Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Boilermaker Shops/Yards
See JDLand's Boilermaker Shops/Yards Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


74 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8

While nowhere near as flashy as the Half Street/Fairgrounds news, it should be noted that ANC 6D on Monday voted to support the liquor license applications for Xavier Cervera's two upcoming restaurants, the Park Tavern at Canal Park and Willie's Brew & Que at the Boilermaker Shops in the Yards. The support is conditional on having voluntary agreements signed for both applications within the next two weeks.
There was a bit of drama with this, with the commission's ABC subcommittee chair Coralee Farlee refusing to recommend this support because of what she considered a lack of communication from Cervera over the wording of the voluntary agreement; Cervera's lawyer had apparently replied with a few comments, but Farlee had not heard from Cervera himself (who seemed a bit bewildered by it all). David Garber stepped in to say that he had been working the voluntary agreement issue as well, which clearly Farlee wasn't especially happy about either.
Garber noted Cervera's desire to not have the process delayed, given Park Tavern's planned June 15 opening date and the need for Cervera to have a license in place in order to move forward with Forest City and the Boilermaker Shops. Commissioner Cara Shockley expressed some concern about moving so quickly, and there was also discussion about how a vote to support without a signed VA is not 6D's standard operating procedure. (Audience member and former 6D secretary Roberta Weiner mentioned how at other ANCs the vote would be to protest the license until a VA is signed by all parties.)
But in the end, four commissioners voted to support the licenses, Shockley voted against, and Ron McBee voted to abstain. (Commission chair Andy Litsky was not in attendance.)
My post from last week gives a whole pile of details on both restaurants, which I'll not bother to rehash here. (That post is much more fun to read, anyway.)
 

At a meeting of ANC 6D's ABC committee on Tuesday night, we got some new details on two restaurants coming to Near Southeast in 2012, the Park Tavern at Canal Park and Willie's Brew and Que in the Boilermaker Shops at the Yards. Both are from Xavier Cervera of Lola's/Molly Malone's/Boxcar/Hawk n Dove/etc. fame, and Cervera was in attendance to answer questions from the committee. Let's go to the bullet points, shall we?
Park Tavern - This casual restaurant in the pavilion on the south block of Canal Park near M Street is aiming to be the city's first LEED Gold restaurant, thanks to a green roof, solar panels, and the various stormwater management aspects built into the park itself. And:
* There will be fewer than 100 seats inside the glass-and-steel structure, but outside Cervera expects another 75-125 seats, both in a private "summer garden" area by the park's skating rink/water feature and in a sidewalk cafe on the eastern side, along 2nd Place. Because the building is long and narrow, Cervera said that all of the inside tables will be along the windows. There will be additional space on the roof, where visitors can go to look out over the park or walk through the big light cube, but Cervera isn't planning service up there except for private functions.
* The menu will include Neopolitan pizzas and flatbread offerings along with seafood, steaks, and more, along with full liquor service; Cervera is asking for a CR license, with hours until 2 am Sunday through Thursday and 3 am Friday-Saturday.
* The restaurant is planning to offer breakfast service beginning at 8 am, though Cervera sounded a little skeptical of whether there will be enough business to support it. (Maybe via Congressional-type breakfast business meetings?)
* June 15 is the target opening date for both the park and the Tavern.
Willie's Brew and Que - A few blocks to the south, Cervera is waiting for Forest City to finish construction on the Boilermaker Shops renovation so that he (and other tenants) can then begin their build-outs. It will occupy the western end of the building, at 3rd Street (seen at right), where the full two-story space to the roof will be open. Details:
* There will be 230 seats inside the restaurant, with another 125 or so at outdoor tables in front of the building at 3rd Street.
* It will have "live" barbeque: Cervera said that he has put a lot of money into the kitchen, with charbroilers and custom-made smokers to churn out authentic North Carolina barbeque.
* And there will be plenty of booze to go with the food, as Cervera will be requesting a CT ("tavern") liquor license, mainly, he says, because with 81 home Nats games a year two blocks away at the ballpark, he can't envision being able to meet the requirements of a CR license where 47 percent of sales must be food. (Tavern licenses don't usually go over very well with ANCs, so this will be interesting to watch.) Full operating hours until 2 am Sunday-Thursday and 3 am Friday-Saturday will be requested on the license, along with an "entertainment endorsement" to allow live music inside until 11 pm Sunday-Thursday and 1 am Friday-Saturday and recorded music on the patio. (The entertainment endorsement discussion for both locations sidetracked into whether dancing will be part of the endorsement, with Cervera bemused at the notion of having to make people stop dancing if the music has moved them: "This isn't 'Footloose.' ")
* Cervera has no opening date for Willie's, but he says he expects Forest City to release the space to him for build-out within 2-3 months.
The discussion surrounding Willie's showed the committee members being a bit hesitant to make decisions for this restaurant that then will set the standard for the other Boilermaker Shops tenants who aren't yet applying for their liquor licenses, such the brewery from the Churchkey team. The issue of noise, especially from the outdoor seating space, and how it will effect residents of the Foundry Lofts across the street was brought up, though 6D commissioner David Garber said that no one is moving into this area without knowing that it's going to be an entertainment destination of sorts. Cervera, in arguing his cause, said that he fully expects himself and the Churchkey operation to be "good stewards" of the new nightlife in the neighborhood. The first three years of operations will be "painful fiscally," he said, but they want to be here first and be good tenants.
In the end, for both operations, the committee voted to recommend approval of the license applications to the full ANC, subject to the successful negotiation of a voluntary agreement between the commission and Cervera. (Note that neither liquor license application has actually been filed yet, but Cervera says he expects all paperwork to be completed by early next week.) The full ANC could take these applications up at its Feb. 13 business meeting, if papers have been appropriately shuffled by then.
Comments (8)
More posts: Boilermaker Shops/Yards, Canal Park, Restaurants/Nightlife, parktavern, Retail, willies, The Yards
 

