Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


3164 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 317
Search JDLand Blog Posts by Date or Category

The final installment of this week's Fence Peeking is a bit more haphazard. Let's start with looking on fences:
(Left) The new Parc Riverside signage has been hung along 1st Street by the sales trailer, though at least I have the River Parc signs recorded for posterity.
(Right) There's a bunch of new signage on the black fences along Half and N, presumably to at least in part draw attention away from the big hole in the ground behind them. One portion of the sign is a map of places to see things, eat food, drink beverages, and spend money, placed by the Capitol Riverfront BID. And it helpfully provides confirmation of the Unleashed by Petco coming to the Boilermaker Shops, and lets the cat out of the bag (ahem) that the pet hospital at Twelve12 will be a Banfield.
(Left) While we wait to see when Willie's is going to open, I did at least finally get a photo of the ready-to-go interior. (Yeah, yeah, the glass isn't technically a fence, but work with me here.)
(Right) Speaking of the spiffy new signage on the black fences across from the ballpark, I finally got an updated photo from on high of exactly what those fences are hiding. Let's imagine the potential interim uses while Jair Lynch and MacFarlane Partners decide what to build -- Urban campground? ATV track? Wildlife sanctuary?
 

Having gotten out of the way the vertical construction going on behind neighborhood fences, we can now move on to the "clearing" portion of this fence survey.
The roof of Nats Parking Garage C gives a great view of Yards Parcel A, and how far the site clearing has come along since the final days of Spooky Building 213.
Next up will be the creation of a park on the far end of the site, a parking lot in the corner closest to this intersection, and the new home for Trapeze School New York at far right. (Here's a map if that's too many words.)

Meanwhile, along New Jersey Avenue....
(Left) This isn't my best work, but you can compare the rubble in this photo to the lush grass-covered hill that used to run along New Jersey Avenue between L and M. All this dirt is being moved to build the 324-unit Gallery at Capitol Riverfront residential building, aka 1111 New Jersey Avenue.
(Right) Up in Whole Foods land at 800 New Jersey Avenue, the hole is still being dug. But the new block of H Street between New Jersey and 2nd is looking like a real street, though no doubt it will continue to taunt us by remaining closed throughout the construction of 800 NJ, like its sibling I Street a block to the south has sat unopened, waiting for the Park Chelsea construction to finish.

Next, do you like construction trailers? How about construction trailers on sites where work isn't yet underway?
(Left) Here's the Capper Community Center site at 5th and K, where a ceremonial groundbreaking a few weeks back was not quite enough to jolt the project into action.
(Right) Looking down upon the vast Florida Rock footprint from the ballpark, and noting the new construction trailer visible at the far end. As I mentioned a few days ago, there's not as yet been an announcement of construction financing for the planned first-phase 350-unit apartment building, nor are the initial necessary building permits approved.
 

As a public service, I bring you the latest views behind some neighborhood fences. And on some neighborhood fences. And even behind some glass.
In fact, there's so many fence-related photos of note that I've broken up all this fence news into multiple posts, so that you don't miss a single fence-related factoid.
(All photos can be enlarged by clicking on them)
Let's begin along L Street west of 7th, where concrete is sprouting for the Lofts at Capitol Quarter, the 195-unit mixed-income building being built by the DC Housing Authority on the older Capper Seniors site.
The footprint is on a decent-sized hill, so what's two levels underground on the project's east end is more or less ground-level at the west end.

Over at Arris, the 325-unit residential building along 4th Street south of Tingey in the Yards, there's an awful lot of square footage to build up, but progress toward ground level is being made.

And the showiest construction these days is the Hampton Inn on the northwest corner of 1st and N. It's even visible now from certain spots inside the ballpark, and here takes up a good chunk of the view northward from Nats Parking Garage C.
(The "Go Nat's" signage has brought much mocking on Twitter from the Apostrophe Police, and hopefully that will be rectified before long.)
Next up: Site work that is (and isn't) happening behind neighborhood fences.
 

