The
study area covers the stretch of M from 12th Street, SE to 14th Street, SW, along with the adjacent areas from the Southeast/Southwest Freeway south to the Anacostia River/Washington Channel. DDOT is looking at "how to integrate transit, bicycling and walking with motor vehicle traffic," while also trying to figure out how to balance residents' preferences for how M Street should be configured versus how visitors, workers, and commuters expect it to flow.
The first meeting,
back in January, included an introduction to the study before attendees broke up into small groups to give feedback about the issues they feel need addressing.
According to the
web site, a draft study report is expected this summer, with the final report and a final public meeting coming in the fall.