Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1518 Blog Posts Since 2003
Go to Page: 1 | ... 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 ... 152
Search JDLand Blog Posts by Date or Category

As the clock ticks toward Opening Day (38 days away!), it's normal to be wondering about the status of some of the other projects near the ballpark. I've just gotten an update from the Office of the Deputy Mayor for Planning and Economic Development on Diamond Teague Park, the planned public plaza with water taxi piers on the banks of the Anacostia just across from the stadium's grand staircase at First and Potomac. The design of the park is being finalized, but you can see recent site maps and renderings on my project page (there are also links to enlarged versions of those images for better viewing).
The city is continuing to work with the Army Corps of Engineers to get permits for the piers. After the Army Corps signs off, some DC permits will need to be approved, and then construction on the park's first phase can begin--this will include all of the "in-water improvements" (i.e., the piers) and the portion of the park that's closest to the waterline. It's expected that this first phase will be completed by the time winter arrives in late 2008. The northern portion of the park site sits on land controlled by WASA, and must wait for those operations to be relocated before that part of the park can be built.
In the meantime, the park site will be "beautified" for Opening Day, with plans for a bit of a cleanup, new plantings, sandstone, etc.
As for the RiverFront site next door (which we all know as Florida Rock but which the developers want me to call either "FRP" or "RiverFront" to prevent confusion between themselves [Florida Rock Properties/FRP Development Corp.] and the not-involved-with-developing-the-site Florida Rock Industries)--I've been told that new fences will be put up around the site by Opening Day, to pretty things up a bit along that stretch as well.
 

My Ballpark and Beyond column in today's District Extra of the Post covers last week's release of the Draft Environmental Impact Statement for South Capitol Street, the impending closure of Metro's Southeastern Bus Garage at Half and M, tonight's zoning hearing on allowing additional temporary surface parking lots in Southwest, and a reminder about today's ballpark job fair.
(And I've been under the weather the past few days, hence the somewhat brief updates.)
 

* City Paper points us to a new blog by the WashTimes tracking all the news surrounding the Pope's April visit to the United States. Including, of course, the April 17 mass at Nationals Park. There's also the news that a 14-foot-tall crucifix from St. Mark's Church in Hyattsville has been selected to be displayed at the stadium mass.
* Nats320 continues with its series of, um, lengthy interviews, this time with the man whose company is going to be "dressing" the ballpark.
* I'm not sure why some news organizations are only now reporting this (since it was announced last week), but in case you missed it, single-game tickets for Nats games go on sale March 4.
* On Feb. 28, there's a gathering planned for people to share stories of the gay businesses along O Street SE that were shut down to make way for the ballpark.
* Check the stadium web cam's images from last night to see the ballpark's lights all turned on.
 

Tim Lemke of the Washington Times takes a look at today's Examiner editorial about the full cost of Nationals Park, which the Examiner says is now reaching $759 million but which may be reached thanks to, Tim says, "a few factual errors and a misleading statement."
Comments (0)
More posts: Nationals Park
 

From the Capitol Riverfront BID, word of a Happy Hour on Thursday (Feb. 21) being given by the Velocity Condos folks (so they just might possibly want to give you all the scoop about their offerings). It's at Sonoma (223 Pennsylvania Ave., SE) from 6 to 8 pm. There's also another one scheduled for March 13.
 

A reminder that the second Nationals Job Fair for part-time and seasonal employement at the ballpark is scheduled for Thursday (Feb. 21) from 10 am to 2 pm at King Greenleaf Recreational Center at 201 N St., SW. Some highlights:
* The positions, most of which are part-time and seasonal, are open to persons ages 18 and older (including senior citizens).
* The Nationals are going to be looking with particular interest at residents of Ward 6 who will not need parking to get to jobs at the stadium.
* Residents who have little work experience but who are "reliable and willing workers" will be considered for positions that they have the skills for.
You can read the original announcement post at Tommy Wells's site for additional details.
More than 2,500 people showed up at the first fair on Feb. 9, according to the Post.
Comments (0)
More posts: Nationals Park
 

A shocking investigative report from NBC4, entitled "Parking May Be Tight At Nationals' New Stadium": "In just about 40 days, the Washington Nationals' new ballpark along the Anacostia River is set to open its gates for more than 40,000 fans. But while the stadium is expected to be ready, parking could still be a problem, News4's Tom Sherwood reported." Thank heavens that the lack of parking has finally been uncovered by the media, since it hasn't been talked about at all up to now. Coming soon, news organizations break the astonishing story that not all of Near Southeast will be built out and available for residents and visitors by Opening Day.
(Oh, come on, I get to be sarcastic once in a while!)
Comments (0)
More posts: Nationals Park
 