* VET HOSPITAL PERMITTED: An approved building permit made it through the pipeline on Thursday for the "construction of a new pet veterinary boarding hospital and vet uses" at Twelve12 in the Yards. There has as yet been no official announcement from Forest City as to the name of the operator, but this new retail offering was telegraphed thanks to some necessary zoning reworkings earlier this year. Look for a lot of pet traffic along Tingey Street between this store and the still-as-yet-not-officially-announced Unleashed by Petco that got its building permit for a space in the Boilermaker Shops earlier this month.
UPDATE: A reader reports that promotional signage on Half Street by Nats Park showing the neighborhood's offerings does let the cat out of the bag, that it's going to be a Banfield Pet Hospital.
* CLASSIC UNVEILED: The publicity machine for the NHL Winter Classic at Nats Park on Jan. 1 is beginning to ramp up, with the official announcement (finally) of the game, alongside the unveiling of the Capitals' throwback jerseys, which begat lots of photos of somewhat uncomfortable looking hockey players at the ballpark. There was also the cool outline of where the rink will be set up.
* RAMP REOPENED: This week saw the reopening of the new-ish ramp from 11th Street SE to the westbound SE Freeway/I-695. It had been closed down in June to allow for demolition of the old flyover exit ramp from the inbound freeway to I Street SE. And some day I will actually get over there again to check it all out.
* TRAILER PARKED: A few readers have passed along the news that a construction trailer has appeared within the past week or so on the Florida Rock site along the Anacostia River just south of the ballpark. While plans are to get underway Any Minute Now on the first-phase 350-unit apartment building at the site's eastern end, next to Diamond Teague Park and Piers, there's not yet been any news that the construction financing has been finalized, nor is there as yet an approved shoring/sheeting/excavation permit. But the time does appear to be drawing nigh that development of this 5.8-acre parcel will finally get underway, at which point people will shift from complaining about the empty lot right across from the ballpark to complaining about a tall building ruining the views of the river.
 

I dropped the ball and missed by a few days marking a very important 10-year anniversary for this neighborhood: on Sept. 22, 2004, the Washington Post reported that "District officials disclosed plans yesterday to build a publicly financed stadium costing more than $400 million on the Anacostia waterfront near South Capitol Street, amid growing signs that Major League Baseball will attempt to move the Montreal Expos to Washington."
After my jaw came up off the floor, I raced down to get this batch of "before" photos of the ballpark's footprint and immediate surroundings. A lot of my all-time favorite shots are in this lineup, including the one at left, of Half and M.
While there were plenty of plans for the neighborhood already in the pipeline, the jolt that this provided changed the trajectory of the area's redevelopment from a somewhat leisurely pace to a rocket blasting off. And it certainly changed my life.
Comments (1)
More posts: Nationals Park
 

While Bang Salon in the VIDA Fitness spread at the Yards is still a few days away from its slated opening date of Sept. 30 (fingers crossed), the operators already have in the works a "Cut-a-Thon" on Sunday, Oct. 5, from 9 am to 9 pm in support of ovarian cancer education and awareness.
For 12 hours, 100 percent of the proceeds from every haircut will be donated to the National Ovarian Cancer Coalition. If going to a salon is stressful, the complimentary champagne and small appetizers may serve to soothe you.
More than 20,000 women in the United States are diagnosed with ovarian cancer each year, but because of the disease's somewhat vague symptoms and a lack of reliable detection tests, most cases do not get diagnosed until the cancer has reached later stages--approximately 15,000 women die annually from the disease.
So if you're getting a little shaggy, see if you can hang on for an extra week or so and contribute to the cause. It's easier than pouring an ice bucket over your head.
(Note that this is only for getting your hairs cut [as Mom used to say], not coloring or other chemical services.)
UPDATE: Following up on reader JES's question in the comments, Bang is taking taking walk-ins for this event on Oct. 5 but appointments are suggested--appointments can be made online at bangsalon.com or (202) 628-3222.
 

