Near Southeast DC's Completed, Proposed and Active Developments

All data compiled by JDLand.com. (Message JD with questions, updates, etc.)
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 

Click the tabs above to change the type of listings.
See also the Near Southeast Food Map for eats that are available and coming soon.
      Residential            Office            Retail/Recreation/Hotel            Infrastructure      

Completed Projects


Novel South Capitol
2 I Street
RCP Development
580-unit apartment building on
former McDonald's site
Underway 2017, delivered 2019


Capper/The Harlow
Square 769N, 1100 2nd Place, SE
DC Housing Authority
176 rental units,
including 36 public housing
4,000 square feet of retail
Underway 2017, delivered 2019


Yards/Parcel O

PN Hoffman/Forest City
140-unit condo building (Bower),
190-unit apt building (The Guild)
Underway fall 2016, delivered 2019


The Emblem at Barracks Row
801 Virginia Ave.
Approx. 22 condos
3,000 sq ft retail
Underway 2017
Delivered 2018


1221 Van

JBG
290 units
26,000-sq ft retail
Construction begun Nov. 2015
Move-ins early 2018


Agora

800 New Jersey Ave.
335ish rental units,
ground floor Whole Foods
Construction starting June 2014,
Leasing and Move-ins January 2018


Insignia on M

1111 New Jersey Ave.
Developed by Donohoe Cos.
324 units
Site demolition late summer 2014
Opened Spring 2017
insigniaonm.com


F1rst

Grosvenor/McCaffery
1263 1st St. SE
325 Units
Construction begun March 2015
Opened Spring 2017
liveatfirstdc.com


One Hill South

28 K St. SE
Developed by Ruben Cos./Related
380 units
Ground-floor retail
Construction begun Feb. 2015
Completed early 2017


ORE82

82 I St.
Greystar and RCP Development
224 units
5,500 sq ft ground-floor retail
Construction begun Feb. 2015
Completed fall 2016


The Bixby

601 L Street
aka Lofts at Capitol Quarter
195 mixed-income units
Groundbreaking March 2014
Delivered 2016


Dock 79

MRP Realty & Florida Rock Properties
300 units
Construction begun Nov. 2014
Completed August 2016


Park Chelsea

880 New Jersey Avenue
Developed by William C. Smith
430 rental units
Construction begun fall 2012,
First move-ins April 2016
ParkChelseaDC.com


Yards/Arris

1331 4th St., SE
Forest City Washington
327-unit building
20,000 sf ground-floor retail
Construction begun late 2013
First move-ins March 2016


Parc Riverside

1011 1st St., SE
Toll Brothers
Lot purchased in 2012
277-unit building
Construction begun Sept. 2013
Opened early 2015


Twelve12

1212 4th Street
The Yards
Developed by Forest City
220ish rental units
Ground-floor Harris Teeter and
Vida Fitness Center
Construction started Dec. 2011
Delivery mid 2014
dcyards.com


Capitol Quarter
120 market-rate and
91 workforce-rate homes
at old Capper/Carrollsburg
public housing site
Construction started June 2008
Completed Fall 2012
eya.com


The Yards/Foundry Lofts

3rd and Tingey
Developed by Forest City
Renovation of Pattern/Joiner Shop
170 rental units
Interior demo begun 2008,
Construction stopped late 2008,
Restarted late summer 2010
Opened December 2011
www.dcyards.com


Velocity Condos

1025 1st Street
Cohen Companies/ADC Builders
14 stories, 200 condos
4,000 sq ft retail
Construction begun June 2007
First Move-ins October 2009
www.velocitycapitol.com


909 at Capitol Yards
909 New Jersey Ave.
Developed by JPI
237 rental units
6,000 sq ft retail
Construction begun June 2007
First Move-Ins April 2009
909apts.com


Onyx on First
1100 First Street
Developed by Faison and
Canyon-Johnson Urban Fund
226,000 sq ft, 14 stories
266 rental units
Construction begun Sept. 2006
First Move-Ins Sept. 2008
onyxonfirst.com