If you haven't checked the Stadium Web Cam in the past few days (or sneaked a peek through the gap on South Capitol Street), you haven't seen the fun "Nationals Park" lettering now added across the top of the scoreboard. There are also red seats now being installed below the outfield restaurant.
I'm also hearing that this is the week that the traffic and parking plans for Opening Day are going to be released, so watch this space for the latest on that.
UPDATE: Looks like one of Channel 9's staffers got a ballpark tour on Friday--he's posted a few pictures.
Comments (0)
More posts: parking, Nationals Park
 

Saw one of these signs pointing cyclists to the ballpark for the first time today--I think they've only gone up in the past week or so. (This was on Fourth St., SE, just north of Pennsylvania Ave.) Sorry for the lousy quality--it was dusk and my camera phone wasn't cooperating. But you get the idea. (UPDATED with a better photo, finally.)
Comments (0)
More posts: Nationals Park
 

Feb 16, 2008 1:38 AM
From the WashTimes: "D.C. Council Chairman Vincent Gray yesterday said a new soccer stadium at Poplar Point would help alleviate parking problems across the Anacostia River at the Nationals new ballpark. 'We have a horrific parking problem with the Nationals stadium,' Gray said. 'I'm not sure people know how close Poplar Point is. If we coordinate schedules, we could actually have parking for D.C. United used for the Nationals as well.' [...] Conceivably, Gray said, fans heading to Nationals game could walk from Poplar Point across a pedestrian walkway on one of the bridges crossing the Anacostia."
Comments (0)
More posts: Nationals Park
 

Feb 15, 2008 10:28 AM
The Draft Environmental Impact Statement that describes two alternatives for reconfiguring South Capitol Street from just south of Firth Sterling Avenue north to I-395 has now been released, and is available online: there's the compact executive summary for folks who just want the basics, or the full shebang, with 80-plus chapters, appendices, and reports. Note that this draft EIS does not include a final choice for the design of the new Douglass Bridge that would be built to the southwest of the current bridge, though that decision will be made with the final EIS. (I'm a fan of the arched bascule design, because I'm old school.) There's no way I'm going to try to provide a comprehensive overview of what this project is envisioning, so here's some bullet points:
* For Near Southeast, both build alternatives would reconfigure the intersection with the SE/SW Freeway, replacing the existing ramp that begins at I Street with an at-grade intersection underneath the freeway that would have two left-turn lanes to a new ramp. With the removal of the existing ramp to I-395, the intersection and South Capitol and I would also be reconfigured. Also included in this project would be streetscape improvements to New Jersey Avenue, with two travel lanes and two parking lanes and much wider tree-lined sidewalks.
* The main differences between the alternatives for this northern stretch of South Capitol Street are the intersections with Potomac Avenue and with M Street. At Potomac Avenue, there would be either a reconfigured signalized intersection or a large traffic oval connecting South Capitol, Potomac, Q Street, and the new Douglass Bridge. At M Street, a decision will be made between keeping the current underpass for north/south traffic or replacing it with an at-grade intersection. And, in the second build alternative, the K and L street intersections would be opened to cross traffic. There are also many changes planned for South Capitol Street and the Suitland Parkway south of the Douglass Bridge, which are spelled out in the Alternatives section if you're interested. (I'm waiting for a reply from DDOT about whether portions of each build alternative can be chosen a la carte to create a final alternative. UPDATE: As was the case with the 11th Street Bridges EIS, the final plans can indeed take some portions of one alternative and some from the other. So it's possible, as an example, that the traffic oval from alternative #2 could be chosen, but the unchanged M Street intersection from alternative #1 could be chosen, too.
* Depending on which alternatives and which bridge design is chosen, the Draft EIS puts the estimated costs for this project at anywhere between $508 million and $781 million. Flyers given out at the Anacostia Waterfront Community Fair last month indicated that construction on the new Douglass Bridge could begin in 2010, with completion in 2015. The Draft EIS doesn't seem to lay out any timeline for completion of the entire South Capitol Street project.
There are two public meetings planned to discuss the Draft EIS: on March 4 at Birney Elementary School, 2501 Martin Luther King Jr., Ave., SE, and on March 5 at Amidon Elementary School, 401 I St., SW. Both will run from 6:30 to 8:30 pm. The public comment period ends on March 31, and methods for submitting your comments are spelled out on the report site. You can also see print versions of the Draft EIS at a number of local libraries in the area.
 