It's still a few weeks from opening, but today my camera was taken on a tour of the mammoth VIDA Fitness space on the northeast corner of 4th and Tingey, including the Bang Salon, Aura Spa, and Penthouse Pool Club offerings. (Does walking through four floors and 30,000 square feet of a fitness center count as a workout?)
I've put a pile of photos in this gallery as a narrated walking tour, so that you can see spots like the "experiential cycling studio" with a virtual reality wall, the "inner fitness" room (with its own HVAC system to allow for hot yoga and rapid cooling afterward), the locker rooms, the pool deck, and much more--you'll just need to pardon their dust as they race toward an opening probably in the first week in October.
The VIDA web site has much more information on all the offerings, which also will include a Kids Zone for babysitting while Mom and Dad sweat. I was told that VIDA expects to have about 900 memberships within the next few weeks--and pre-opening membership rates are still available. (There's also 50 on-site parking spaces, though be sure to appreciate the irony of driving to the gym.)
Here's a couple of shots, but check out the full gallery.
Meanwhile, just up the street, in the same Twelve12 complex, the Harris Teeter is looking very spiffy with its signage--but alas is seeing its own opening date slip, probably to early November.
 

A few tidbits to throw your way, but first let's start off with one of my favorite photos, taken eight years ago yesterday while standing at 1st and M. You can see more shots from Sept. 17, 2006 in the archive.
* UNLEASHED BY PETCO: It was rumored back in May, and there's still been no official announcement from Forest City, but a building permit issued last week seems to be the final confirmation that Unleashed by Petco is coming to the Boilermaker Shops.
* CSX: The Post reports that "It could be a few weeks before the Federal Highway Administration releases a decision on the proposed expansion of the Virginia Avenue Tunnel in Southeast Washington." The "Record of Decision" hasn't yet been finalized. In the meantime, the Committee of 100 has let it be known that any decision short of an indefinite delay will result in a lawsuit. (Shocker!)
* HALF STREET: WBJ talks to new Half Street poobah Jair Lynch about his group's plans for the Half Street hole, now that they've bought it from Monument Realty. "While the project is expected to remain a mix of residential, retail and hotel, Lynch said he is now considering condos in addition to apartments, tweaking unit sizes, adding green features and amenities and bringing in a 'completely different retail mix.'" (Longtime area observers note that in Monument's original plans, the two residential buildings at the south end of the block were planned to be condos and apartments. And of course it's easy to "change" the retail mix when there isn't any to begin with.) They hope to get underway by 2016, WBJ says.
* MLB LATE NIGHT WITH METRO: WTOP: "Although the Washington Nationals have clinched the NL East, the team has not reached a deal with Metro to keep trains running past midnight during home playoff games." The Metro policy is that the Nationals would have to pay at $29,500 deposit to stay open an extra hour during the week; some of you may remember that back in 2012, the Nats did not step forward to pay, so Livingsocial offered to foot the bill.
 

It always seemd a little odd that Toll Brothers chose "River Parc" as the name for the new apartment building now in its final stages on the southwest corner of 1st and K--after all, there's been the mid-century goodness of the River Park townhouses and apartments over in Southwest since, well, the middle of the 20th century.
A few weeks ago, promotional signage went up across street from the new building, trumpeting RiverParc.com, and all systems seemed go. However, a reader passed along the news today of an e-mail from Toll Brothers announcing that River Parc is now the Parc Riverside.
River Parc/Parc Riverside, which according to the e-mail is now expected to deliver in November, does now have a functioning web site, with floorplans, lists of amenities (hey, everyone gets a garbage disposal!), and a few new renderings, but not the rental prices that I'm sure people would like to see at this point.
And now I shall go do a River Parc/Parc Riverside search-and-replace all across my site.
UPDATE: And, oops, I guess I should have included that the leasing office will open this coming Monday, Sept. 22.
 

