Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: CSX/Virginia Ave. Tunnel
See JDLand's CSX/Virginia Ave. Tunnel Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


125 Blog Posts Since 2003
Go to Page: 1 | ... 8 | 9 | 10 | 11 | 12 | 13
Search JDLand Blog Posts by Date or Category

I was invited to a little briefing today by CSX for a few bloggers, so the company could give a bit of a status update on the expansion plans for the Virginia Avenue Tunnel. They explained the background of the project (which is already available on their National Gateway web site), and emphasized the more than two dozen community meetings they've attended; they'll be going to both ANC 6D tonight and ANC 6B on Tuesday to report on the results of a draft traffic study they commissioned to show the impacts of closing Virginia Avenue between Second and 11th streets, SE, for two to three years, and also some renderings of some improvements they are offering to undertake to the various freeway underpasses and along Virginia Avenue to help beautify the stretch once the work is completed.
I arrived armed with a lot of questions from readers (thanks everyone!), but alas most of them had to do with specifics of the construction process, which CSX says it will not be able to address until they begin the design/build phase of the project.
They did pass along a few basics--they will be building a second/parallel track, in an open trench, to allow for train movement while they work to widen and deepen the existing track to allow for two tracks and double-height rail cars. (The tunnel originally had two tracks, but as equipment grew wider the second track was taken out of commission. So they will be adding about four feet of tunnel space on each side to bring back double tracking.) The temporary parallel track trench will be filled back in once construction is finished.
They will build temporary bridges across the open Virginia Avenue trench at the cross streets, which will necessitate each street being closed for three to five days. Construction would mostly run from 7 am to 7 pm, but trains would go through the open trench at all hours, though mostly at night. They "will work to mitigate" noise issues and construction dust and debris, and used the existing houses at Garfield Park as an example of how people already live very close to open rail trenches without an undue amount of difficulty. (The Garfield Park houses are a bit farther away from the train tracks than the new EYA houses on Virginia Avenue, of course.)
They did say that it's *possible* that some of the trench in the 300 block of Virginia Avenue could be decked over in order to preserve "access" to the new EYA houses in that block, and that they are working closely with EYA to make sure those concerns are addressed.
As for traffic impacts (which weren't discussed too much in today's group), ANC 6B commissioner Norm Metzger in a blog post on Friday gave a few specifics in regards to the Sixth Street freeway exit ramp: "The 6th street exit ramp will remain open, but traffic must turn left on 6th street[.] Traffic trying to get to, say, M Street, SE, will have execute a several blocks U-turn, using 6th, I, and then 4th streets. There will be inevitably be problems, not least trying to anticipate the flow of 'local' traffic from the re-designed 11th street bridges. i.e. commuters may still be tempted to use. There is considerable skepticism by some (including me) of DDOT's estimate of how much commuter traffic that is supposed to use the SE/SW Freeway to get to downtown will actually stay off local streets."
There is still no timeline for when construction would start--they are continuing to "look at many possible sources" of funding, from a hoped-for federal transportation reauthorization bill that isn't as yet showing much movement to a new USDOT Tiger II grant program to other possibilities. They also need to go through an environmental impact study, which they didn't have a timeline for but which won't start before June and could take six months to a year. As has been said, they are very much wanting to get this tunnel done by 2015, and they consider this tunnel a supreme bottleneck in their entire east coast operations.
They also say that "the community" has told them that they want this project done sooner rather than later, preferring a lot of hassle for a shorter period of time compared to a medium amount of hassle for a longer period of time. And CSX also feels there's interest in seeing this project get finished before any additional development starts cropping up along the Virginia Avenue corridor.
Hopefully some of the renderings and other documents they showed today will be posted online somewhere soon. But CSX considers this to be a project still in its very early stages, and clearly believes that the amount of neighborhood outreach they are doing to be a strong indication of how they want to work with the community to lessen the impacts of the coming construction, much in the same way that the Marines are pointing to their Community Intregated Master Plan project for the new barracks site and its many neighborhood meetings as a "new way of doing things."
UPDATE: This post at GGW gives an overview (which I've long since stopped bothering with ;-) ) on why CSX is undertaking the project.
UPDATE II: For the point of view from a resident with a group that is definitely not in favor of CSX's plans, read these notes from the meeting.
UPDATE III: Here is the rendering they passed out showing possible improvements CSX could undertake to Virginia Avenue and underpasses after the construction is completed.
Comments (0)
More posts: CSX/Virginia Ave. Tunnel
 