Feb 15, 2008 8:59 AM
Today's Washington Business Journal has a long piece about legislation making its way through the city council that would require site-specific permits for street vendors and that would create "development zones", "essentially specific geographic areas with a uniform design standard that would be established through a partnership of DCRA, neighborhoods and their business improvement districts." The Capitol Riverfront BID plans on applying to make the area around the ballpark such a zone. The article has quotes from the Nationals and the BID about what sort of vending they'd like to see. Gregory McCarthy of the Nationals says that the team thinks "it's in the city's interest to have a good fan experience and to have vending around the ballpark be regulated in a reasonable manner -- but also be of sufficient quality." Michael Stevens of the BID says that vendors shouldn't sell items that compete with those inside the ballpark: "I want to see a variety of vending food options, drink options. I'd like better-looking carts, [although] I don't know what that means yet." If the bill is not passed by Opening Day, "licensed vendors could set up shop at any site that meets current regulations for vendors -- which include such requirements as not obstructing the right of way for pedestrians. Near the stadium that could include spots along M, N, Half and First streets SE."
Comments (0)
More posts: Nationals Park
 

Feb 14, 2008 5:12 PM
A bit on the run this afternoon, so I have to be brief: today Metro's Finance, Administration, and Oversight committee gave approval to two items I wrote about earlier this week: the plans to expand to nights and weekends the N22 bus service that shuttles between Union Station, Eastern Market, and the Navy Yard Metro station (the Post says until 10:30 on weeknights--hope that's late enough for baseball), and to move around some money to allow for the closure of the Southeastern Bus Garage at Half and M. Here's the WMATA press release on the garage closure, and do read my previous entry for additional details and links to WMATA documents. These two items are expected to be given final approval by the full WMATA board on Feb. 28.
Stadium parking aficianados should note that the closure of the bus garage--in addition to lessening the chance for "encounters" between buses and pedestrians--will open up two existing lots in the "Red Zone" just north of the ballpark, as well as space within the garage itself and just to its south. Also, WMATA has been using a surface parking lot at Buzzards Point that would be vacated with this move. There's no word at this point on when exactly the garage will be vacated, and if the space will be used for parking this season.
 

Feb 14, 2008 5:04 PM
Since I posted that NBC4 story crowing about a deal, I feel it necessary to follow up with this from the Post this afternoon: "Mayor Adrian M. Fenty said today that no deal has been struck to use public funds to build a professional soccer stadium in Southeast Washington. He also said his talks with D.C. United about a partnership do not represent a drastic departure from his stance against public financing of the Nationals baseball stadium." Read the rest of the article for details, including discussions of Fenty's stand on public financing of sports venues. [Will. Not. Get. Sucked. In. Must. Resist.]
Comments (0)
More posts:
 

Feb 14, 2008 9:58 AM
This week's Ballpark and Beyond column in the Post's District Extra is about the new Waterfront Park at The Yards: "Although Nationals Park is getting the lion's share of attention these days as Near Southeast's biggest development, the 42-acre site two blocks to the east known as the Yards is starting its transformation away from its former life as the barren walled-off Southeast Federal Center. And we're now getting our first peeks at early designs for the development's 5.8-acre park on the banks of the Anacostia River. Designed by M. Paul Friedberg and Partners, the park will have "passive and active" recreation spaces, along with retail and entertainment offerings that Yards developer Forest City Washington believes will make it a lively year-round destination for residents and tourists in the daytime and at night." And it'll be right across from the soccer stadium!
Comments (0)
More posts: The Yards, Yards Park
 

Feb 13, 2008 9:11 PM
Looking outside my boundaries long enough to pass along this: "News4 has learned that Mayor Adrian Fenty plans to propose building a $200 million soccer stadium on the banks of the Anacostia River across from the city's new Nationals ballpark. Sources told News4's Tom Sherwood that the soccer stadium would be part of a $1 billion development deal on about 40 acres of land at Poplar Point along the river. The sources said the mayor will announce as early as Thursday that he has selected Clark Construction to develop the land." As for the cost? "Under the mayor's proposal, which must be approved by the D.C. Council, the city would spend about $200 million on the soccer stadium. Funds to pay for the soccer stadium bonds would come from taxes and revenue that already are being generated by the new baseball stadium, which opens in late March."
UPDATE: I'm not going to be tracking this (yet {ahem}), but here's a more complete article, along with the more correct name of the winning bidder, Clark Realty Capital. Mayor Fenty is announcing the winner this morning at 10:30.
Comments (0)
More posts:
 

