Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2021 Blog Posts Since 2003
Go to Page: 1 | ... 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 ... 203
Search JDLand Blog Posts by Date or Category

This news has already come through here as a rumor, but the Nats announced it officially today (via WBJ): "The Washington Nationals have chosen Levy Restaurants to run concessions at the team's ballpark, just one of many changes planned for the 1-year-old stadium's second season."
The article also describes the changes in store for the Red Porch Restaurant, which have also been in the media previously but are worth reposting in case you haven't been following along: "The Nationals are also working with HOK Sport, the ballpark's architect, to replace the center field restaurant's fixed glass wall with sliding glass to develop a better connection to the game, said team President Stan Kasten. The plan is to remove the last row of 32 fixed seats in center field in front of the restaurant, called the Red Porch, and add more tables, seating 44 people in the space. The concrete back wall will be removed and replaced with roll-up garage doors that open up that side of the building, creating 88 outdoor seats facing the center field plaza. [...] Other changes to the center field plaza include installing a stage for live music, building a larger pre-game set for local broadcasters to use on game days and erecting statues honoring Washington baseball legends Walter Johnson, Josh Gibson and Frank Howard."
And, there's this, which might be of interest to residents and workers desperate for food other than Five Guys and Subway: "The Nationals would like to open the Red Porch for lunch and dinner on nonevent days when the team is on the road, but nothing is definite for extended hours, Kasten said. 'We may experiment,' he said. 'We'll see.'"
 

A reminder that tonight is the first Anacostia Waterfront Forum, entitled "Sustainable Development, Infrastructure and the Future of the District of Columbia." It's at the MLK Library at 6:30 pm, and will feature the new director of DDOT Gabe Klein, along with chief engineer Kathleen Penney and other speakers. What is the event, exactly? "This educational forum series is designed to re-engage District residents in considering policies, concepts and potential outcomes embedded in the Anacostia Waterfront Framework Plan. The series is an opportunity to learn more about how the development of a world class Anacostia Waterfront can help create a more sustainable and inclusive future for District residents. "
Comments (0)
More posts:
 

Anyone checking out Luck of the Draw this weekend? It's running from 6 to 10 pm tonight and 2 to 6 pm on Sunday (after starting for four hours on Friday night). If so, visit the comments and post your impressions....
Comments (0)
More posts:
 

Eagle-eyed workers at USDOT had asked me about this lately, and now WBJ confirms (subscribers only) that work has stopped at the Foundry Lofts rehab project at the Yards: "Forest City Washington started transforming a former Navy industrial building into 170 loft apartments last year but recently called off the construction crews thanks to, you guessed it, a lack of financing -- in this case an inability of the D.C. Housing Finance Agency to sell bonds for the subsidized units."
And, there's this: a Forest City rep says "work continues on a waterfront park and landing retailers for the 44-acre, multiyear project, but sources say Dogfish Head Alehouse, once in discussions to open on the waterfront, is no longer interested."
So now the neighborhood has its first "skeleton."
UPDATE: On the other hand, WBJ is also reporting that chain brewery Gordon Biersch might be coming to Half Street, with a broker confirming that there is interest, but no deal has been signed: "Gordon Biersch is remaining mum, but sources point to Monument Realty's Half Street project as a likely candidate. The D.C. developer is putting the finishing touches on 55 M St. NW [um, no: SE], a 275,000-square-foot office building with ground-floor retail above the Navy Yard Metro station. The project, on the main pedestrian drag to the baseball stadium, doesn't have any announced tenants."
 

