Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Nov 03, 2014
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


3 Blog Posts

At 5:30 pm on Tuesday, Nov. 4, the ribbon will be cut and Harris Teeter, the neighborhood's first grocery store, will at last open at 4th and M, SE. And, after the ceremonies and a free tasting event that runs until 8 pm, the store will be open for shopping until midnight, and then will open at 6 am Wednesday for its first full day.
And of course heaven forbid that I'd just wait until the doors open to the public--the folks at Teeter were nice enough to give my camera a quick tour, while dodging the hive of activity that you can imagine marks a 50,000-square-foot grocery store 24 hours before it opens.
I took way too many photos of something that will just become part of the neighborhood's fabric quite quickly, but, well, it was fun.
Check out the gallery. There's a lot more than just these.
UPDATE: Since the numbers just arrived, I thought I'd mention that this store is 6,000 square feet larger than the Jenkins Row store at 14th and Pennsylvania, SE, and basically the same size as the one at 1st and M, NE.
 

Perhaps it was the teensy bit of publicity garnered over the weekend, because a press release is just out from Forest City Washington officially announcing that the rumors are true:
A new restaurant from Bo Blair's Georgetown Events group named Due South will bring a "heaping helping of southern-style cuisine and hospitality" to the Lumber Shed at the Yards in spring 2015, helmed by Bayou executive chef Rusty Holman.
It will occupy 3,366 square feet on the northwest corner of the Shed, and will have outdoor seating.
A quote of note from the press release: “ 'We were early believers in the Capitol Riverfront as a vibrant location for food and drink since opening The Bullpen in 2009,' said Bo Blair. 'Now, we’re very excited to be able to become a permanent part of The Yards. The growth of the restaurant scene in The Yards is truly a great thing for this city and we certainly wanted to be a part of it.' "
Due South will join Osteria Morini, Agua 301, Ice Cream Jubilee, and the also-coming-in-spring-2015 Navy Yard Oyster Company at the Lumber Shed.
This also means that the Shed's retail spaces are now 100 percent leased.
 

A truly unexpected piece of news has just come across the transom, via WBJ: Apparently a permit was issued Friday that will allow the start of construction on the long-planned beer garden at 8th and L, SE.
It will be called "The Brig," and will seat 210 and serve 299, and property owner Alan Gaunoux told WBJ that he "expects to break ground next week." I believe the seating is configured as 99 indoor seats and another 200 outside. (see update, below)
This project has been so dormant that I haven't written a post about it since November of 2011. I thought it was still languishing in the Historic Preservation Review Board process, but apparently all systems must be go, though, as WBJ says, "early versions of the development were scaled back[.]"
You can see the rendering from back in 2011 and read the multiple posts on the project's early days on my project page, though I don't know how much it resembles what will actually be coming. It is still apparently a one-story structure, with a bar, and some food, and perhaps some live music.
UPDATE: I will write another post on this in a few days--I'm looking at documentation that indicates this is definitely a very far scaled back operation in terms of a "building" from what was being looked at in 2011. Puts the "garden" in beergarden.
 




                  © Copyright 2025 JD.