A reader pointed me today to a new Facebook page for Willie's Brew and Que, the long-delayed sports bar that was first announced as coming to the Boilermaker Shops back in 2011.
It's been a busy day on the page, with a new logo posted ("Willie's, Est. 2014") as well as photos of the interior, including shots of the point of sale kiosks with the caption "Computers almost up and running!" There's no news there of an opening date, but the About page is well filled out with details. (The WilliesBBQ Twitter feed is silent so far, however.)
Certainly with October baseball looking staggeringly likely, it would behoove any restaurant or bar in the neighborhood to rush preparations to completion in order to capitalize on hordes of wild-eyed Nats fans converging on the area. However, the long delay in building out the space, followed by the bankruptcy and associated falderal surrounding owner Barracks Row Entertainment earlier this year, have made it easy to be skeptical that the restaurant would actually ever open.
So, keep an eye on the western end of the Boilermaker Shops (at the corner of 3rd and Tingey) to see if white smoke from barbeque equipment signals the arrival of a new restaurant.
 

Does everyone want some more Half Street news? Last night's Monument Realty news about the east side of the street isn't enough for you? Are you tapping your toes, wanting to know when the shipping containers are going to disappear from the other side of the street?
The Washington Business Journal, having now heard the same rumors I heard a few weeks ago (hence my sneaky comment in my Monument post about "whether Akridge is currently making any moves"), is reporting that Akridge is working to market its Half Street project to potential investors, with the company needing to replace a capital partner "that desires to leave the project." WBJ says that Akridge "expects to have some closure on a new partner by the fourth quarter," and that "All forms of transaction are on the table."
Akridge has been planning since 2008 to build two office buildings, a residential building, and 55,000 square feet of retail on the west side of the street. Whether those plans will stay the same once capital is found, well, We Shall See.
 

Documents filed today show that Monument Realty, which sunk its teeth whole-heartedly into the Nationals Park-fueled land rush of 2004 and 2005, is exiting Half Street, with the sale of the company's two remaining parcels, best known to baseball fans and residents as the location since 2009 of the big hole in the ground on the east side of the street.
The buyer of the properties is officially Half Street Residential PJV, LLC, which the Washington Business Journal is reporting is a new partnership of MacFarlane Partners and Jair Lynch Development Partners.
WBJ: "MacFarlane already owned a 50 percent stake in the residential portion of Half Street. With local partner Jair Lynch, MacFarlane essentially bought out Monument and Lehman," with an expectation that the "new team will bring this languishing project to life."
The price of the sale is roughly $12.5 million. (UPDATE, 9/17): A follow-up WBJ story on the new owners' plans for the site says that a check was cut for $34 million.
Monument had planned a hotel and 320 units of residential on this site, and went ahead and dug the hole back in 2007 and 2008 as it built the 55 M Street office building at the north end of the block. But the economy tanked, and the "Monument Valley" hole languished (and became quite the urban forest).
This move isn't exactly a surprise: it had looked a few months ago like something was coming, as Lehman had taken back a portion of this stretch of Half Street just as it had with two other Monument properties that quickly ended up being sold: the 50 M site that is soon to be a Homewood Suites, and the lot on the northeast corner of South Capitol and N that JBG is now planning to develop as a residential building.
Monument now is involved in only one property in the neighborhood, the old Domino's site at South Capitol and M that they made initial moves to develop as an office building a few years ago. (But, in what may or may not mean anything, there have been permits issued in recent days for soil borings on that site, which is often a precursor to a sale. I'm not saying--I'm just saying.)
This is the end of quite a chapter in the neighborhood's rise--and the beginning of a new round of toe-tapping about progress on what was once envisioned to be one of the liveliest stretches of street in town. It will be interesting to see how quickly MacFarlane/Lynch move, and what their new plans may be, (And, for that matter, whether Akridge is currently making any moves on its side of Half Street.)
 

It seems hard to believe that Tuesday, Sept. 16 will be the one-year anniversary of the terrible shooting rampage at the Washington Navy Yard that left 12 people dead.
The Navy will be holding its official remembrance ceremony within the walls of the WNY at 8 a.m., lead by Secretary of the Navy Ray Mabus. Vice Adm. William Hilarides, commander of the Naval Sea Systems Command, will read the names of the victims, and a bell will toll for each of them.
Later that same day, there will be a community remembrance of the event, starting at 6 pm at Canal Park. Mayor Vince Gray, Councilmember Tommy Wells, Vice Adm. Hibarides, Rep. Steny Hoyer (D-Md.), and other officials will be in attendance, as will the US Navy Ceremonial Guard. The memorial is described as including "prayers, readings, meditation, and music to honor the Navy Yard victims, survivors and heroic civilian and military first responders who acted to save lives."
This public ceremony is being organized by the Near Southeast Community Partners group, to honor not only the importance of the Washington Navy Yard to the neighborhood's past and future but also the many residents of Near Southeast who are connected to the military.
The remembrance at Canal Park is free and open to the public.
UPDATE: There is another remembrance scheduled on the 16th: the St. Vincent de Paul Catholic church at South Capitol and M will be holding a memorial mass at 12:10 pm for those killed in the shooting.
Comments (2)
More posts: Events, Navy Yard
 