UPDATE: Here are a few photos from the ceremony, along with a closer peek at the construction underway.
(Original entry) Just got back from the ceremony at Diamond Teague Park; while I'm working on the photos, here's the press release about the event, which I'll note contain the same April-for-the-piers, July-for-the-park timeline I've been mentioning (and yes, I'm being lazy and just reproducing the press release--rough morning!):
"Mayor Adrian M. Fenty on Friday joined community leaders in a groundbreaking ceremony for Diamond Teague Park, an $8 million waterfront park that will link Nationals Park to the Anacostia River.
"'Diamond Teague committed his life to restoring, protecting and preserving the Anacostia River,' Mayor Fenty said. 'This park will be a fitting tribute to his legacy and it will mark our commitment as a city to carry on his work.'
"The park is named after 19-year old Diamond Teague, a member of the Earth Conservation Corps (ECC) who was murdered in 2003. The ECC members -- many live in communities along the river's banks -- work to improve the river's health and protect the plant and animal species that call the Anacostia home.
"[...]It will connect the ballpark to a pair of public piers and a 20-mile network of waterfront trails. A 250-foot pier will be built to host commercial vessels such as water taxis and charter boats. The pier will also include slips for the ECC and the District's fire and life safety vessels.
"The park will feature a separate 200-foot environmental pier for educational groups, kayaks and canoes. The piers are expected to be complete by baseball's Opening Day, April 13, 2009.
"Construction and planting work on the upland portion of the park will be completed by July. Muralist Byron Peck and City Arts are also working to complete a memorial dedicated to Diamond Teague that will be unveiled later this summer.
"The cost of the $8 million park is being covered through dedicated revenue streams tied to a number of adjacent economic development projects that surround the park including Florida Rock's one million square foot mixed-used project directly to the West of the park and JBG's U.S. Department of Transportation headquarters building to the East."
 

* On Friday at 10:30 am the mayor will be hosting a groundbreaking at Diamond Teague Park; construction started back in December (photos on my project page from a few weeks ago show the piers and ramps around the pumphouse have already been dismantled). The timeline as described to me at the end of January is that the new piers are to be ready by Opening Day, with the landscaping and land-based improvements to be completed by July; we'll see if those dates are still operative at tomorrow's event.
* The Capitol Riverfront BID newsletter says that JPI's 909 New Jersey is "set to open ahead of schedule in April." The "909 at Capitol Yards" official web site has floor plans and more information.
* Also from the BID newsletter (which isn't posted on their web site, otherwise I'd link to it), some occupancy numbers for the three buildings participating in this weekend's "Luck of the Draw" art extravaganza: Velocity has sold 52 of its 200 units (which is still right around the 25-percent mark reported back in July of last year); 100 I Street is 25 percent leased (it was reported at around 16 percent leased in December), and Onyx on First is 27 percent leased (after having been 8 percent leased in December).
* The BID also has the list of public events over the next few weeks at the Navy Yard. (I used to be on a mailing list for these and would add them to my calendar, but that ceased a while ago and the Navy Museum's own web site calendar hasn't been updated since last year.)
* Off-topic, but DC United says they're moving to Prince George's County.
* And Now, Anacostia has more on the legislation introduced today by Tommy Wells to place a five-cent fee on paper and plastic bags with the goal of helping to clean up the Anacostia River. (There's also a web site, trashfreeanacostia.com.)
 

(h/t DCist) What has been unofficially official around here since early December is now officially official: Artomatic 2009 will be held in Near Southeast, at Monument Realty's 55 M Street office building on top of the west entrance of the Navy Yard Metro station, from May 29 to July 5. Here's the Artomatic press release, which says that registration for artists wishing to participate will begin in March.
What exactly is Artomatic? "Held regularly since 1999, Artomatic transforms an unfinished indoor space into an exciting and diverse arts event that is free and open to the public. In addition to displays by hundreds of artists, the event features free films, educational presentations and children's activities, as well as musical, dance, poetry, theater and other performances." Free to the public, it will be open Wednesdays and Thursdays from noon to 10 p.m., Fridays and Saturdays from noon to 1 a.m., and Sundays from noon to 10 p.m. (Closed Mondays and Tuesdays.) Artomatic is also looking for volunteers; see the press release for more details.
 