100 Capitol Yards 
100 I Street (right)
246 rental units
Three underground parking levels
Construction begun Sept. 2006
First Move-Ins July 2008
capitolyardsdc.com


70 Capitol Yards 
70 I Street (left)
Developed by JPI
448 rental units
Three underground parking levels
Construction begun Sept. 2006
Floors 1-3 Opened June 2008
capitolyardsdc.com


Capper Building #2
400 M Street
139-unit rental building
for low-income senior citizens
and workforce-income-level residents
Construction begun December, 2005
Opened November 2007
400mdc.com


Capper Seniors #1
5th Street and Virginia Ave.
160 units of public housing
for senior citizens
Construction begun March, 2005
Completed December 2006
Destroyed by fire Sept. 2018


Capitol Hill Tower
New Jersey Ave. & K Street
340+ co-ops
To include ground-floor retail
Construction begun Spring, 2004
Delivered 2nd Quarter, 2006
www.capitolhilltower.com


Marine
Bachelor Enlisted Quarters

7th and L Streets

166 units
Construction begun 2002
Delivered Summer 2004

   
Currently Under Construction


Capper Seniors #1
5th Street and Virginia Ave.
Rebuild of 160 units senior housing
Original building destroyed by fire Sept. 2018
Permits approved Sept. 2019


1000 South Capitol

Lerner Enterprises
330-unit residential building
Underway late summer 2019


CSX East Residential
1st and H St., SE (when built)
800 units in two of three buildings
Initial work underway summer 2019


37 L Condos
DBT Development
11-story, 74-unit condo building
Underway early 2019


One Hill South Phase 2

950 South Capitol
Reuben, Related Cos.
300ish units
No retail
Site work begun summer 2018


The Maren

71 Potomac Ave.
FRP and MRP
253 units, 2nd Phase of Riverfront project
12,500 sq ft retail
Underway spring 2018


DC Crossing/Square 696

Tishman Speyer
1st, Half, K and I Streets
800 apartment units, plus
  approx. 44,000 sf retail
Underway spring 2018


Meridian on First

1000 1st St. SE
Paradigm Cos.
275-unit residential building
Underway early 2018
meridianonfirstdc.com


Yards/Parcel L

Forest City Washington
270-unit apt building (The Estate)
17,000 sq ft retail
Underway late 2017


The Garrett

150 I St.
393 units
Underway late 2017
thecollectivedc.com/garrett


1250 Half St.

Jair Lynch Partners
Excavated early 2007, sold 2014
310 residential units
60,000+ square feet of retail
Underway summer 2017


Envy Condos

70 N St.
123 units
Underway summer 2017


Parc Riverside Phase 2

Half and K
Lot purchased in 2012
250 rental units
Underway summer 2017


West Half Street
1299 Half Street
400+ units
65,000 sq ft retail
Underway spring 2017


Avidian
Monument Realty
163-unit condo building, sibling
to NAB HQ
Construction underway early 2017

   
In the Pipeline

Yards/Parcel I
Forest City Washington
11-story, 348-unit residential building
13,600 sq ft retail
No timeline

Navy Yard Metro Chiller Site
MRP Realty
Half and L streets
126-unit condo building
No timeline

100 K
12-story, 34-unit building
No timeline

Yards at DC Water Site
1st and O Streets
600 residential units
Ground-floor retail
No timeline

1333 M Street
Cohen Siegel
673 units in 3 buildings
No timeline

New Capper Apartment Buildings
2nd Street Between I and L,
Facing Canal Park
Two buildings,
approx. 370 rental units,
all income levels
No timeline

DPW Trash Transfer Lot
2nd and K streets
Approx. 322 rental units,
all income levels
No timeline


See also: Near Southeast Food Options Map
Latest Near Southeast Satellite Image (October 2012) - See Satellite Photos Back to 1949


Detailed Project Guides/Maps
Stadium Corridor
M Street
New Jersey Ave.



