200 square feet of retail and 112 parking spaces. A retail plaza would be on the south side of Tower B, and a ground-level pool would be built during the second phase between the two towers, as would a large "grand staircase" down to Water Street from the promenade along the southern edge of the property that is expected to be built during Phase I.
Phase III/Building 2 would be built on the west end of the triangle and would have 234 units in an 11-story building that would also contain 3,170 square feet of retail, and Phase IV/Building 3 would be a teensy nine-story 88-unit building on the eastern end of the site.
There would also eventually be a new street coming off the traffic circle on a portion of the south side of the site at 13th and M, named Virginia Avenue since it is on the footprint of the original avenue (which disappeared east of 11th at some point many years ago).
The zoning application describes the project as "a visionary mixed-use development that reactivates the Anacostia River and provides evocative public spaces giving a full life cycle to the previously underutilized site," intended to "celebrate the waterfront, by creating a dynamic promenade down to the river with a flexible retail plaza space where pedestrians, cyclists, retail users, residents and cultural events come together."
It may be worth noting that, should the Maritime Plaza folks ever build the final phases of that development, the river views across huge parking lots to the southwest of the Cohen site will probably be altered somewhat.
Someone will probably ask about the remediation issues for this site (which I mentioned back in 2010). This is part of the old Washington Gas/Steuart Petroleum site, and it was previously discussed that soil approximately 11 feet below grade is contaminated. There is no mention in the new zoning filings about this, but I'm guessing it will be brought up at some point. UPDATE: The magic of Twitter allows me to get word that Cohen says the contamination has been cleaned.
I could go into all manner of additional detail about the plans, but with a project this big with a zoning PUD to go through I figure I have plenty of time to get to the nitty gritty. But don't let that stop anyone from hashing over the design, the location, the probability of completion, and more. (Meanwhile, compare it all to the 2010 office/hotel/retail plans, just for the fun of it.)
Comments (28)
 

The Post's CapBiz section reported yesterday that "In an effort to take advantage of some of the boom in development near public transit, Metro launched a search Monday for companies interested in building on properties the transit agency owns at five of its stations: Brookland, Navy Yard, Fort Totten, Grosvenor-Strathmore and Morgan Boulevard."
The Navy Yard-Ballpark land the transit agency is looking to develop is a bit to the north of the station's Half Street entrance, and is known as the Chiller Plant site on the southwest corner of Half and L.
While this sounds like positive progress to those who are wanting to see that corner developed, I do invite readers to come with me on a trip through the JDLand archives:
So, while it would be keen to see some movement on the 14,000-sq-ft site, it might be wise to not break out the backhoes just yet.
 

City Paper reports today what's been rumored for a for a few months now, that TaKorean will branch out from its food truck and Union Market stall to a fast-casual restaurant space in the under-construction Twelve12 apartment building
The 1,700-sq-ft restaurant will face 4th Street, SE, adjacent to the Sweetgreen at the corner of 4th and Tingey, in the building on the south end of the project that will also be home to the Vida Fitness/Penthouse Pool and Lounge/Bang Salon/Aura Spa empire. At the north end of the block will be Harris Teeter, and up above will be 220ish rental apartments.
According to City Paper, "the location will offer a few new options beyond Korean-style tacos, including rice bowls with all the same toppings. TaKorean will also continue to offer salad bowls."
Forest City, which only confirms tenant deals when leases are signed, hasn't piped up yet, but I'll update if/when they do.
UPDATE: Forest City has now made it official with their own press release, which says that the Twelve12 retail spaces are now 92 percent leased, and that residential leasing for Twelve12 will begin in the first quarter of 2014, with initial move-ins expected by June.
It also says that, at the Lumber Shed, Osteria Morini is expected to open "in mid-November" and Agua 301 in early 2014--but, well, let's give it a little cushion and just say they'll open when they open. And it gives a basic 2014 date for 100 Montaditos and Willie's Brew and 'Que at the Boilermaker Shops.
 