Just out from City Paper's Young and Hungry, the news that has been rattling around as rumor for weeks: "The official tree of the District of Columbia--Scarlet Oak--will be the name of an American restaurant coming to 909 New Jersey Ave. SE from the owners of Adams Morgan's Southern Hospitality."
City Paper says "the menu will have some carryover from Southern Hospitality, including the fried chicken and chicken and waffles. But there will also be new stuff like pizzas and flatbreads. Drinks will include specialty cocktails and a large wine by the glass and beer selection." There will be about 100 seats, plus another 75 on the huge patio outside the space on the northwest corner of New Jersey and K.
(By the way, CP, it's not actually directly across from the Whole Foods site. Basically two blocks away.)
This will be the second tenant at the 909 apartment building, which was completed in 2009. Harry's Reserve Wine and Spirits opened there in 2011.
A December or January opening date is cited, but We Shall See.
 

The next step in the process to redevelop the Metro "chiller site" on the southwest corner of Half and L streets, SE, is expected later this week, with the WMATA board set to vote on the term sheet for the sale of the site to MRP Realty and CAS Riegler.
It was announced back in June that WMATA had chosen MRP/CAS's plan to redevelop the site with a 126-unit condo building with 6,000 square feet of retail.
The term sheet lays out the requirements of the sale, which include the preservation of the existing chiller plant operations at or below grade level, chiller plant cooling towers on the building roof, and 500 square feet of office space for ten years for Metro staff. In addition, Metro will have five parking spaces at the building, which is currently designed to have 55 parking spaces for the 126 units.
The documents prepared for Thursday's vote include the above drawing, showing the new building as seen from the northeast corner of Half and L. (That's 20 M at left and 1015 Half at far right.)
However, because nothing ever moves swiftly with this site, this vote just means that WMATA and MRP/CAS can then negotiate the full Joint Development Agreement, setting the terms for the purchase of the site, construction of the project, and continued WMATA operations on the site. It's not expected that agreement will come back to the WMATA board until spring--and then the closing of the sale of the site would be 24 months after that approval, which pushes the timeline into 2017.
 

Some additional progress updates, in convenient illustrated form. (click to enlarge)
First, a before and after of St. Matthew's, may it rest in peace. (More before-and-after photos here.)
Next, the progress on the Whole Foods at 800 New Jersey. At this point, it's just progress on the big hole in the ground, but still worth seeing. Note that the near part of this hole is actually not part of the 800 NJ footprint, but WC Smith is digging the garage that will be beneath the as-yet-not-unveiled third building on the block. (Whole Foods visitors will park in a two-story garage above the store, not in the basement with residents.)
And then I'll give you a peek inside the red brick Building 170 behind USDOT (left), where the 5x5 art project has one of its installations. And at right is the not-yet-open expansion of the parking lot at Half and I on Square 696. Good timing for the playoffs!
 