* With thanks to SWill for passing the word (since I couldn't attend the meeting), I can report that ANC 6D on Monday night voted to support the plans for phase 2 of the Yards Park, which will be going in front of the Zoning Commission on March 2. (You can read my summary of last week's presentation to the ANC on the plans for more information.)
* If you're looking for analysis of what exactly the plans for the new 11th Street Bridges configuration might mean, Greater Greater Washington is taking a look at them (part one here; part two not yet posted). For what might perhaps be called an opposing viewpoint, DDOT's chief engineer Kathleen Penney contributed this article in the February Hill Rag about what DDOT sees as the benefits of the project. And, if you want some 11th Street Bridges material to use as a sleeping aid, I pass along this link (via Tommy Wells's blog) to the RFP for the design/build contract. (The "amendment" link is the *slightly* more comprehensible one.) There was a hearing last week on a bill about the contracting procedures for the bridge, but I'm not *so* desperate for content to wade into that.
(UPDATE) I already posted about this, but it's a good time to mention again that there's a public forum on the 11th Street Bridges on Feb. 17: "Sustainable Development, Infrastructure, and the Future of the District of Columbia," at the MLK Library at 6:30 pm. (DDOT just sent around its own announcement, now posted online.)
* And hey, check it out, the council has finally updated the user interface for its legislation database!
* Other than that, all is very quiet these days. Though those following my Twittering were apprised yesterday of this breaking news item: "[I] Dreamt last night that 3rd and K Market was reopening both as a bodega and a swank Indian food joint. With a new noodle place next door."
 

From a just-sent-out press release, more details on the "Luck of the Draw Art and Music Event" being put on by Artomatic, Pink Line Project, and the Capitol Riverfront BID in the neighborhood this weekend:
"Luck of the Draw will transform selected units, lounges, courtyards and the parking lots at Velocity Condominium, Axiom at Capitol Yards and Onyx on First residential buildings with photography, installation art, graffiti artists, live music, DJs and dancing to create a threeday neighborhood art and entertainment event. Start the night at the Velocity Condominium's entertainment tent on Half Street between L St and K St SE, and then head over to Axiom at Capitol Yards at 100 I (Eye) St SE and Onyx on First at 1100 First St SE. Draw playing cards at each location and, in traditional Washington, DC style, barter, trade and negotiate with others for the best 5-card poker hand to enter a raffle and win an iPod Nano. Beverages and snacks will be available at the venues as well."
It's free and open to the public. Hours are 6 pm to 10 pm on Friday and Saturday (the 13th and 14th) and 2pm to 6 pm on Sunday the 15th.
 

I've received a press release from ICP Partners, the folks who own the properties along Potomac Avenue between Eighth and Ninth (just north of M Street). Quoting: "The ICP Group, Inc. announces today that it will create an urban hotel index fund that will focus on developing and operating hotels in U.S emerging markets. As a benchmark, ICP has signed [letters of intent] with a couple of the largest hospitality companies in the world to evaluate the feasibility of developing and managing hotels in certain urban markets, including 820 Potomac Avenue in SE Washington, DC." This would be on the eastern part of the Potomac Avenue stretch of the block, the parking lot that wraps around onto Ninth Street. No word on who the hospitality companies are. Some may remember that this land (along with the building at Eighth and Potomac where Quizno's resides in the ground floor) was put up for sale in a sealed bid process back in December. More as I get it.
 

I took advantage of this beautiful February (!) day to grab some quick photos. First up are the action shots at Capitol Quarter, showing the brickwork underway on the southeast corner of 4th and L and the framing continuing on the north side.
And, for the first time since August, I've updated my views of the neighborhood from the SE Freeway. Clearly I'm out of practice because I kind of screwed up the angles, but you can still get the idea when you compare these new images to their "before"s. This is one of my favorite galleries, since I do have one grainy photo from 2000 (when 80 M was still under construction), and some others from 2005, before the vertical rush really began. You can also see that 1015 Half Street is about to really dominate the view, probably permanently obscuring the view of 55 M from the freeway. Remember to click the See All Photos of This Angle icon if you want to see all the photos between the "before" and now.
I also updated the one shot I have from the freeway at New Jersey; watch the progression from 2005 when Capitol Hill Tower was the dominant building through the construction of Onyx and now with 909 New Jersey and Velocity on display.
You can see all photos from today paired with their "before"s on one page, if you don't feel like clicking around and if you don't mind waiting a bit for it all to load.
(Alas, despite attempts to clean my lens just before taking these shots, they all look like they're being filtered through Vaseline. I'll just pretend I was being arty.)
 