With Bluejacket Brewery and its Arsenal restaurant having now opened to the public (with a launch last night that would be the envy of most restaurant/bar operators), the Neighborhood Restaurant Group is now putting the finishing touches on sibling operation Buzz Bakery, next door to Bluejacket at the Boilermaker Shops at the Yards.
The original plans were to open this morning, but the bakery then tweeted that "there's still a little beautifying & final touches that need to happen," and a sign on the door now says that it will open Thursday at 7 am.
Buzz's web site doesn't yet have information on this location, {deleted}. UPDATE: Buzz Bakery has gotten in touch with me and said they don't know what their hours will be yet, but that they will be different from their other locations and so would I please remove the part of this post mentioning the publicly posted hours for their Ballston location. {shrug}
Buzz and Bluejacket are on the east end of the Boilermaker Shops, at 4th and Tingey streets, SE. They join Nando's Peri-Peri, Wells Cleaners, and GNC Nutrition in the building, with Willie's Brew and 'Que and 100 Montaditos slated to join them in the future.
 

At 1st and K SE, the neighborhood is getting a great demonstration of how quickly a just-started apartment building project can pop into view if the below-ground infrastructure is already completed.
Toll Brothers bought the site from the Cohen Companies last year, and because Cohen had originally planned a sister building to Velocity on the lot, it had gone ahead and built the garage and other underground necessities at the same time Velocity was built in 2007. But then, well, Phase 2 never actually happened, and the covered garage remained a Tetris-like landscape until Toll came along.
It was at the end of last month that nearby residents started seeing the first hints of work at the site, and now a few weeks later the ground floor of the building is already up, as you can see.
Toll is keeping details about the building pretty close to its vest--unless you're a Velocity resident. That group received a briefing in September and was told that the building will be called River Parc, will have 277 rental units, no retail, and is expected to start leasing next fall with completion in spring 2015.
And Velocity residents were even shown a rendering of the new building (thanks to Jake for grabbing a pic of the poster board, which I've straightened out a bit--UPDATE: and see below for two more).
This stretch of 1st Street between K and L used to be made up of small auto-related businesses, with the buildings facing K having a bit more tawdry offerings, such as the "In & Out Video 'and so much more'". All were demolished in Spring 2007, and now the vista looks a little different, not only on this block but elsewhere:
See my Toll Brothers page for more details and photos.
UPDATE: And now two additional renderings have fallen into my hands, showing the view that the Velocity folks will see across the courtyard (left), and the view coming up 1st Street from L (right):
 

The latest edition of the Capitol Riverfront BID's newsletter reports this evening that the Buccini/Pollin Group is planning to break ground by the end of the year on what I've referred to as the "L Hotel" on the northwest corner of 1st and N streets, just across from Nationals Park on Square 701.
It is going to be a 13-story, 168-room Hampton Inn and Suites, says the BID, and would be completed by spring 2015.
This all jibes with some guessing I did back in April when it was reported that PM Hospitality Strategies (an affiliated company to Buccini/Pollin) was close to a deal to manage a hotel "in Capitol Hill." BPG owns many properties throughout the mid-Atlantic, including the Madison Hotel.
Note that the hotel project does not include the two-story building it wraps around in the rendering above; that is anticipated to be a retail building and is part of Grosvenor's planned mixed-use project immediately to the north, which currently has no announced timetable for construction.
This would be the second hotel built in Near Southeast, along with the Courtyard by Marriott that has had the neighborhood to itself since 2006. There are plans on the boards for three other hotels, including on the same block as this Hampton Inn, in the aforementioned Grosvenor project, plus around the corner on Half Street in Monument's long-planned Half Street project, and perhaps even at 50 M Street, as was recently reported by WBJ.
As of now there is no approved building permit for this site, though there is an application currently working its way through DCRA with an address of 1299 1st Street SE, filed back in August. So, until a permit is approved, don't look for any action.
 

I was otherwise occupied on Sept. 7, the day of the big celebration on the now-completed 11th Street Local Bridge, but I finally wandered down to that neck of the woods a few days ago with my camera to capture the current state of affairs. And one might say that the landscape at 11th and O has changed a bit thanks to this project:
before
after
But there's more than just the newly wide open spaces at 11th and O. The girders for the new flyover that will carry traffic from the Southeast Freeway to the outbound I-695 bridge are all now in place; couple that with the demolition earlier this year of the old outbound flyover, and you have a very different vista at 11th and L than what's been there up to now:
before
after
(The low height of the flyovers above 11th does make that little stretch a bit claustrophobic, though, especially on foot.)
You also now have two-way traffic on 11th between O and M, so that vehicles coming across the local bridge from Anacostia can drive straight north on 11th.
And the dirt-fill-in work for Southeast Blvd. has progressed enough that the west side of 11th at the freeway no longer feels like an overpass, just the regular road.
Plus there's also work at 8th Street and Virginia Avenue to create a new on-ramp and also fashion the new exit to Southeast Blvd./11th Street.
If you don't feel like clicking on each of these photos, just head to my 11th Street Bridges and Southeast Blvd. pages to see them alongside a few other new shots. You may also want to dig into my photo archive to check out the before-and-afters at 11th and the freeway, 11th and L, 11th and M, 11th and N, and 11th and O. Though the photos don't quite seem to do the changes justice, especially if you're someone who has walked those blocks of 11th many times over the past few years.
 

