Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Capitol Quarter
See JDLand's Capitol Quarter Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


150 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 15
Search JDLand Blog Posts by Date or Category

Between it being Friday and the sun finally being out, I bet everyone's feeling a bit better today. Maybe even Biking to Work! So, a few tidbits:
* The latest Capitol Riverfront BID newsletter is out, with a few items of note. First off, there's a new "branding" campaign going on--"Be Out Front." Look for signs promoting "Front Yard," "Front Office," "Front Door," "Store Front," etc. And they'll soon be launching an equally rebranded web site.
Also, the current estimated population within the BID is 1,584 residents; the newsletter says that there are now more than 2,000 residential units, more than half of which are leased/sold and occupied.
The newsletter also gives the Bullpen's official opening date as May 15, and also mentions that the weekly Tuesday farmer's market at USDOT is now underway, and that the weekly Wednesday lunchtime concerts start on May 20.
* The agenda for Monday's ANC 6D meeting is out (hopefully it'll show up online before the meeting itself), and the only Near Southeast item is a presentation by Michael Stevens of the BID--kind of a BID 101 tutorial for the ANC commissioners. Otherwise, it's voting on marathons, bus stops, after-school programs, and also an announcement of a "Southwest Night" at Ft. McNair on July 1. The meeting is at 6th and M streets, SW, at 7 pm. (Maybe next month it'll finally move to the new digs at the new 1D police station at the former Bowen Elementary.)
* The Examiner reports that the 2010 federal budget includes $15 million for "Southeast Federal Center remediation." There's certainly been piles of environmental cleanup there over the years (not surprising when it used to be blocks and blocks of munitions factories).
* EYA has spiffed up its web site a bit--their Capitol Quarter page is worth a visit if you haven't checked it out before.
 

I took advantage of this sunny July day (what? April?) to refresh my Capitol Quarter photos, showing the now-partially-occupied first row of townhouses (on L between Fourth and Fifth) as well as the progress in the block to their north. I can also report that foundation digging has now begun on the third CQ block, on the north side of K between Fourth and Fifth.
If you want to see more photos than just the ones on my main CQ page (and given all the change, it's worth it), here's my Capitol Quarter Expanded Archive; and don't forget to click the Click to see all available photos of this location. icon if you want to see the photos between the Befores and the Afters, like the progression above, showing the southern side of L Street at Fifth, from 2004 to today.
Comments (0)
More posts: Capper, Capitol Quarter
 

The latest Capitol Riverfront Connections newsletter from the BID was sent out late last week, with updates on the LEED for Homes plaque presentation last week at Capitol Quarter, an interview with BID executive director Michael Stevens on Newschannel8, and news of a ceremony coming tomorrow (Monday) at 2 pm on the Tingey Plaza at USDOT, where Mayor Fenty will kick off the launch of 28 new artistic bike racks around the city.
Also on Monday, at 6:30 pm, is a Zoning Commission hearing where a first vote could possibly come on the batch of zoning changes being requested for Capper/Carrollsburg to which I've dedicated so many bytes lately.
And, on Tuesday morning at 8:30 am is a dedication ceremony and breakfast fundraiser (also with the mayor) for Diamond Teague Park, being held across the street at the foot of the stadium's grand staircase. Tickets are $50 per person.
Comments (0)
More posts: Capitol Riverfront BID, Capper, Capitol Quarter, meetings, Teague Park, zoning
 

I am briefly surfacing from the whirlwind that is my "real" life these days to pass along an update from Saturday's workforce housing lottery at Capitol Quarter: the folks at EYA tell me that 58 prospective buyers entered the lottery for the 15 houses that were for sale. (Three additional houses that were being released for sale under the workforce program were snapped up by former Capper/Carrollsburg residents, who had first option prior to the public release).
Also, it can now be said that Capitol Quarter is an actual residential community: the first purchase settlements took place last week, and homeowners have moved in, six years after the old public housing units in that section of the Cappers first began being closed. Settlements are expected to continue on a regular (even weekly) basis until CQ's first phase is completed, in the middle of next year.
If you're looking for an excuse to go see the considerable construction progress (especially since a certain blogger has completely failed lately at providing updated photos), a reminder that on Wednesday at 11 am EYA will be celebrating Earth Day with a ceremony marking the first CQ house to achieve LEED for Homes certification, with a plaque presentation by the US Green Building Council. The proceedings start at 11 am, with a "light luncheon" at 11:30, at the sales office at Fourth and L, SE.
(And, along those Earth Day lines, a last-minute reminder about Tuesday's Anacostia Waterfront Forum, focusing on "Green Waterfront, Green Jobs, Green Living in a Green DC." It's at the MLK Library at Ninth and G, NW, with an open house beginning at 6:30 pm and the forum running from 7 to 8:30 pm. The April "Waterfront Watch" newsletter has more information on the forum, as part of its focus on "Green DC.")
Finally, as a heads up, unless there's big news (or incredibly quick and easy items to post), I'm probably going to be a bit scarce for the next couple of weeks. (Though every time I say that, I seem to end up posting just as much if not more than usual.) I will probably Twitter some, though, since even from within the maelstrom I can probably manage to string 140 characters together every so often--and, if you're on Facebook but not Twitter, you can now see my Tweets directly in your Facebook news feed by becoming a fan of JDLand.com. Who knows--maybe that Profile Page could even become a "social network" of sorts!
Comments (0)
More posts: Capper, Capitol Quarter
 