Been kind of a nice few days here without much news, so now I'm having to force myself back into the routine. I'll start small:
* An update to the post about the new houses released at Capitol Quarter: EYA tells me that the houses released are spread throughout the development: 421 L Street, under construction and expected to be ready in April (listed for $720,340 on the EYA "Move In Now" list), two houses in the block just to the north (expected to be ready in the fall), and four houses in the block bounded by I/Virginia, Fifth, Fourth, and K that could be ready by the end of the year. On all of these blocks the reservations placed by homeowners over the past few years have now been converted to contracts; that is expected to happen for the final Phase 1 block (between Third and Fourth and Virginia and I) later this year.
* The agenda for Monday night's ANC 6D meeting is posted, and it includes a vote on the Phase 2 designs of the Yards Park that were discussed at last week's special meeting. I've also now added a bunch of those Phase 2 renderings to my Yards Park page. Other items on the ANC 6D agenda are about Southwest subjects, though I should note that the National Marathon on March 21 (which they'll be discussing) will be coming across the Douglass Bridge, briefly using South Capitol Street until it turns west on P Street.
There's also an agenda item about a BZA application for 1101 South Capitol St., SW, which was the old KFC. This is a good opportunity for me to mention that, with two blogs about Southwest now in full flight, I'm going back to my original boundaries, which old-timers will remember stopped in the median of South Capitol Street, which is where Southeast ends and Southwest begins. I'm lucky enough to be watching a neighborhood that has probably the firmest boundaries of any in the city, so I'm going to respect them!
* City budget season is nearly upon us. I've added to my calendar a partial list of dates for FY08-09 oversight and FY10 budget hearings, for agencies that have the most bearing on Near Southeast. Check the DC Council web site for the full list.
 

Two small tidbits:
* EYA sent out an e-mail today announcing that they are releasing "the final townhomes in Phase 1" at Capitol Quarter, with prices starting from the $630s. I don't know how many units are in this batch, or where in the Phase I blocks they're located. I'm pretty sure that a while back Phase 1 was billed as "sold out"--if I'm correct, these would be some houses originally reserved but now back on the market. (Buyer decides not to buy, buyer's credit worthiness tanks, etc. etc.)
UPDATE, 2/7: EYA tells me that the houses released are spread throughout the development: 421 L Street, under construction and expected to be ready in April (listed for $720,340 on the EYA "Move In Now" list), two houses in the block just to the north (expected to be ready in the fall), and four houses in the block bounded by I/Virginia, Fifth, Fourth, and K that could be ready by the end of the year. On all of these blocks the reservations placed by homeowners over the past few years have now been converted to contracts; that is expected to happen for the final Phase 1 block (between Third and Fourth and Virginia and I) later this year.
* From the Post calendar listings, word of a concert on Sunday Feb. 8 at the Marine Bachelor Enlisted Quarters. (This is the first time I've ever heard of a concert there, though it's more than possible that the news of previous ones didn't make it onto my radar.) Here's the particulars: "MARINE CHAMBER ENSEMBLE, performance of works by Libby Larsen, Telemann and Stravinsky; followed by a tour of the facility; light refreshments served. 2 p.m., Marine Barracks Annex, John Philip Sousa Band Hall, Seventh Street and Virginia Avenue SE. Free. 202-433-4011." (hat tip to reader S.)
 