For the two or three people who use it, I've done some cleaning up of the five million lines of code on my Near Southeast Transit Options page, and it should now be more or less functional again.
If you haven't seen it, this page gives you a quick look at the status of the neighborhood's five Bikeshare stations, including the two new ones at 3rd and Tingey & 8th and Potomac, along with other nearby stations of interest. It also shows upcoming arrival times for the Green line at Navy Yard-Ballpark, the Union Station-Navy Yard Circulator bus at New Jersey and M, and Metrobus lines at New Jersey and M.
You can access this page from the "Live Transit Info" link on the JDLand home page menu bar, or by clicking the little Metro icons on the home page map. It's also available via a link from the JDLand mobile home page at m.jdland.com.
 

According to an article just put up at washingtonpost.com, the long-awaited Bluejacket Brewery will officially open for business at 4 pm on Tuesday, Oct. 29, with dinner service beginning at 5:30 pm.
And there's this, which is interesting: "The restaurant and bar inside Bluejacket will go by another name, the Arsenal, a moniker that draws on the building's history. [...] Chef de cuisine Dan Hahndorf, formerly of Vermilion, will be running the kitchen. Bailey told me his menu will put a modern spin on beer-hall food, with an emphasis on Mid-Atlantic ingredients. He'll also be using the spent grains from the beer production to make pastas."
It means that Bluejacket is the brewery itself, "which has the capacity to produce 5,000 barrels a year, or roughly 10,000 kegs. Engert expects to sell about 60 percent of Bluejacket's production via retail, but as of now, the brewery does not have a distribution deal. Large-format bottles of Bluejacket beer will be available for take-away at the Navy Yard location. Bluejacket will not sell growlers."
There's some nice interior photos in the Post spread, which may have to do if you're unable or unwilling to brave what will probably be massive crowds at first.
It was announced way back in June of 2011 that the brewery--along with Buzz Bakery--would be coming to the Boilermaker Shops.
UPDATE: And here's another piece on the opening, from City Paper's Jessica Sidman.
UPDATE II: Here's the menu, via City Paper.
 

I guess Whole Foods figured that waiting another month for an official announcement after yesterday's flurry of news was a little unnecessary, because this morning there is an official release--and a new rendering, with all the appropriate signage (click to embiggen). The under-construction Park Chelsea is visible to the right, so this view is of the corner of New Jersey and H.
The William C. Smith release:
"Washington, DC - Developer WC Smith has signed Whole Foods Market to anchor the retail portion of its $443 million development in the District’s Capitol Riverfront neighborhood. The 36,000 square foot store will be located on the first floor of the second of three residential buildings the company has in development on New Jersey Avenue SE, two blocks from the Navy Yard Metro station.
"'We are delighted to welcome Whole Foods to the Capitol Riverfront neighborhood,' said Chris Smith, chairman and CEO of WC Smith. 'Their dedication to healthy living and commitment to community dovetails with our mission of creating green, sustainable communities for residents of the District of Columbia.'
"The first component of the new development, a 432-unit luxury apartment building known as Park Chelsea, is currently under construction with a projected fall 2014 delivery date. Construction on the second building is scheduled to begin early in 2014, with a 2017 opening of the Whole Foods Market and delivery of 336 residential units. The residential units will offer 10 foot ceilings and a commanding view of the Capitol and the monumental skyline. Completion of the third Class A residential building will bring the unit total to over 1,100 for the development.
"All of the buildings will provide on-site parking and will be highly amenitized with club rooms, rooftop pools, and exercise facilities. Additionally, each site will offer a unique amenity space for use by residents of all three buildings. Those amenities include an indoor lap pool, an all-purpose gymnasium, a demonstration kitchen, and a 15,000 square foot courtyard. The development is within walking distance of both the Navy Yard and Capitol South Metro stations and adjacent to newly created Canal Park with water features, ice skating rink, public art, programmed activities, and Park Tavern restaurant."
UPDATE: The separate joint release with Whole Foods is a little long to cut-and-paste, but there's this quote:
"'Washingtonians asked and we listened,” said Scott Allshouse, Whole Foods Market Mid-Atlantic regional president. “People who live and work in Southeast have been requesting a Whole Foods Market for some time. We are thrilled about finding the right fit given the combination of factors that go into deciding on a new location.'"
 

