Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Jul 12, 2017
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

To prove (to myself) that I am not completely out of commission, I attended this morning's Bisnow event focusing on current goings-on development-wise in the Capitol Riverfront.
Here are a few bullet points of the development-type items I found of most interest:
* Dock 79 is 92 percent leased, and MRP Realty expects to begin construction on the residential building next door (71 Potomac) late this year or early next year--and that it is expected to have a lot more 2-bedroom units than Dock 79. I was also told that All-Purpose will probably open in the fall, and Dacha in the spring--and also that the planned small additional storefront for All-Purpose fronting Potomac Avenue has fallen by the wayside.
* One Hill South is 60 percent leased, and the developers have just begun design meetings for the project's second phase, another 300ish-unit building fronting South Capitol Street. That could get underway in a year or so.
* As the attendees were taking their seats at Arena Stage, a splashy video was played for the 25 M Street office building project planned by Brandywine REIT and Akridge. I can't link directly, but go to the (new to me) official web site at 25mst.com and scroll down to click on Property Video. Janet Davis of Brandywine did say that this building will not get underway until it's about 50 percent leased.
* Skanska's 99 M office building at 1st and M is expected to top out in about a month or so. Skanska's EVP Mark Carroll said that they expect to announce their first signed tenants soon, and that they are "not typical tenants." Both Carroll and Davis agreed that there has been a clear uptick in interest in Capitol Riverfront office space in the past six months or so.
* District Winery is crossing its fingers for a September opening. (Perhaps even earlier than September, but best not to get ahead of the permitting process.) Owner Brian Leventhal was on the Yards panel, and told the story of branching out from the original operations in Brooklyn without having any specific location in mind, and how once they narrowed to DC, everything about the lot at the Yards "was perfect, [so] we didn't consider any other space." (He also has moved to DC from Brooklyn, and said that living at the Yards is "like living in a resort.")
* 1221 Van is expected to begin move-ins later this year, and leasing should start in the relative near future.
* Forest City's Debbie Ratner Salzberg talked about how the Yards came to be, and said that "the minute Bluejacket opened [in 2013], we were on the map."
* And we definitely appear to be referring to the blocks immediately north of Nats Park as the "Ballpark District" once again.
* It was only mentioned in passing, but I should still officially note here that Cosmopolitan Nail Salon is now open in Arris at the Yards.
 




                  © Copyright 2024 JD.