Feb 13, 2008 2:35 PM
At Monday's ANC 6D meeting (which I missed because I had three meetings on my calendar for that night and the ANC never released an agenda for me to know whether I should go or not), there was apparently a big discussion of Zoning Case 07-08A, scheduled to be heard on Feb. 21, which seeks to allow temporary surface parking lots for no more than five years on a series of blocks in Southwest, mainly in Buzzards Point (squares 603, 605, 658, 661, 662, 662E, 664, 664E, and Square 658, Lot 7 for those of you with tax parcel maps handy, or look on the last page of this). A temporary emergency version of this text amendment passed with no discussion back in October; the Feb. 21 hearing is to make the amendment good for five years.
When the original case (07-08) establishing the ability to build temporary lots on a number of blocks in Near Southeast was passed, parking lots did not automatically appear on every block covered in the amendment. However, ANC 6D and residents of Southwest are apparently viewing this new amendment as the city going back on a promise to not build any parking lots in Southwest. Here is the ANC 6D resolution.
I've been at meetings over the past few months where city and team officials have said that there would be no ballpark parking offered in Buzzards Point this season because of the lack of sidewalks, streetlamps, and other improvements; the Office of Planning report for Case 07-08A says: "The Nationals have advised OP that, to date, no agreements with owners of individual lots have been reached so it is not likely that any of the temporary parking will be located on these sites prior to opening day in 2008[.]" I'm checking with the Nationals to see if this has changed. But certainly Buzzards Point would be still be viewed as a prime location for additional surface parking, if it's needed.
It's anticipated that the need for temporary surface lots will lessen as new buildings go up near the ballpark; in the next two years or so, underground garages that could potentially offer additional stadium parking will open at Monument Half Street, 100 M, 1015 Half, Onyx, 70/100 I, Velocity, and 909 New Jersey.
 

Feb 12, 2008 12:19 PM
The agenda is now out for Thursday's meeting of Metro's Finance, Administration and Oversight Committee, with votes on two items of interest to Near Southeast and to ballpark-goers:
* WMATA is proposing to expand the weeknight and weekend service of the N22 bus that currently shuttles between Union Station (and its Red Line Metro stop) and the Navy Yard station at New Jersey and M via Eastern Market (and its Orange/Blue Line stop) and the Washington Navy Yard. The buses would run every 10 minutes, and on nights and weekends the route would eliminate the loop to 12th and M streets, SE (see the map on page 2 of the current timetable), in order "to provide a shorter and faster route to the ballpark." The District of Columbia is apparently going to pay $432,000 to cover the cost of the additional service from March through August. If approved, the expanded service would begin in March. The agenda documentation doesn't say what times the expanded service would end on weeknights or operate on weekends. Read the agenda packet for more.
* The city is also apparently offering to cover the costs of relocating the buses out of the Southeastern Bus Garage at Half and M (one block north of the ballpark), as part of a $1.39 million monetary shuffling that WMATA is proposing to undertake because the $69.25 million sale of the site to Akridge still has not been finalized. DC would cover the relocation costs until the sale is completed, and presumably by doing this the buses can get out of the garage by March 30. Read the agenda packet for more details. The city is extremely interested in getting the buses out of the way, not only because trying to operate that garage with hordes of pedestrians on their way to and from games would be a disaster waiting to happen, but also because the Nats might be able to squeeze a couple hundred more $35 Red Zone parking spaces out of the garage land and the two lots adjoining it across Van Street (one to the north and one to the south of the Public Storage building).
These are just preliminary votes; if approved on the 14th, they would then go in front of the full WMATA board for final approval on March 28.
 

Feb 12, 2008 11:50 AM
Word is out that single-game Nationals tickets will go on sale March 4 at 9 am. Barry has all the details.
Comments (0)
More posts: Nationals Park
 

Feb 12, 2008 10:24 AM
The new "Pay-to-Park" signs that have popped up around Near Southeast in the past few days (many without the accompanying multispace kiosks where one would actually *pay* to park) were brought up last night at a meeting last night with Tommy Wells and residents of Capitol Hill Tower. Rick Rybeck of DDOT seemed surprised that the signs were up already, and equally surprised to hear some residents reporting that they're getting ticketed for "expired meters" when parking by the signs, even though there's not as yet any meters to pay at. Neha Bhatt of Tommy's office said that the meter prices for parking still have not been determined, and that discussions are still ongoing as to whether high-cost meter parking will be allowed on I, K, L, First, and Half between New Jersey and South Capitol during ballgames.
But the main issue of the evening was that CHT residents are not as of now eligible for Residential Parking Permit stickers for their cars, which will leave them with no free on-street parking when the streets around their building are metered. (The plan is that everyone will have to pay to park on commercial streets, such as New Jersey, but on streets zoned residential, RPP-stickered cars will be able to park free but non-RPP cars will have to pay.) At first Tommy said that his impression was that trying to get RPP stickers for residents of a multi-unit building was not going to happen, but Rybeck said that it should be doable. By the end of the evening, it did appear that Rybeck and Bhatt had a bit more of an understanding as to the Catch-22 that CHT parkers could find themselves caught in if the Performance Parking plan is rolled in as currently envisioned. (The building does have an underground parking garage, but there is a long-simmering battle about garage parking between some residents and the building's owner that I'm way too chicken to try to characterize here, and so many residents park on the surrounding streets.)
 
1518 Posts:
Go to Page: 1 | ... 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 ... 152
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.