A mere 11 years after the notion was first floated, there is apparently finally a signed contract to bring a Whole Foods grocery store to 800 New Jersey Avenue SE. Though the chain isn't expected to make an official announcement until next month, a representative of WC Smith told Monday night's ANC 6D meeting of the news.
Note that the store won't be at the Park Chelsea, WC Smith's apartment building currently under construction at 880 New Jersey. This will be a new apartment building just to the north, running along the to-be-rebuilt H Street between New Jersey and 2nd, immediately south of the freeway. It's expected to have 330ish units and all the usual amenities. But with construction not currently expected to start until spring 2014, and the timeline of the buildouts of both the building and the interior work for the store, you probably won't be buying your quinoa there before 2017.
This is a deal that has started and stopped more than once, the last time around in 2011 when Smith looked for an $8 million tax break for the project, an idea which died a few months later.
The neighborhood's other grocery store, Harris Teeter, is currently under construction at the Twelve12 apartment project in the Yards, and is now expected to open in the fall of 2014.
 

In early 2011, the two-story multi-unit apartment building at 1010 3rd Street, SE (a little south of Cornercopia) was hit by an early-morning fire. Subsequently, a building permit was issued to add another floor, and after close to 18 months of work, the project is now mostly finished. What do you think of the change? (click the photos to enlarge)
Comments (1)
More posts: photos
 

Construction at the 430ish-unit Park Chelsea apartment building at New Jersey and I is now poking out of the ground:
The skyline in this location will be changing quite dramatically over the next few months, but the ground-level view already has evolved a whole lot in eight-plus years, as evidenced when looking westward along the footprint of the can't-open-soon-enough new stretch of I Street between 2nd and New Jersey:
Or, you can look at the change at 2nd and I this way:
before
after
(Told you I was working on something new. More to come.)
See before-and-after photos and information about the project here.
 

Work is speeding along at Twelve12, the apartment-Harris Teeter-Vida Fitness project at 4th and M at the Yards:
The Teeter portion of the building is even getting some windows:
See before-and-after photos and information about the project here.
 

A sunny Sunday peek at new tenants GNC and Nando's Peri-Peri, which both opened in August in the Boilermaker Shops at the Yards:
Or, if you want to see them all in one long-lens shot:
Also in August, it was announced that fast-casual Spanish-small-sandwiches outlet 100 Montaditos will be coming to the Boilermaker Shops as well. And, who knows, maybe someday Bluejacket, Buzz Bakery, and Willie's Brew and 'Que may actually open.
See more new photos, as well as before-and-after photos and information about the project here.
 

Some work appears to be underway on the southwest corner of 1st and K, where Toll Brothers now has building permits for a 13-story, 250ish-unit apartment building. The Tetris-like boxes that have covered rebar and other infrastructure since work was completed on Velocity and the accompanying garage under what's now the Toll site are being removed:
This will allow Toll to begin work on their building more or less at ground level, rather than spending months on excavation and below-ground construction.
See more photos and information about the project here.
 

It's an intense morning in the neighborhood as a shooter has barricaded himself inside the Washington Navy Yard. There are updates being fed all over the web and Twitter for those wanting to keep up. But I did want to pop my head in to say that I am still on hiatus, so I won't be returning to the Near Southeast news feed as of now. (I may have some other content coming in the coming weeks, though, so don't desert me completely.) And thank you to everyone for all the kind thoughts over the past weeks.
Comments (1)
More posts: JDLand stuff
 

