The apartment projects
F1rst and the as-yet-unnamed building at
909 Half aren't even waiting to be topped out before starting to put their faces on:
There's also now plenty of windows on the
Homewood Suites at 50 M, where there is clearly No Time To Lose if they are going to make that October 2016 opening date on the signage. And I bet there will be some windows on
Insignia on M before too much longer.
I've also posted updated photos of
Agora,
ORE 82, the
Bixby, and
Dock 79, in addition to new shots at the links above.
And there's lots of
Slider updates, too, a few of which are previewed below.