The last item to summarize from Monday's ANC 6D presentation hearing was an update on the series of changes being requested to the Capper/Carrollsburg PUD. I've been writing about some portion of these requests since July, so here's some bullet points I've previously written (I just can't bring myself to have to compose new entries about this stuff AGAIN), along with comments from the ANC commissioners:
* Expanding the number of units at Capper: "There are five new apartment buildings slated to be built, three of which along the east side of Canal Park where the temporary parking lots are, and another at New Jersey and K on the trash transfer site. And there is a new plan for a fifth apartment building, on L Street across from the Marine Bachelor Enlisted Quarters (B.E.Q), on the northern portion of the old Capper Seniors footprint.
"Under the original Capper plans, there was to be a strip of 61 townhouses built on this spot, but the DC Housing Authority has recognized that these homes would be dwarfed by the B.E.Q. to the north and the two planned office buildings directly behind them at 600 M Street. So DCHA has now filed a request with the Zoning Commission to allow an expansion in the total number of housing units allowed at Capper to 1,747, which would allow the construction of a four-story 189-unit apartment building (with a massing very similar to the B.E.Q.) on this stretch of L Street known as Square 882N. This Zoning Commission request is also looking to expand the number of units in the planned apartment building on the south side of L Street between Second and Third (let's call it Square 769N) to 171 units[.]"
The ANC was told that the Square 769N building was originally designed to be a market-rate condo building only, but that financing realities have forced a switch to rentals. And because rental units can be smaller, they were able to not only add more than 60 units, but make 34 of those units public housing, allowing a lower proportion of public housing units in the other four apartment buildings while still maintaining the required Hope VI one-to-one replacement of the original 695 Capper public housing units.
As for the Square 882 buildings, the change to apartments from townhouses would require a boost in parking spaces from 49 to 172--but they are proposing to lower the total spaces at the office building from 400 to 284. This is part of a request to bring down the overall number of required parking spaces from 1,845 to 1,780, including the removal of the requirement for 70 off-site spaces for 400 M Street, which have been determined to be unnecessary.
(Note that the Square 769 and Square 882 issues before the Zoning Commission are technically a PUD second-stage review.)
* Time Extensions: "There were also requests for three time extensions: to extend the first-stage PUD for an additional five years, to extend the deadline for filing second-stage approvals for the apartment building sites along Canal Park (including the trash-transfer station site) to 2013, and to extend the deadline for filing a building permit application for the planned community center at Fifth and K to January 2011, with an included extension of the start of construction to January 2012."
Commissioner Bob Siegel in particular is very unhappy about the delay in the community center construction, saying that the senior residents of 900 5th Street need an exercise room and other amenities. But he was told that, simply, the community center is unfinanceable right now.
And Commissioner Ron McBee wants to revisit the community benefits that were agreed to in the original Capper PUD, asking the presenters to get him a list of those benefits--I can do it for them, by pointing to pages 12-14 of the 2004 zoning order.
The Zoning Commission will be hearing all these items on March 19. You can see the hearing notice for the zoning-related specifics on the three cases
 

Just out from WMATA: "A public hearing will be held on Thursday, February 19, to receive the public's input on the proposed elimination of Metrobus route N22, the Navy Yard shuttle service, with that service switching to the DC Circulator. The public hearing will begin at 6:30 p.m., at Metro's headquarters, 600 5th Street, NW, Washington, D.C." Why? "The District Columbia Department of Transportation (DDOT) notified Metro of its intent to transfer operation of Metrobus route N22 to the DC Circulator effective March 29, 2009. Therefore, it is proposed to discontinue Metrobus service on route N22 so that DDOT can transfer the funds to a new DC Circulator route that would serve the Navy Yard - Union Station area. Details of the proposed DC Circulator route are being developed by DDOT." See my previous posts on this switch from N22 to Circulator for more information and background. See the Metro release for information on how to be a witness if you wish to testify.
Comments (0)
More posts: circulator, Metro/WMATA
 

Feb 4, 2009 8:49 AM
A couple small things from the past few days:
* For the second time in eight years, Capitol Quarter's EYA has been named America's Best Builder by Builder Magazine, which cited "its commitment to high-quality design, building in areas featuring life within walking distance, and industry leading results on homebuyer satisfaction and referral sales."
* From WTOP, news that the current occupants of the encampment at First and M are seeing the tab for their move escalate a touch: "The estimated cost of building a sprawling new complex at Fort Belvoir to house [the National Geospatial-Intelligence Agency] and its 8,500-strong work force will be $350 million more than prior estimates, according to a report from government auditors." It's mandated that they have to be moved into their new digs by September 2011, but the GAO report "warned that the agency's small window for delays means that 'any unmitigated disruptions can jeopardize' meeting the 2011 deadline." The price tag is now $2.44 billion.
* Today's Examiner has another installment of their Three-Minute Interview series, this time with, um, me. (Nationals historians might enjoy knowing that the accompanying photo [better non-cropped version here] was taken the night the team came home from spring training to see their completed ballpark for the first time.)
 