Since I talked about this a few months ago when I went on hiatus, I'd like to bring it full circle by posting here that my amazing, force-of-nature, full-of-life mother Shirley Rae Dupree died on Aug. 22, her body finally giving out after a valiant two-year fight against both frontotemporal dementia and ALS.
Here's the pseudo-official obituary, in its original form, before it gets mangled in various publications across the United States.
I'm not anywhere close to a point where I can wax poetic about any of this, except to say that it was a most cruel twist of fate to deprive my mother of the abilities to speak and eat, when there was never a person she didn't want to either talk to or feed (or both). Even in the very late stages of her illness, her smile and excitement when anyone arrived to see her lit up the room, in the same way she had lit up innumerable rooms over the years with her energy and enthusiasm.
Unfortunately, as her brain degenerated it lost any ability to send any signals other than GO-GO-GO, and her body finally gave out, like an engine that had run for way too long with no oil.
There is relief that she is now released from what these diseases did to her, but it is staggering to all of us who knew her that we are going to have to figure out a way to come to terms with the tremendous void she has left behind.
As for JDLand, I'm going to take some time to recover from these past months. I'll send up a flare when I decide what the next chapter will be.
Comments (12)
More posts: JDLand stuff
 

When I put out word of my "semi-retirement" since last August, I listed a lot of reasons for my wanting/needing to pull back from the blogging grind, but I only cryptically referred to what was the biggest driver of my decision: my mother's illness.
In early 2012, after a few months of noticing her having problems remembering words, she was diagnosed with a form of dementia (FTD) that has left her memory intact but very quickly stole her speech completely and caused other cognitive issues. This was devastating enough, but within a few months we also found her to be suffering from a form of ALS (Lou Gehrig's Disease) that targeted her throat and mouth muscles, swiftly affecting her ability to chew and swallow food.
This has been such a body blow, not only to see this woman so full of life and energy be stolen away from us week by week, but to have known from the moment of diagnosis that there was absolutely not a thing we could do about it. It's like the entire family has been riding in a car with no hands on the steering wheel.
Because it's a rare combination, and because every patient with these diseases progresses differently, we've been very much on our own in terms of trying to care for her, with my father bearing the brunt of the exhausting day-to-day work while I turned my laser-like research abilities away from hyperlocal real estate and toward trying to come up with the best strategies for keeping Mom comfortable. All while nursing a desperately broken heart, alongside the shock that everyone who knows her has felt--this was not the anticipated ending of the story of this cowgirl from Wyoming who came to the big city at age 19 in 1959. (She was supposed to drop dead on a golf course at age 95, probably after a hole-in-one. And she was certainly supposed to outlive her cranky and lazy daughter.)
We are now seeing a crossroads ahead of us, as they say. So it's time for me to make sure that my focus is where it needs to be, and that I give myself permission to stop trying to keep up with other parts of my life that I just don't have the strength or interest to deal with right now. There's too much going on in the neighborhood now for me to just keep going with a hit-or-miss approach that only serves to make me feel like I'm doing less than my best.
I'll still be around on Twitter at my @jacdupree account, because I will always need an outlet for generalized snark and carping. But I really am ending the Near Southeast news service until the storm clouds clear, whenever that may be.
I'm not 100 percent sure that I'll come back to the same approach of JDLand's past 10 years, but I'll always have my camera in hand.
Thanks to all for your patience over the past few months, and for your readership for all these years. See you around....!
Comments (30)
More posts: JDLand stuff
 

There's a bit of news on one of my favorite buildings to rag on over the years, the all-but-windowless formerly armed encampment at 1st and M that housed the National Geospatial Intelligence Agency and other spook-ish groups over the years before it was vacated in 2011.
You may have seen the holes punched into the side of the building recently, but if you're fearing that any work is a precursor to the brown-and-white structure being salvaged and redeveloped, don't worry your pretty little heads.
Yards developer Forest City has passed along word that after the current environmental remediation is finished late this summer, the former Building 213 will then be going off to meet its maker. It will cease to be. Bereft of life, it will rest in peace. (Sorry, I'm a bit punchy tonight.)
Demolition, once started, is expected to take about six months.
As the northwestern edge of the Yards, this prime corner spot just northeast of Nats Park will eventually see new construction, most likely an office building.
But that's a good ways off--in the meantime there will continue to be parking on the site, and Forest City is also looking at maybe putting in some grassy areas both as open space and possible special events uses, though their plans aren't firm as yet.
And it also will be a bit different to be able to see well into the Yards when standing at 1st and M instead of looking at the remnants of a cloak and dagger operation.
(And, for the record, I'm allowed to be snarky about this place. Back in 2005 the guards there called DC cops to chase me down on 1st Street when I was taking photos in the opposite direction of the building, never having once taken any shots of 213 itself. And I did get tired over the years of seeing them reach for their guns as I walked by their fence with camera in hand.)
 
2981 Posts:
Go to Page: 1 | ... 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 ... 299
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.