The agenda for Monday's ANC 6D meeting is now available, with a few items of Near Southeast interest. There will be an update on the CSX Virginia Avenue Tunnel project, a presentation by the owner of American River Taxi (the company working toward water taxi service between Georgetown, the SW Waterfront, Diamond Teague Park, and other spots), and a liquor license application for the Patriot II, which is the boat run by the new DC Harbor Cruises outfit that just began running river tours from Teague. There's also the usual gamut of road races and other items, along with I'm sure the latest on the opening this week of the new SW Safeway.
The meeting is at 7 pm at St. Augustine's Church, Sixth and M streets, SW. (This *might* be the last time the ANC meets at this location, with its new space at the Waterfront building at Fourth and M being close to its debut.)
If you're interested in the CSX stuff and can't make the Monday meeting, remember that there's also an update being given the next night at ANC 6B's meeting.
 

I've been invited to a press/blogger briefing being held on Monday by Stephen Flippin, who handles federal affairs for CSX. It's to give an update on the Virginia Avenue Tunnel project, with a look at some renderings and other materials that CSX will have available.
What questions would you folks like to have asked? Leave your thoughts in the comments, and I'll see what I can do about getting responses. (Don't worry, I'll be sure to get the basics, like a timeline.)
Also, Flippin is scheduled to update ANC 6B at their Tuesday night meeting, if you'd prefer not to get your information through the SLANTED JDLAND MEDIA FILTER!
Comments (0)
More posts: CSX/Virginia Ave. Tunnel
 

With the opening of the 2010 season at the ballpark and lots of other interesting news of late, my blogging time and focus has been geared toward these bigger items. But there's a fair amount of little stuff that I point to every day on my Twitter feed (also available on Facebook), mainly news stories that might be of interest but that aren't really important or newsy enough to devote much more than 140 characters to. I may eventually transition to leaving those completely to Twitter, but I still feel guilty enough for now to round them up here on the blog every so often. But if you're wanting all news items at warp speed, best to start reading the Tweets.
* EYA has passed the news to me that all Capitol Quarter Phase I townhouse units are now sold. They are gearing up to begin sales of the Phase II houses, which will start "soon." (Though I wouldn't take your tent down to their sales office just yet.) I imagine they will do the releases of these next houses in groups based on location, as they did with phase I. It's still expected that the entire townhouse development will be built out by the end of 2012.
* Last weekend Bisnow took a walk around the neighborhood with a camera (a novel idea!), and gave their readers an update on some of the projects. The only section that I've not seen reported before is Akridge now saying that construction for their 700,000-sq-ft mixed-use Half Street project is now pegged at "hopefully before next baseball season," likely meaning 2011. But, "once shovels hit the dirt, the one residential and two office buildings will likely go up at once," Bisnow quotes an Akridge rep as saying. It also says that Forest City is "hoping" to get started on the Boilermaker Shops retail renovation at the Yards before the end of this year. (Lots of "hoping" going on!) There's even a picture of the Pillsbury Doughboy that gazes out over the neighborhood from Capitol Hill Tower.
* Voice of the Hill says there's a possibility of a temporary dog park being installed at the Virginia Avenue Park (Ninth and Potomac, SE), at least until CSX starts on its tunnel construction project (more on CSX coming in another post later today). This is coming to the forefront because the principal of Tyler Elementary has now banned dogs from the school's playing field.
* Some neat overhead photos from DDOT showing the progress on the 11th Street Bridges construction. I'm hoping to get some ground-level images myself before too much longer.
* CNN reports on how Nationals Park has become a very hot venue for political fundraising, actively pursued and encouraged by the team. "[F]ederal candidates, major political parties, and political action committees have spent at least $432,000 on fundraising events either at Nationals games or at their facility, according to campaign finance documents filed with the Federal Election Commission."
 