Return to Quick List


 

Click the tabs above to change the type of listings.
See also the Near Southeast Food Map for eats that are available and coming soon.
      Residential            Office            Retail/Recreation/Hotel            Infrastructure      

Completed Projects


Novel South Capitol
2 I Street
RCP Development
580-unit apartment building on
former McDonald's site
Underway 2017, delivered 2019


Capper/The Harlow
Square 769N, 1100 2nd Place, SE
DC Housing Authority
176 rental units,
including 36 public housing
4,000 square feet of retail
Underway 2017, delivered 2019


Yards/Parcel O

PN Hoffman/Forest City
140-unit condo building (Bower),
190-unit apt building (The Guild)
Underway fall 2016, delivered 2019


The Emblem at Barracks Row
801 Virginia Ave.
Approx. 22 condos
3,000 sq ft retail
Underway 2017
Delivered 2018


1221 Van

JBG
290 units
26,000-sq ft retail
Construction begun Nov. 2015
Move-ins early 2018


Agora

800 New Jersey Ave.
335ish rental units,
ground floor Whole Foods
Construction starting June 2014,
Leasing and Move-ins January 2018


Insignia on M

1111 New Jersey Ave.
Developed by Donohoe Cos.
324 units
Site demolition late summer 2014
Opened Spring 2017
insigniaonm.com


F1rst

Grosvenor/McCaffery
1263 1st St. SE
325 Units
Construction begun March 2015
Opened Spring 2017
liveatfirstdc.com


One Hill South

28 K St. SE
Developed by Ruben Cos./Related
380 units
Ground-floor retail
Construction begun Feb. 2015
Completed early 2017


ORE82

82 I St.
Greystar and RCP Development
224 units
5,500 sq ft ground-floor retail
Construction begun Feb. 2015
Completed fall 2016


The Bixby

601 L Street
aka Lofts at Capitol Quarter
195 mixed-income units
Groundbreaking March 2014
Delivered 2016


Dock 79

MRP Realty & Florida Rock Properties
300 units
Construction begun Nov. 2014
Completed August 2016


Park Chelsea

880 New Jersey Avenue
Developed by William C. Smith
430 rental units
Construction begun fall 2012,
First move-ins April 2016
ParkChelseaDC.com


Yards/Arris

1331 4th St., SE
Forest City Washington
327-unit building
20,000 sf ground-floor retail
Construction begun late 2013
First move-ins March 2016


Parc Riverside

1011 1st St., SE
Toll Brothers
Lot purchased in 2012
277-unit building
Construction begun Sept. 2013
Opened early 2015


Twelve12

1212 4th Street
The Yards
Developed by Forest City
220ish rental units
Ground-floor Harris Teeter and
Vida Fitness Center
Construction started Dec. 2011
Delivery mid 2014
dcyards.com


Capitol Quarter
120 market-rate and
91 workforce-rate homes
at old Capper/Carrollsburg
public housing site
Construction started June 2008
Completed Fall 2012
eya.com


The Yards/Foundry Lofts

3rd and Tingey
Developed by Forest City
Renovation of Pattern/Joiner Shop
170 rental units
Interior demo begun 2008,
Construction stopped late 2008,
Restarted late summer 2010
Opened December 2011
www.dcyards.com


Velocity Condos

1025 1st Street
Cohen Companies/ADC Builders
14 stories, 200 condos
4,000 sq ft retail
Construction begun June 2007
First Move-ins October 2009
www.velocitycapitol.com


909 at Capitol Yards
909 New Jersey Ave.
Developed by JPI
237 rental units
6,000 sq ft retail
Construction begun June 2007
First Move-Ins April 2009
909apts.com


Onyx on First
1100 First Street
Developed by Faison and
Canyon-Johnson Urban Fund
226,000 sq ft, 14 stories
266 rental units
Construction begun Sept. 2006
First Move-Ins Sept. 2008
onyxonfirst.com


100 Capitol Yards 
100 I Street (right)
246 rental units
Three underground parking levels
Construction begun Sept. 2006
First Move-Ins July 2008
capitolyardsdc.com