[Note: I'm back in town after almost a week away (reminder to self: next year don't skip town the week before the home opener), so apologies if my coverage of the various events and media pieces has seemed even less scintillating than usual. And now I'm going to end the week with one more less-than-perfect entry, which I should have written before I left but didn't do it until now....]
If you haven't been back to Nationals Park or the surrounding Near Capitol Ballpark River Yards neighborhood since last year's Opening Day, here's what you'll see that wasn't completed on your last visit:
* 55 M Street - Right on top of the west entrance of the Navy Yard Metro station, at the head of Half Street, is Monument Realty's 275,000-sq-ft office building, which has been finished in the last few months and which will be home to Artomatic this summer. No office or retail tenants have been announced, although WBJ reported a few weeks back that Gordon Biersch may be eyeing some of 55 M's ground-floor space. The rest of Monument's Half Street site remains a large hole in the ground, with financing for the planned 350 residential units and adjoining hotel directly across from the ballpark nowhere to be found.
* 70 and 100 I Street - Sibling apartment buildings officially known as the Axiom and Jefferson at Capitol Yards first began move-ins in late summer 2008, and their combined 700 units are reported to be about 50 percent leased. (They're the big brick buildings sitting just south of the Freeway.)

* Onyx on First - Another apartment building (though it had been originally planned as condos), Onyx opened at the corner of First and L streets in late fall of 2008. It has approximately 266 units.

* 100 M Street - On the site of the old On Luck cafeteria at First and M, this 240,000-sq-ft office building opened right at the tail end of 2008, and is close to 40 percent leased, with Parsons occupying about one-third of the space. A SunTrust Bank branch is under construction on the ground floor--there's additional retail space where a restaurant could be a possibility, though no deals have been announced.

* 909 New Jersey - Finished mere moments ago (it opened last week), this 237-unit apartment building at New Jersey and I by JPI (developers of 70 and 100 I) is catching eyes with its blue-edged nighttime profile, and is generating piles of "have they signed anyone for their retail space?" messages in my inbox (answer: not that I've heard so far). Baseball fans walking down from Capitol South will also appreciate the wide new sidewalk now just one block south of the freeway.

As for what's currently underway, there's the first phase of townhouses at Capitol Quarter (where the first residents will move in this month and where work will continue into next year), the 200-unit Velocity condo building at First and L, and the 440,000-sq-ft office building at 1015 Half Street (which will be completed in 2010 but will already be cursed for obscuring the view of the Capitol dome from some seats in the ballpark that had it last year). There's also construction continuing at Diamond Teague Park, right across from the ballpark's grand staircase, but the somewhat optimistic timeline of having the water taxi piers completed by Opening Day has now been revised to "midseason."
Work had begun on rehabbing the brown-and-white Pattern/Joiner Shop at the Yards last year (which folks walking to the ballpark from the Nats Express drop-off will see), but financing problems brought the work to a halt early in 2009, and Forest City continues to look for money to restart the project.
The most prominent structure that's disappeared in the past 12 months is the former WMATA bus garage on Half Street just across from the subway entrance, demolished two weeks ago to make way for Akridge's planned 700,000-sq-ft mixed-use development, though that project won't get underway before 2010. (The south end of Akridge's Half Street land is where the [not-a-]beer garden may appear later this summer.)
But, as has been written about extensively elsewhere, as of now there's no new places to eat since last year (though a deli is coming to Third and K in May), and most likely no additional projects will get underway before next year.
So, study this little guide and amaze your friends with your knowledge of what's what as you look at the ballpark's surroundings.
 

The Capitol Quarter folks (EYA and the DC Housing Authority) have just released information on the next offering of "workforce" houses for sale, the program where buyers who make between $80,000 and $115,000 annually and meet a host of other requirements and restrictions can buy a townhouse at Capitol Quarter for under $600,000. If you go to the workforce web site at EYACapitolQuarter.com, you'll find all of the information needed to register and be "certified" as eligible in advance of the April 18 lottery. There will be a maximum of 18 houses for sale in this lottery, though possibly fewer if previous Capper residents exercise their options to buy one.
The first workforce lottery was way back in November 2006, when 176 people entered the lottery for 20 houses.
Comments (0)
More posts: Capper, Capitol Quarter
 

If you haven't been by Capitol Quarter in the past few weeks, you might be a bit surprised to see how it's progressing. I've posted a bunch of new photos from Fifth and Fourth streets, where you can see the progress ranging from nearly completed exteriors along L Street (getting painted!) to framing now reaching the Fourth and K intersection.
I took a ton of new photos today (even though the bright blue skies of mid-morning got replaced by icky high clouds), but am rushed at the moment and so will go through the rest of them tomorrow. But these ought to keep folks busy until then.
Comments (0)
More posts: Capper, Capitol Quarter
 