A few articles I've recently pointed to from my Twitter feed that might be of interest but aren't necessarily "news":
* The Examiner says the city spent $115,000 to house snow plow drivers at the Courtyard on New Jersey Avenue during the record February snowstorms--what we always refer to as the "trash transfer station" is also the city's snow plow yard, and so the drivers were being put up close by. (Lots of money was spent at McDonald's, too, presumably the one within walking distance on I Street.)
* The Nats' Stan Kasten speaks to the DC Sports Bog on the rumors of the NHL Winter Classic coming to town. ("I think it's a fun rumor, it's a fascinating rumor, [but] I really do think you're jumping a little bit ahead.... I think it would be great for our city, and great for our ballpark, and together we'd do a hell of a job.")
* In Senate testimony, US DOT secretary Ray LaHood used "the area around the ballpark" as an example of "livability" during a sharp exchange with Sen. Kit Bond. You can see the video here (skip to the 92-minute mark), or read the story about LaHood's testimony on Streetsblog.
* Three Nats games -- April 3, 7, and 8 -- have been deemed "official events" in the National Cherry Blossom Festival. (via the Nats)
* The ANC 6D meeting tonight is at the Courtyard in Near SE, but SWDC Blog posted photos of the commission's new digs in the about-to-open Waterfront development.
* WashCycle thinks that the 10-block temporary tunnel CSX says it will build on Virginia Avenue when reconstructing the existing tunnel ought to be kept for bike/pedestrian use ("lighting would have to be a must", they say).
 

The lineup. all front-loaded on Monday and Tuesday:
* Monday has the ANC 6D meeting (didn't we just do this?), at 7 pm at the Courtyard by Marriott at New Jersey and L, SE. The agenda is now posted, and includes updates on the Nats and the ballpark's Transportation and Parking Plan.
* Tuesday has Tommy Wells's public meeting on improvements to M Street, from 6-7:30 pm at the MPD First District station at 101 M St., SW.
* Tuesday is also ANC 6B's meeting, in its new home at 535 8th St., SE, at 7 pm. The update from CSX on the Virginia Avenue Tunnel project originally slated for this meeting has been moved to the April meeting.
Comments (0)
More posts: ANC News, CSX/Virginia Ave. Tunnel, meetings, M Street, parking, Nationals Park
 

From Tommy Wells's office (via ANC 6D):
"Please join us to discuss the possibilities for M Street.
Tuesday, March 9th, 6:00 - 7:30 pm
MPD First District Station, 101 M Street, SW
"Councilmember Wells, in conjunction with the Southwest Neighborhood Assembly and ANC 6D, is hosting a neighborhood meeting to discuss how Southwest and near Southeast neighborhoods can make safety improvements to M Street through what's known as a 'complete street.'
"'Complete street' is a term of art for planning and renovating streets to reduce the number and speed of cars on the roadways, provide better pedestrian safety and access, and support alternate means of travel that connects neighborhoods. Currently, AARP and other advocacy groups strongly support the concept for the potential it holds to build better and safer streets for seniors, families and other pedestrians. AARP will attend to share its efforts to bring complete streets to more communities like ours.'
For much more information on the "complete street" concept, here's the National Complete Streets Coalition web site. I also imagine that the M Street bike lanes concept that was presented to BID members a few months back will be discussed at this public meeting as well.
UPDATE: Just a note that, for people who are wanting to attend this but are worried about the conflict with ANC 6B's meeting that night, I'll note that the planned update from CSX about their Virginia Ave. Tunnel project has been postponed to 6B's April meeting.
Comments (0)
More posts: Pedestrian/Cycling Issues, CSX/Virginia Ave. Tunnel, M Street, Traffic Issues
 

On Wednesday the US Department of Transportation announced its TIGER grant awardees, and while the massive National Gateway rail project did receive $98 million, it was for a stretch of rail in Ohio, Pennsylvania, and Maryland, and not for the projects planned in DC, including the expansion of the Virginia Avenue Tunnel, which would result in a multiyear closure of the street in order to add a second track and lower the track bed to allow for double-height cars.
ANC 6B03 commissioner Norm Metzger received a statement from CSX that says: "The Virginia Avenue tunnel piece is a 2-3 year project that we would like to have finished in time for the expansion of the Panama Canal in 2015. Our original intent was to pursue funding through the transportation authorization bill, and this will continue as will seeking other funding opportunities." (I'm trying to find out more about this authorization bill they're talking about, using my best source for what's going on in Congress, but don't have anything just yet, other than the fact that there isn't an actual authorization bill currently written or under debate.)
In other words, as of now there's still no indication of when this project will start, which may or may not be good news for the people who have put down deposits for the row of Capitol Quarter townhomes along Virginia between Third and Fourth, since the lack of impending construction may be offset by the uncertainly of when the hammer might finally drop. For more on the project, read my various past entries, and also the documents that CSX submitted last year to the National Capital Regional Transportation Planning Board for some additional details.
Comments (0)
More posts: CSX/Virginia Ave. Tunnel
 

