Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Nov 03, 2019
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

Let's talk ovals. Well, one oval in particular, which is the oval that is going to be built on the western side of the new Frederick Douglass Memorial Bridge, that big construction project you're seeing immediately downriver of the existing bridge.
As I've been taking pictures of the intersection of South Capitol and Potomac as it is currently configured, I've been having a hard time visualizing how it will change when the bridge and traffic oval are completed, and so even though I'm sure at some point DDOT has created an overlay exactly like this one, I decided to make one myself that's a little larger. (If you want a clean version of the current satellite view to better compare with, here's Google Maps.)
As you can see, the new bridge will not be arriving at the exact southern end of the oval, but instead more on the south-southeast edge. And the South Capitol-Potomac "intersection" does not split the oval in half. The northeastern part of the oval will chop off a bit of the large plaza at the approach to the Nats Park Home Plate Gate, and you can also see why some buildings near the current intersection have been demolished in the past year.
Here are some renderings showing what the view could look like up South Capitol from the oval, and also how the Anacostia Riverwalk will run under the bridge to allow for pedestrian/cyclist movement to and from Southeast and Southwest without having to navigate the oval's traffic crossings.
This oval (and also the one on the bridge's eastern side, which is outside the JDLand Coverage Area) are going to be a big deal when they arrive, and my guess is that there will be considerable squawking from all sides at first. But they are coming--and I'm almost as fascinated with this part of the project as I am with the new bridge itself.
Speaking of which, I went up there and took some pictures today.
If you want to know more, there's my project page, or the voluminous official site, NewFrederickDouglassBridge.com. It's all supposed to be completed by the end of 2021, but We Shall See. (And if you want to know more about the changes that are on the boards for the rest of South Capitol Street north of P, try my South Capitol Street page.)
 




                  © Copyright 2025 JD.