I took advantage of this beautiful February (!) day to grab some quick photos. First up are the action shots at Capitol Quarter, showing the brickwork underway on the southeast corner of 4th and L and the framing continuing on the north side.
And, for the first time since August, I've updated my views of the neighborhood from the SE Freeway. Clearly I'm out of practice because I kind of screwed up the angles, but you can still get the idea when you compare these new images to their "before"s. This is one of my favorite galleries, since I do have one grainy photo from 2000 (when 80 M was still under construction), and some others from 2005, before the vertical rush really began. You can also see that 1015 Half Street is about to really dominate the view, probably permanently obscuring the view of 55 M from the freeway. Remember to click the See All Photos of This Angle icon if you want to see all the photos between the "before" and now.
I also updated the one shot I have from the freeway at New Jersey; watch the progression from 2005 when Capitol Hill Tower was the dominant building through the construction of Onyx and now with 909 New Jersey and Velocity on display.
You can see all photos from today paired with their "before"s on one page, if you don't feel like clicking around and if you don't mind waiting a bit for it all to load.
(Alas, despite attempts to clean my lens just before taking these shots, they all look like they're being filtered through Vaseline. I'll just pretend I was being arty.)
Comments (0)
More posts: 1015 Half, Capper, Capitol Quarter, square 697
 

Been kind of a nice few days here without much news, so now I'm having to force myself back into the routine. I'll start small:
* An update to the post about the new houses released at Capitol Quarter: EYA tells me that the houses released are spread throughout the development: 421 L Street, under construction and expected to be ready in April (listed for $720,340 on the EYA "Move In Now" list), two houses in the block just to the north (expected to be ready in the fall), and four houses in the block bounded by I/Virginia, Fifth, Fourth, and K that could be ready by the end of the year. On all of these blocks the reservations placed by homeowners over the past few years have now been converted to contracts; that is expected to happen for the final Phase 1 block (between Third and Fourth and Virginia and I) later this year.
* The agenda for Monday night's ANC 6D meeting is posted, and it includes a vote on the Phase 2 designs of the Yards Park that were discussed at last week's special meeting. I've also now added a bunch of those Phase 2 renderings to my Yards Park page. Other items on the ANC 6D agenda are about Southwest subjects, though I should note that the National Marathon on March 21 (which they'll be discussing) will be coming across the Douglass Bridge, briefly using South Capitol Street until it turns west on P Street.
There's also an agenda item about a BZA application for 1101 South Capitol St., SW, which was the old KFC. This is a good opportunity for me to mention that, with two blogs about Southwest now in full flight, I'm going back to my original boundaries, which old-timers will remember stopped in the median of South Capitol Street, which is where Southeast ends and Southwest begins. I'm lucky enough to be watching a neighborhood that has probably the firmest boundaries of any in the city, so I'm going to respect them!
* City budget season is nearly upon us. I've added to my calendar a partial list of dates for FY08-09 oversight and FY10 budget hearings, for agencies that have the most bearing on Near Southeast. Check the DC Council web site for the full list.
Comments (0)
More posts: ANC News, Capper, Capitol Quarter, meetings, Douglass Bridge, The Yards, Yards Park, zoning
 

Two small tidbits:
* EYA sent out an e-mail today announcing that they are releasing "the final townhomes in Phase 1" at Capitol Quarter, with prices starting from the $630s. I don't know how many units are in this batch, or where in the Phase I blocks they're located. I'm pretty sure that a while back Phase 1 was billed as "sold out"--if I'm correct, these would be some houses originally reserved but now back on the market. (Buyer decides not to buy, buyer's credit worthiness tanks, etc. etc.)
UPDATE, 2/7: EYA tells me that the houses released are spread throughout the development: 421 L Street, under construction and expected to be ready in April (listed for $720,340 on the EYA "Move In Now" list), two houses in the block just to the north (expected to be ready in the fall), and four houses in the block bounded by I/Virginia, Fifth, Fourth, and K that could be ready by the end of the year. On all of these blocks the reservations placed by homeowners over the past few years have now been converted to contracts; that is expected to happen for the final Phase 1 block (between Third and Fourth and Virginia and I) later this year.
* From the Post calendar listings, word of a concert on Sunday Feb. 8 at the Marine Bachelor Enlisted Quarters. (This is the first time I've ever heard of a concert there, though it's more than possible that the news of previous ones didn't make it onto my radar.) Here's the particulars: "MARINE CHAMBER ENSEMBLE, performance of works by Libby Larsen, Telemann and Stravinsky; followed by a tour of the facility; light refreshments served. 2 p.m., Marine Barracks Annex, John Philip Sousa Band Hall, Seventh Street and Virginia Avenue SE. Free. 202-433-4011." (hat tip to reader S.)
Comments (0)
More posts: Barracks, Capper, Capitol Quarter, Events
 
150 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 15
Search JDLand Blog Posts by Date or Category