Feb 3, 2009 4:47 PM
With great thanks to reader G. for passing this along, I can report that the newly released Google Earth 5.0 (beta, of course) now includes an option to page back through older satellite photos. As you might imagine, I raced to see what they had for Near Southeast, and found a not-razor-sharp 1949 image, which you can see on my Near Southeast Satellite Photos page if you don't have Google Earth.
You might enjoy the "Where's Waldo?" test of looking for buildings you recognize, such as the Southeastern Bus Garage, the WASA buildings, and even that big brick warehouse at South Capitol and O that was demolished to make way for the ballpark. Things that *aren't* there: the Southeast Freeway (built in the 1960s), the second span of the 11th Street Bridges, a completed Douglass Bridge, and many of the Capper buildings that came in the 1950s. You'll also see how packed with buildings the Navy Yard was, especially since this was still during the time that its boundaries stretched all the way to First Street (across what is now The Yards). And look at how, north of Virginia Avenue, Garfield Park was bisected by Second Street.
The other image offerings from Near Southeast are mostly variants on the ones I already have on my satellite photos page that came from non-Google sources over the years (1988, 2002, 2004, 2006, 2007), though there are a few extras from the later years where the quality of the image isn't all that good.
If this is whetting your appetite, I also have a batch of non-satellite historic photos of the neighborhood you can wander through, along with detailed street maps from 1903 through 1921.
UPDATE: Commenter MJM rightly reminds me of a fact that an American History major such as myself should have remembered: Sputnik was the first *satellite*, launched in 1957. So these overhead images from 1949 are not satellite images, but were taken from planes. Or they attached a camera to Superman and had him fly around the globe a few times.
 

Feb 3, 2009 10:32 AM
ANC 6D heard a presentation on Monday night from the team working on the South Capitol Street Environmental Impact Statement, which is now in its "final preferred alternative" stage. Their PowerPoint presentation was pretty close to the one I posted last month, and one of the consultants did tweak me a bit about how I "spoiled the surprise" on the choice of the arched bascule design for the new Douglass Bridge.
Here again are the (long!) bullet points about what the preferred alternative designs are for the portion of South Capitol west of the Anacostia (see the presentation if you're interested in the preferred alternatives chosen for east of the river), along with some issues raised by the ANC:
* It was emphasized that these new designs will not be adding any capacity, but that the main goal is to bring back the "boulevard" feeling of the corridor.
* The new bridge will have 20-foot-wide sidewalks on each side, and only two piers will need to be built in the river, compared to 3-5 piers that would have been needed with the other designs. (The cable stayed swing bridge would have had just one pedestrian/bike path, 16 feet wide, in the middle of the bridge, surrounded by six lanes of traffic.)
* There will be a seven-acre traffic oval at the foot of the new bridge (which will be located to the south of the current bridge), reshaping the intersection of South Capitol Street and Potomac Avenue. (The ballpark's Home Plate Gate and entrance promenade will be the northeast edge of the oval.) The city is already in the process of acquiring seven properties or portions of properties that will be needed for the oval and bridge footprint, including the red brick warehouse on the northwest corner of South Capitol and Potomac. This oval is on the NCPC list of locations for future memorials and museums.
* The intersection of South Capitol Street and M Street will become an at-grade intersection (no more underpass for through traffic). ANC chair Andy Litsky expressed great concern about how this could make the intersection even more dangerous than it already is, to which the DDOT team replied that the reconfiguration should make it safer. (Certainly it would seem that having a "normal" intersection with two left-turn lanes in most directions would be an improvement safety-wise over the existing mish-mash of lights and poorly striped turn-lanes, but then there will also be a lot more cars cycling through once the tunnel lanes are gone.)
* There will be modifications to South Capitol's interchange with the SE/SW Freeway, with the replacement of the ramp that begins at I Street with an at-grade intersection underneath the freeway that would have two left-turn lanes to a new ramp. With the existing ramp removed, the intersection at South Capitol and I would also be reconfigured.
* The northern section of South Capitol Street will match the reconfigured portion between N Street and Potomac Avenue, as a six-lane boulevard with a median and wide sidewalks.
Commissioners McBee and Moffatt asked as they have in the past about whether the existing bridge could be kept as a pedestrian/bike-only bridge, but DDOT explained that since the swing span would continue to need to be opened for river traffic, the cost of maintaining the old bridge just isn't feasible. (The RiverFront folks might also be a teensy bit upset that their land that's beneath the current bridge wouldn't be coming back to them.) And the team also indicated that this new bridge does not preclude the construction (Some Day, Perhaps, in Some Far Off Time) of a tunnel to move non-local traffic from Anacostia to I-395.
They expect the final Record of Decision from the feds this fall; however, when pressed for a start date, they said 2011 would be the absolute earliest for the start of construction (with completion possibly in 2015), but that as of now there's no funding for the $700 million project. It's also possible that portions of the designs could be undetaken if partial funding is received.
 