When last I visited the Foundry Lofts, it was about a month before the first residents moved in. I took a pile of photos, but while model units were furnished, a lot of the shared spaces were still being worked on. So I finally made a return visit this week to see all the finishing touches on the interior courtyard, lobby, community room, etc. And I took one or two photographs, of course.
The leasing office tells me that the 170-unit building is now about 65 percent leased and 40 percent occupied, and construction on the non-retail spaces is not far from 100 percent completion. The four priciest units--the corner penthouses, which were announced with rents in the $4,500 range--are all taken. And the two eateries in the ground floor--Potbelly and Kruba Thai and Sushi--have their building permits and are working toward opening within 90 days.
Also, because I can't walk past the Boilermaker Shops without taking pictures, I added a few new shots to that page, including the panorama at right that I got from one of the Foundry Loft patios.
As if this all isn't exciting enough, here's a first terribly not exciting photo of the excavation underway at the 1212 4th/Teeter site a block east of the Foundry Lofts and across the street from Boilermaker.
Plus, since I had to walk down 4th Street to get to all of this, I snapped some shots of the continuing Capitol Quarter progress at K and L.
Comments (1)
More posts: Boilermaker Shops/Yards, Foundry Lofts/Yards, photos, The Yards, Twelve12/Teeter/Yards
 

If yesterday's news about the brewery coming to the Boilermaker Shops in the Yards wasn't enough, today I can pass along that the liquor licensing process looks to be getting started for Xavier Cervera's two upcoming locations in Near Southeast, the Canal Park Tavern planned for the pavilion at Canal Park and the Willie's Brew and Que sports bar also at the Boilermaker Shops.
Both have been added to the agenda for ANC 6D's ABC Committee next meeting, on Jan. 31 at 7 pm at King Greenleaf Rec Center. Hopefully at this meeting there will be some details on both places (seating capacity, hours, when they expect to open, general menu concepts, etc.).
With the Tavern expected to open along with Canal Park sometime this summer and WBQ probably not until late fall or beyond, this is a pretty early start to the ABC process, so don't get your taste buds primed just yet. But all evidence of forward progress is worth noting.
 

There hasn't been much said so far about the restaurant planned for the Boilermaker Shops at the Yards by the Birch and Barley/Churchkey team, but the Post's All We Can Eat blog posted some morsels today:
* The still unnamed venture will "contain a full-scale production brewery, a brewpub-like tasting room [...] and a 200-plus-seat restaurant."
* A head brewer has been hired: Megan Parisi, former lead brewer at the Cambridge Brewing Company in Massachusetts. And, as a fun side fact, Parisi used to play clarinet for the US Navy Band, right next door at the Navy Yard.
* "Barrel-aged sour beers" will be a major focus. A comparison is made to Belgium's lambic beers, which means I'll be camping on the doorstep (Lindeman's Peche is a personal favorite). Owner Greg Engert called it all "a giant experiment."
* The operation will "open in about a year."
The brewery's neighbors in the building at 4th and Tingey SE, as announced so far, will be an Austin Grill Express, brb ("Be Right Burger"), Buzz Bakery, Huey's 24-7 Diner, and Willie's Brue and 'Que sportsbar, which will be another option for drowning any Prince Fielder-related sorrows, though by the time these places open the Nats will have had a fabulous 2012 season and no one will remember any of the recent drama. Right? Right?
Comments (3)
More posts: Boilermaker Shops/Yards, Restaurants/Nightlife, Retail, The Yards
 

