Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Capper Senior Apt Bldgs
See JDLand's Capper Senior Apt Bldgs Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


78 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8

I'm not sure many readers have ever had the strength to scroll all the way to the bottom of my Near Southeast home page, so many of you might have missed the goofy little "slide shows" I had there showing the construction progress at Capitol Hill Tower and DOT HQ. But since the home page has gotten unbearably huge, I decided to now just show a random one each time you load the home page, but I've also created a  Construction Slide Shows page to give them their own space. A random one comes up each time you load the page, then you can click on the links to choose another. And I've also added a new one, for Capper Seniors #1. Meanwhile, in other site news, if you've visited in the past week or so you've probably noticed the slight design change, with navigation links and ads now running down the right-hand side of the page, instead of taking up precious real estate in the main portion of the pages. And perhaps now having the list of Near Southeast pages visible (instead of in dropdown boxes) will make roaming the site easier. Or scarier, if you're alarmed by exactly how much is here. UPDATE: And I added a Blog Archive list of links, allowing you to go back through my posts month-by-month, if you are ever so inclined.

 

It's a beautiful sunny day, so I went on a photo expedition. (Except that trying to take pictures toward the south at this time of year is almost impossible, no matter what time of day.) Check for new photos on my DOT HQ, Capitol Hill Tower, Capper Seniors, Florida Rock, M Street, and 20 M pages. As always, the  icon is your guide.
 

Stop the presses! I have NON-STADIUM news! Hallelujah! Construction has begun on Capper Seniors #2, the wraparound addition to the Carroll Apartments for low-income seniors at 4th and M. This new construction will add four stories and 130+ units to the 64 units in the Carroll building. Scroll to the middle of my Capper Seniors page for a rendering of the new construction, and photos of the current site. As for Capper Seniors #1 at 5th and Virginia, construction is speeding along, and I promise once the Christmas rush is over to post new photos. For more detail than one would ever want on the entire Capper/Carrollsburg project (and Canal Park, too), read the Feb. 2004 Zoning Approval for the Capper PUD.
More posts: 400m, Capper, Capper Senior Apt Bldgs, Capper Seniors/900 5th St.
 

Blech, after all this stadium stuff recently, I feel the need to clense my digital palate, so I've returned to my original Near Southeast mission for a moment and have posted some new photos. My latest Capper Seniors #1 photos show that construction is moving along, and I've added a cool comparison to my New Jersey Avenue page from the SE Freeway (don't ask how I took them) showing the impact of Capitol Hill Tower and the DOT HQ on the Near SE skyline in the past 11 months. And I've documented some minor changes in the landscape of the Ballpark District (with the demolition of a few small buildings along Half Street) and the 8th Street Historic District. I also tossed in a few updated shots on my M Street, Capitol Hill Tower, and DOT HQ pages, too. (As always, scroll the pages and look for the  icon.) Speaking of the Ballpark District, Stephen Green of the Office of the Deputy Mayor for Planning and Economic Development said today at the stadium hearing that the four finalists for the "master developer" gig were interviewed by the Anacostia Waterfront Corporation today, and that a team should be named by the first or second week in December.
 

ANC 6D has posted the agenda for its November meeting, at 7 pm on Monday Nov. 14., at 65 I Street SW. Agenda items include votes on Capper/Carrollsburg and Florida Rock PUDs, plus an update by the DC Sports and Entertainment Commission on baseball stadium zoning and construction issues.
More posts: ANC News, Capper, Capper Senior Apt Bldgs, Florida Rock, staddis, Nationals Park, zoning
 

It's Photo Updates day, and I've added a pile of them--look for the   icon to see my latest photos on these pages: DOT HQ, Capper Seniors, Capitol Hill Tower, Canal Park, 20 M Street, East End, M Street, Marine B.E.Q., and New Jersey Avenue, and even one if you dig enough on South Capitol Street. Whew!
 

I've added a graphic to my Capper/Carrollsburg page that shows the general outline of the plans for the area. (I realized that while I know what's going where, and have mentioned it from time to time on my site, perhaps not everyone can read my mind and so might prefer an easy-to-read image that lays out the concepts of this 33-acre revitalization, rather than having to sift through piles of zoning documents or waiting for EYA to add a real "Site Plan" link to their Capitol Quarter page.) I also added a similar graphic and some detail to the Ballpark District page, while we wait to find out what the AWC has up its sleeve.
More posts: Capper, Capper Senior Apt Bldgs, Capitol Quarter, staddis
 

Today's DC Register has published an ever-so-slightly corrected version of the Capper/Carrollsburg first-stage PUD approval from 2004. Since the second-stage PUD should be coming before the zoning board in the near future (and is being discussed at the ANC 6D meeting on Monday 10/17), perhaps printing this is one of those arcane zoning rules I'm unaware of. Anyway, anyone interested in the plans for the Capper/Carrollsburg site should take the time to plow through these 40 pages.
More posts: ANC News, Capper, Capper Senior Apt Bldgs, zoning
 

It's been a busy busy weekend here at the Near Southeast page. To reflect the true boundaries of the area I'm tracking, the map at right has been expanded, to 11th Street to the east and to South Capitol and S Streets in the south. I've also added two new pages to the site: the New South Capitol Street Bridge page, and the Near Southeast East End page, both of which have lots and lots of photos, and links to information about what's happening in those spots. I've also finally made my Navy Yard page more than an afterthought, adding many more pictures (although not so many from inside the Navy Yard walls, I don't want a visit from the Homeland Security folks). I know this makes the map smaller and a bit harder to read, but I also needed to leave some space for when more projects get underway. And, in the midst of all that, I added new photos to many of the existing pages: check out the DOT HQ, Washington Canal Park, Capitol Hill TowerFlorida Rock, and WASA pages to see them. (You'll also find a few new pictures on some other pages, but it'd be embarassing to mention them here when there's only one new photo on a page.)

 

Some Capper/Carrollsburg items: I hear tell that the construction contract for Capper Seniors #2 will be awarded soon (once the money aspect of the project gets settled, also "soon"). Also, word is that the Capper Community Center is to be demolished, Any Minute Now (we have a lot of those type of items, don't we?). In zoning news, the October Voice of the Hill gives details on the Sept. 15 zoning commission Capper / Carrollsburg agenda items--in addition to a second-stage approval being sought for a three-acre section of the project (presumably the "ribbon" between 5th, 4th, I, and M, which was demolished nearly a year ago), the developers are submitting a new application with modifications to several aspects of the original plans: they are seeking to increase the residential density to 2.34 from 2.21, and at the same time are proposing to reduce the parking spaces per unit to 1.38 from 2.1--these changes are the result of efforts to preserve some of the existing private houses that had been slated for redevelopment, according to a DC Office of Planning staffer. No date is yet announced for the public hearing on this.
More posts: 400m, Capper, Capper Senior Apt Bldgs, zoning
 
78 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8