Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Oct 21, 2005
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


5 Blog Posts

I've made some major changes to my Florida Rock page, with much more detailed information about this planned 5.8-acre mixed-use project along the Anacostia River. Also included are some fabulous renderings of what the development will look like. Many thanks go to Davis Buckley Architects for providing me with the information and images. ANC 6D will be voting on the project at its November 14 meeting, and the second-stage PUD will be before the DC Zoning Commission on Dec. 8.
 

As part of the Great Streets Initiatve, the District Department of Transportation will be holding public workshops to help plan and design over $100 million in transportation for seven corridors, including South Capitol Street. The workshop that will include South Capitol Street (along with MLK Jr. Avenue and Minnesota Avenue) will be held Wednesday, October 26 at 6 pm at Thurgood Marshall Academy.
More posts: South Capitol St.
 

This is not the sort of thing I normally would post about here, but I've been giggling about it all morning, so.... I dreamt last night that I was driving around Near Southeast, and suddenly at N Street I saw a big brick building that I knew hadn't been there just a few days earlier. I went to investigate, and it was a "model" of the new baseball stadium, about three stories high and two blocks long, that the city had built so that residents could get a feel for what the new stadium was going to look like. It was a Camden Yards-looking design (so of course I told everyone in earshot "no, the architects have said they'd be using glass and stone as their major materials!"), and there were tons of people milling around looking at it, getting very excited about seeing the "real" stadium built. If I had to ask Dr. Freud, I think he'd tell me that I'm at the end of my rope waiting for the design to be unveiled!
More posts: Nationals Park
 

News from Zoning Commission land: at Monday's meeting, the text amendment to the Capitol Gateway Overlay about the stadium was finally approved. As soon as it gets posted in the DC Municipal Regulations, I'll post it here, although in the meantime you can read the text of the amendment from the July 29 DC Register. In other DCOZ news, there will be a hearing on Dec. 19 on Capper/Carrollsburg, to consider Phase I Final Approval and modifications to the consolidated and prelimary PUD. Phase I final approval references the land between 3rd and 4th and K and M Streets, where they are proposing to build 91 3- to 4-story residential units (note that the existing private homes in these blocks will not be demolished); this application also addresses the plans to build a new community center on 5th Street between K and L Streets. At the ANC 6D meeting on Oct. 17, it was indicated that the breakdown of the 91 units would be: 51 units would be 3-4 bedroom townhouses sold at market rate or moderate (80%-120% median income), 11 would be section 8 ownership units, and 29 would be public housing rental units. These units are in addition to the ones already in the pipeline for the blocks between 4th and 5th and Virginia and M--there will be a total of 208 market-rate townhouse units in these first two phases. The community center will include a daycare facility for 66 children, a rec center, a computer lab, a gym, a game room, and meeting/classrooms. AND 6D will be voting on this at their Nov. 14 meeting.

 

The 11th Street Bridges Environmental Impact Statement project has released its first newsletter, which contains a lot of really useful information about what exactly the project is, and how it's going to work. There will be two more public scoping meetings on Dec. 13 and 14. The newsletter also notes that construction on new ramps could begin as early as Fall 2007.

More posts: 11th Street Bridges
 




                  © Copyright 2024 JD.