Do you get excited about new windows? Then this latest batch of photos of the Boilermaker Shops rehab is for you!
But, in addition to all the new glass, you can also see that the construction of the mezzanine level has begun as well. (There's a rendering midway down the page of how the mezzanine level will look, if you're having a hard time envisioning it.)
If you're just joining us, this is the project at the Yards that will bring six restaurants to this historic building by the end of 2012: a brewery by the Birch and Barley/Churchkey Folks, Austin Grill Express, BRB burger joint, Huey's 24/7 Diner, Buzz Bakery, and Willie's Brew and 'Que.
And, speaking of restaurants at the Yards, interested parties will like to hear that construction has begun on the Potbelly Sandwich Works shop in the ground floor of the Foundry Lofts building, just south of Boilermaker on the southeast corner of 3rd and Tingey. It is expected to open this spring, as is Kruba Thai and Sushi, which just received its building permit last week for its space in Foundry's southwest corner, just north of the Yards Park.
Comments (0)
More posts: Boilermaker Shops/Yards, Restaurants/Nightlife, Foundry Lofts/Yards, photos, Retail, The Yards
 

Hope everyone has had a good holiday season, and made it into the New Year relatively unscathed. I took some blog vacation time myself, but while it's looked like pure slacking, I've actually been hard at work on my 2012 State of the Hood roundup, which will be coming tomorrow.
Until then, here's a few very short tidbits to catch up on, some of which were already tweeted (so blog-only folks might have missed them) and others of which were just little things that have piled up on my To-Do list.
* In the days before Christmas, the final demolitions were finished up at Florida Rock, making the concrete tower #166 in my Demolished Buildings gallery. I didn't get down there for mid-demo photos, but DCMud has a few stylized shots.
* The Capitol Riverfront BID said last week on Facebook that construction will begin in April on turning the Lumber Shed at Yards Park into a combination retail pavilion and office space for developer Forest City. No such announcement from Forest City yet, and no details on who any of the retail tenants may be.
* Suspect fleeing from police jumps the fence into Nationals Park on Dec. 28, finally found hiding in a public restroom.
* The Examiner surveys what's coming for DC's various waterfronts in 2012.
* The Post's annual list includes "Renting in Navy Yard" as one of the "In"s. (To which the smart-ass in me replies, "Oh, you mean actually in the Washington Navy Yard, the Navy's oldest shore establishment, now 202 years old?")
Comments (0)
More posts: Boilermaker Shops/Yards, Florida Rock, Lumber Shed/Yards, Nationals Park, The Yards
 

Yes, it's time for another batch of updated construction photos. This is a tough stretch of year to take these--the sun never gets very high in the sky, so anything facing due south is about impossible to get without glare. And, for places like Canal Park, it's hard to even get some locations out of the shadows long enough to get a photo that you can decipher. But you can see (below left, and on the project page) a couple of shots of the progress on the park's pavilion where the Park Tavern restaurant will be housed, along with plenty of shots vaguely showing the other ongoing ground-level work. Meanwhile, at Capitol Quarter (below right), they continue to just zip right along, with framing now well underway on the north side of L and around up 4th, and prep work for foundations continuing in the project's final block, on the south side of L.
In the Renovation/Rehabilitation portion of the tour, we have a few updated images of the Boilermaker Shops (above left), another building that's tough to shoot in winter, even more so when there's not much of it other than steel beams at the moment (though they have recently been painted white). Meanwhile, 225 Virginia/200 I is coming pretty close to the end of its exterior renovations, though work inside will continue in preparation for the arrival of three DC agencies later this year.
There isn't much new to see of Lot 38 Espresso (aka the Little Red Building 2.0, above left), which the grapevine says is now shooting for a mid-December opening. (But, really, at this point, it opens when it opens--the last batch of permits and approvals is always slow going, and I bet the owner wants it open even more than you do.) I also took a bunch of shots of the former National Geospatial Intelligence Agency building at 1st and M (above right), not because there's been any changes to it, but because I really enjoyed finally being able to aim a camera at it without having guards reaching for their guns. (Nyaah! Nyaah! Click! Click! Click!)
I came home with 438 new photos (yikes), and you can browse the 180-plus I decided to upload to the online archive here. (Yes, it's true, you don't actually get to see every photo I've ever taken. Which is probably for the best.)
Remember to click the icon to see the entire range of photos for any location, while the project pages linked to above are your best bet if you're looking for paired before-and-afters and/or narrated tours.
And, in case you didn't see my tweet or my late-night update, the residential/Teeter project at 4th and M got all the dotted i's and crossed t's I mentioned in my initial post, and is officially now considered by Forest Ctiy as "commenced." (I just can't call it 1212 4th Street yet. Doesn't really make the location pop as well as "4th and M.")
 

