Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Square 701
See JDLand's Square 701 Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


34 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4

With the latest news about Florida Rock's design modifications, Monument Realty's bid for the WMATA land at Half and M, the still-in-limbo Stadium Garages Wrapped With Development Goodness, and the apparent moving forward by the Cohen, Camalier/Davis, and Welch families to develop their land along First Street, it appears that the Ballpark District is moving forward, despite the AWC's still never having released it's "Development Strategy" for the area. So, fresh off my success with my North of M map, I've created a Ballpark District map to better help keep track of what's happening. Be aware that the boundaries I drew for the new public plaza at the foot of 1st Street are not really based on anything other than trying to remember how it looked in Florida Rock's exhibits to the ANC. And no final design for the traffic roundabout at South Capitol and Potomac has been released yet, either. UPDATE: And, for the heck of it, I just added a page with both maps fused together, creating a pretty nice Stadium Corridor Development Guide. But be prepared to scroll :-).
 

The agenda for the September ANC 6D meeting has been released; items of Near Southeast interest include a vote on the request for alley closings on the east side of Square 701 and also a presentation on changes in the Florida Rock PUD in advance of it's Sept. 18 zoning hearing. (Perhaps the Square 737/739 alley closing will get added to the agenda as well, it was supposed to be referred back to the full commission from the Development Committee for this meeting.) The meeting is on Sept. 11 at 7 pm at 65 I Street SW.
 

Oops, I missed this badly. The August Hill Rag's report from the July ANC 6D meeting gives us our first description of what's being planned for 1st Street between M and N (just north of the stadium and part of the Ballpark District area): "a 515,000 square foot mixed use office, residential and retail development. The office building will be 11 stories[;] the apartment building, which will contain 252 units, will be 12 stories. There will be 499 parking spaces, more than a hundred more than the number mandated by regulation." This was revealed as part of the alley closing request, which was referred to the ANC's development committee, and will be reconsidered by the full commission at it's Sept. 11 meeting.

More posts: ANC News, staddis, Square 701, zoning
 

The parade of alley closings and street closings/realignments this year in Near Southeast continues, as the National Capital Planning Commission has on its September meeting agenda the proposed closing of a public alley in Square 701 (the square bounded by 1st, M, N and Half Streets, SE--see my cruddy tax parcel map for assistance on where the squares are). I figured that this was going to be the alleys in the footprint of the Monument/WMATA properties, since Monument has made clear it's plans to move forward with developing the land along Half Street, but instead I find out that the alley closings being requested are on the east side of the Square, between Cushing Place and 1st Street, where the land is owned by the Cohen and Camalier families, who have said little about their plans for these properties. Does this mean we'll be seeing development coming to 1st Street south of M soon, too? And believe it or not, as I was writing this very entry, I received word that Monument has now filed it's application for alley closings on the west side of Square 701 as well as one small alley on Square 700 (behind the Amoco Station). Note that neither of these applications request closings of Van or Cushing. These applications follow successful alley closing requests already this year for Square 0743N as part of the 100 M and 1100 1st Street projects, the street/alley closings for the new ballpark, and the closed alleys and new streets for Capper/Carrollsburg--plus there are the still-pending requests to realign the streets in Square 737 in preparation for William C. Smith's big mixed-use project at 2nd and H and the Lerners' request to close a small portion of an alley in Square 697 as part of their 1000 South Capitol office project (no bills for these yet appearing in the DC Council legislation database).

 
34 Posts:
Go to Page: 1 | 2 | 3 | 4