Some small items I've tweeted (or just forgotten to post) recently:
* Construction delays related to last week's epic snows have put the kabosh on the trapeze school's planned opening today--they may open for business on Friday, Feb. 19, but are still in need of their certificate of occupancy. Check their web site or Facebook group for updates.
* ANC 6B commissioner Norm Metzger is following CSX's plans for expanding the Virginia Avenue Tunnel pretty closely, and has recently passed along a link to a new "National Gateway Project Updates" web site, including this page on the Virginia Avenue portion. CSX still isn't really giving any details about how the construction will impact the area, but they are certainly touting all the public meetings they've been to! In a similar vein, Norm also posted a link to a new blog, "Capitol Hill Against Railroad Tunnel Expansion," by folks who are unhappy with the plans.
* Look for ANC 6D's monthly meeting to be rescheduled to some day this week--they didn't send out any announcements as their attempts to hold the meeting last week were postponed, so checking their web site for the new date will be necessary. ANC 6B has rescheduled its meeting to Feb. 23.
* WBJ reports that the city used $10 million in surplus receipts from the ballpark tax to "shore up its fiscal 2010 budget," instead of paying off the ballpark debt early, which was what businesses who pay the tax expected to happen in the event of surpluses. And they're not happy.
Comments (0)
More posts: ANC News, CSX/Virginia Ave. Tunnel, Nationals Park, Bower Condos/Guild Apts/Yards
 

* The Yards has been designated a LEED Gold Certified Neighborhood Development Plan, based on the 42-acre project's stage two design plan, which "integrates the principles of smart growth, urbanism, and green building into the first national system for neighborhood design." Read Forest City's press release, or learn more about the LEED for Neighborhood Development program.
* Southwest...The Little Quadrant With the Really Long Blog Name (hey, we kid because we love) gives a full report on the meetings last week to create a plan for Buzzard Point. The American Planning Association has posted its press release summarizing the sessions, saying that "Buzzard Point is a distinct area and should build on its strong existing residential character" and that any future plans should "[a]void using a cookie-cutter approach to redeveloping the neighborhood; the type of redevelopment taking place east of South Capitol Street is not what should occur west of South Capitol Street." (Yikes, now there's going to be a rumble in the South Capitol Street median.)
* Michael Perkins is not the person you want to be unable to find a parking space. Speaking of which, here's the second part of GGW's report on last week's Ward 6 Performance Parking public meeting.
* The US Department of Transportation HQ on M Street has been named a winner of the Phoenix Award, which "honors excellence in brownfield redevelopment" and honors companies and individuals who have worked "to solve critical environmental and community challenges when transforming formerly used real estate into productive new uses."
* Voice of the Hill reports on the latest Lower 8th Street visioning sessions: "Barracks Row Main Street executive director James Dalpee suggested that a Columbia Heights-style model, with several big anchor stores, might be what's needed to spur retail in the area," though "while they are dreaming big dreams, planners also have to contend with a number of potential obstacles. They include CSX's plans to tear up Virginia Avenue from 2nd to 11th streets for up to three years to make room for a double-stack train tunnel; the Marine Barracks master plan, which is set to be unveiled soon; and the 11th Street Bridges expansion project."
* WBJ's Breaking Ground blog points to a video by the Huffington Post's investigative unit on "Commercial Real Estate: the Next Hole in the Economy," which "stars" Jeff Neal of Monument Realty talking about the buying "binge" his company went on to snap up lots around the ballpark site in 2004 and 2005. (Though I think it's funny to see WBJ getting a bit snippy about news organizations "discovering holes in the ground" after they did, since I'd be willing to wager that they weren't the first to report on those sites, anyway.) WBJ also says that Neal is developing a reality TV show. Also be sure to check out the comments on the YouTube video for the sort of level-headed, reasoned discourse that we've all become accustomed to on the interwebs.
 
125 Posts:
Go to Page: 1 | ... 8 | 9 | 10 | 11 | 12 | 13
Search JDLand Blog Posts by Date or Category