The fine folks at the Foundry Lofts leasing office were kind enough to give me a hard-hat tour of the still-under construction building today, and of course I went with camera in hand. It was hard to pare down my photos to a manageable amount, but I think this Foundry Lofts Construction Progress Gallery does a good job of showing the general aura of the building's units and public spaces. (I even got to visit a few of the penthouse units, although there's still much work to be done on them.)
The 170-unit building is now about 43 percent leased, and the first residents are expected to move in at the end of this month. And within the next month or so, Potbelly Sandwich Works and Kruba Thai and Sushi will start work on their ground-floor spaces, with both looking to open during the first quarter of 2012.
One aspect of the building's design that many people may not be aware of--since it isn't visible from the outside--is the large interior open-air courtyard, which even includes a yoga platform complete with bamboo. (I did confirm, though, that attendance at the daily yoga sessions will not be mandatory for residents.)
And, because I can never resist, I also got a couple photos of the so-close-to-being-finished bridge between the Yards Park and Diamond Teague Park (which should be opening Any Minute Now), as well as the increasingly naked Boilermaker Shops building. Those photos are at the bottom of the gallery.
For more about the project, see my Foundry Lofts project page, which includes many "before" photos that are worth looking at to be reminded at just what an amazing job has been done in transforming this 1918 building. And for much more detail about floor plans, available units, and other information, visit the official leasing office web site. Rents, according to the web site, start at about $2,000 a month for the one-bedroom units, $2.900-ish for two-bedroom units, and $3,200 and up for the two-story penthouses. (The corner ones with the great views run at about $4,500 a month.)
Comments (5)
More posts: Boilermaker Shops/Yards, Development News, Foundry Lofts/Yards, Retail, Teague Park, The Yards, Yards Park
 

I took a lot of photos on Sunday, so many that I'm not going to waste time trying to come up with some pithy introduction. What you see below are just a taste of all the new images I posted, so be sure to follow the links for more.
At the Yards, the Foundry Lofts (left) are looking close to done, and it's striking to compare it to its Before shots to see just how well the exterior of the building has been cleaned up. Meanwhile, the Boilermaker Shops (right) is now defrocked, with work underway to transform it into the 46,000-square-foot retail space that will open about a year from now.
In the Yards Park, work will start this fall to make the Lumber Shed into another retail space, and earlier this summer test panels were hung on one corner of the building (left) to show how currently bare structure will look when it is completely enclosed in glass. And, over on the western edge of the park, the new bridge that will connect Yards Park to Diamond Teague Park (and Nationals Park) is coming along (right), with a number of the signature curved "fence posts" already installed. The bridge is scheduled to open in a few months.
I finally got some not-very-exciting shots of the under-construction pavilion on the south end of Canal Park (left), along with updating what photos I could of the perimeter (the fencing around 2nd Place in particular puts a cramp in my methodology). This pavilion is where a restaurant is planned, which could be home to the latest Xavier Cervera offering if a deal is finally reached. The park is expected to open next year. Plus, I captured the temporary home of the Capitol Hill Day School (right), so that some day many years from now there will be a record of the modular classrooms that stood for nine months or so on the site of the eventual Capper Community Center at 5th and K.
And change is happening at a ridiculously rapid pace at Capitol Quarter, so much so that a trip through the Phase 2 Extended Photo Archive is definitely recommended to see all of the new vistas in comparison to the old Capper footprint. Less showy but still moving forward is the transformation of 225 Virginia/200 I, including the beginnings of the work on the parking deck at 3rd and I.
Want to plow through all 213 new images? Have at it.
Comments (1)
More posts: Boilermaker Shops/Yards, Foundry Lofts/Yards, photos, The Yards, Yards Park
 
74 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8