70 Capitol Yards 
70 I Street (left)
Developed by JPI
448 rental units
Three underground parking levels
Construction begun Sept. 2006
Floors 1-3 Opened June 2008
capitolyardsdc.com


Capper Building #2
400 M Street
139-unit rental building
for low-income senior citizens
and workforce-income-level residents
Construction begun December, 2005
Opened November 2007
400mdc.com


Capper Seniors #1
5th Street and Virginia Ave.
160 units of public housing
for senior citizens
Construction begun March, 2005
Completed December 2006
Destroyed by fire Sept. 2018


Capitol Hill Tower
New Jersey Ave. & K Street
340+ co-ops
To include ground-floor retail
Construction begun Spring, 2004
Delivered 2nd Quarter, 2006
www.capitolhilltower.com


Marine
Bachelor Enlisted Quarters

7th and L Streets

166 units
Construction begun 2002
Delivered Summer 2004

   
Currently Under Construction


Capper Seniors #1
5th Street and Virginia Ave.
Rebuild of 160 units senior housing
Original building destroyed by fire Sept. 2018
Permits approved Sept. 2019


1000 South Capitol

Lerner Enterprises
330-unit residential building
Underway late summer 2019


CSX East Residential
1st and H St., SE (when built)
800 units in two of three buildings
Initial work underway summer 2019


37 L Condos
DBT Development
11-story, 74-unit condo building
Underway early 2019


One Hill South Phase 2

950 South Capitol
Reuben, Related Cos.
300ish units
No retail
Site work begun summer 2018


The Maren

71 Potomac Ave.
FRP and MRP
253 units, 2nd Phase of Riverfront project
12,500 sq ft retail
Underway spring 2018


DC Crossing/Square 696

Tishman Speyer
1st, Half, K and I Streets
800 apartment units, plus
  approx. 44,000 sf retail
Underway spring 2018


Meridian on First

1000 1st St. SE
Paradigm Cos.
275-unit residential building
Underway early 2018
meridianonfirstdc.com


Yards/Parcel L

Forest City Washington
270-unit apt building (The Estate)
17,000 sq ft retail
Underway late 2017


The Garrett

150 I St.
393 units
Underway late 2017
thecollectivedc.com/garrett


1250 Half St.

Jair Lynch Partners
Excavated early 2007, sold 2014
310 residential units
60,000+ square feet of retail
Underway summer 2017


Envy Condos

70 N St.
123 units
Underway summer 2017


Parc Riverside Phase 2

Half and K
Lot purchased in 2012
250 rental units
Underway summer 2017


West Half Street
1299 Half Street
400+ units
65,000 sq ft retail
Underway spring 2017


Avidian
Monument Realty
163-unit condo building, sibling
to NAB HQ
Construction underway early 2017

   
In the Pipeline

Yards/Parcel I
Forest City Washington
11-story, 348-unit residential building
13,600 sq ft retail
No timeline

Navy Yard Metro Chiller Site
MRP Realty
Half and L streets
126-unit condo building
No timeline

100 K
12-story, 34-unit building
No timeline

Yards at DC Water Site
1st and O Streets
600 residential units
Ground-floor retail
No timeline

1333 M Street
Cohen Siegel
673 units in 3 buildings
No timeline

New Capper Apartment Buildings
2nd Street Between I and L,
Facing Canal Park
Two buildings,
approx. 370 rental units,
all income levels
No timeline

DPW Trash Transfer Lot
2nd and K streets
Approx. 322 rental units,
all income levels
No timeline


View Project Lists, by Type
(not formatted for mobile), or:

Active Projects
Yards/Chemonics HQ
Capper Seniors 2.0
1000 South Capitol
CSX East
DDOT HQ
37 L St. Condos
The Maren
DC Crossing
Meridian on First
Douglass Bridge
The Garrett
Estate
Parc Riverside Phase 2
1250 Half St./Envy Condos
Natl Assoc Broadcasters HQ
Avidian


In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100


Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row