Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Apr 27, 2006
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

Another long-planned development project is now moving forward--a correspondent tipped me to a newly posted sign announcing that 250 M Street will be arriving in 2008. This is a 212,500-sq-ft office building by the William C. Smith company, to be built right across the street from the DOT HQ (currently there's a parking lot on that site). It will take up all of the M Street frontage on that block, but won't cover the entire block--there will be an apartment building associated with Capper/Carrollsburg on the rear of the lot, facing L. See the Jones Lang LaSalle database for more information, and check out my tossed-together new page for the project.
 

Clark/Hunt/Smoot has posted an updated Bid/Purchasing Schedule for the ballpark--even if you're not a construction company looking to get in on the action, it's oddly fascinating to see how specific it all is, as well as seeing the timeline of what's bidded on when.
More posts: Nationals Park
 




                  © Copyright 2024 JD.