I admit, it's been a while since I've done any wandering south of the freeway (newcomers to JDLand may not be aware that I don't actually live in the neighborhood I've been photographing for the past 11 1/2 years). So on Saturday morning I went out to check on the progress in various locations.
Thanks to the demolition of Spooky Building 213 (STILL not done!), it was at New Jersey and M where I was able to catch my first glimpse of exactly how behind I've gotten. My exact words can't be printed on a family blog, but I quickly hustled down to 1st and N to document the vertical construction of the Hampton Inn, now five floors above ground.
The developers are looking to have the 168-room hotel open by mid-2015, and clearly they aren't dilly-dallying.
And if you're wondering about the space in between the wings of the hotel, where the white fence is, that's not part of the Hampton project--it's an annex of the big Ballpark Square residential/hotel/office/retail project that will be filling up the rest of 1st Street between M and N. As you can see on the project page, a two-story retail building is planned for that site.
As for a before-and-after of the Hampton Inn site, let's go to the north side of N Street, just across from the stadium's Parking Garage C, and see the difference:
A bit of a change from the Quality Carryout.
And when I say that the Spooky Building 213 demolition isn't done, here's all that's left, other than rubble. So close. So very close.
 

The Washington Post is reporting this afternoon that hockey is coming to Nationals Park in a few months: "The NHL and the Washington Nationals have reached terms allowing the 2015 Winter Classic game, set for Jan. 1 between the Capitals and Chicago Blackhawks, to be played in the D.C. ballpark, according to three people familiar with the negotiations."
It was announced almost a year ago that the game would be coming to DC, and there were "reports" in December of 2013 that the ballpark had been chosen as the location, but apparently there were "several issues" needing to be resolved. An official announcement is expected "very soon," says the Post.
It's been a long road to this, with rumors first flying back in 2010 that the Winter Classic would come to Nats Park in 2011.
Now let's hope it's not 70 and sunny on Jan. 1.
Comments (0)
More posts: winterclassic
 

Washingtonian is reporting that Korean fried-chicken chain Bonchon is coming to the neighborhood next year, in a 200-seat space that ANC Commissioner David Garber says is going to be in the 1015 Half Street building two blocks north of Nationals Park.
Quoting: "The menu will mostly mirror Arlington’s (here’s a sample), with a focus on spicy and soy-garlic fried chicken, plus Korean specialties like pork buns and bulgogi. ... [Y]ou'll find a spacious bar for pre-and-post game gatherings. A list of 16 craft beers, both domestic and Asian, are in the works, plus a specialty cocktail menu. Takeout, delivery, and catering services are also planned, as well as reservations for large parties."
Washingtonian says that the space is being designed by GrizForm, which also worked on Bluejacket and Agua301. There are also plans are an outdoor patio. (UPDATE: The restaurant will apparently occupy ground-floor space on the L Street side of the building.)
The building housing the new venture is the one that stood empty for many moons before the announcements earlier this year that the National Labor Relations Board will be moving there, as will CBS Radio. That a restaurant is going into the building at all is a bit of a surprise, since the retail spaces were always a somewhat wishy-washy subject.
 

ANC 6B commissioners Brian Flahaven and Kirsten Oldenburg have both written about a new batch of design concepts for Southeast Blvd., the planned stretch of road between 11th Street SE and Barney Circle where the sunken far eastern portion of the Southeast Freeway used to run.
Almost a year ago, DDOT presented five designs for the new road that basically, as Flahaven puts it, "replaced the freeway with ... a freeway completely separated from the neighborhood grid." The designs were not well received, and with a push from councilmember Tommy Wells, the Office of Planning stepped in to conduct a "rapid response" study of the neighborhood and the project. And on Aug. 4, these new designs were unveiled at a public meeting.
The boards show both two-lane and four-lane designs for the road, some with direct access to the Anacostia Waterfront and extension of the street grid to the boulevard, some without. The Office of Planning now plans to take community feedback--which apparently was considerably more positive this time around--and move forward with three final concepts that can be presented to the community and to DDOT this fall.
However, it also turns out that DDOT is planning to go ahead and reopen this stretch of road by the end of the year, with the traffic flowing through the new signalized intersection on 11th Street SE where the exit ramp from the Southeast Freeway recently opened. Oldenburg describes what she see as the "major implications" of this move: "First, this freeway segment becomes the No Build option in the study. Second, in my view, it will take the pressure off city officials to get the NEPA study completed in a timely manner, hopefully, incorporating some of the fresh ideas generated by the OP study."
Flahaven is urging residents to contact Mayor Gray and council members with their thoughts on this.
 
3164 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 317
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.