Feb 2, 2009 11:00 PM
Tonight ANC 6D had a special "presentation" meeting, to lighten the load of next Monday's business meeting so that everyone could go home before 2 am. On the agenda were three items, all of which are JDLand perennials. I'll post on Tuesday about the Capper zoning stuff and the South Capitol Street EIS, which didn't really contain much that I haven't previously covered; the third item was the designs for the second phase of the waterfront park at the Yards.
The first phase, which is expected to begin construction in the next three months and be completed by mid-2010, is the basic layout of the park and the boardwalks. The second phase comprises 55,000 square feet of retail in the to-be-rehabbed Lumber Storage Shed and two new buildings, as well as a 60-foot-tall "visual marker" (seen at left) just to the southwest of the shed. (The third phase will be the piers and marina.) I was dreading coming home to describe these latest plans with no renderings to accompany my ramblings, but then I found the National Capital Planning Commission has done all my work for me, thanks to these phase 2 designs being in front of the commission at their meeting this Thursday (and for which the NCPC staff has recommended approval). You can see all of the drawings presented to the ANC in this NCPC document, along with a lot of description of the designs, but I'll hit some highlights.
The "light tower," designed by James Carpenter Design Associates, is made up of stainless steel prisms that reflect light during the day and will be subtly illuminated at night. The top is actually 70 feet from the top of the water, but 10 feet of that is the boardwalk; the structure itself is only 60 feet high.
The storage shed, as I've mentioned in the past, will lose its faaaahbulous salmon-colored corregated skin and will be enclosed with non-reflective glass. The other two buildings (currently given the wonderfully descriptive monikers of P2A and P2B) will also be mainly glass structures. There will be a restaurant court in front of the center building, overlooking the area of the park that steps down toward the waterfront. (A drawing of the three buildings' southern facades is here; a larger version of the rendering at right showing how the buildings are not at all dominant when viewed from the waterfront is here. See the NCPC document for additional views.)
The questions from the ANC commissioners included whether this public park financed by public dollars and owned by the city would be open to the public, whether there would be preferences for ANC 6D-based businesses for the retail spaces and the six kiosks planned near the light tower, and if there would be any city-controlled vending spaces in the park.
The designs will be presented to the Zoning Commission on March 2 (there are also some exceptions and/or variances being requested). The ANC will presumably be voting on whether or not to support the project at its Feb. 9 meeting.
 

Jan 30, 2009 12:57 PM
Some little items to head into the weekend:
* The Capitol Riverfront BID is going with a Best of the 80s theme for its Riverfront Reel summer outdoor movie series, and has a survey up to determine the most popular flicks. (Though let me just say that the omission of Die Hard has me white with rage....)
* DDOT is holding an "Anacostia Waterfront Forum" on Feb. 17 at the MLK Library at 6:30 pm, "on the role that replacing the 11th Street Bridges will have in creating a more inclusive and sustainable Distrct."
* Also from the BID, news that the Earth Conservation Corps has scheduled a dedication ceremony for Diamond Teague Park on April 28. I've been told that if all goes "as planned," the construction of the in-water structures (the docks and the piers) should be completed by Opening Day, though the plantings and other work on the dry-land portion of the park would be completed by the beginning of July.
* Greater Greater Washington is not happy that the US DOT is having a "sale" on its parking spaces.
* City Paper's Housing Complex blog is bewildered about where this Capitol Quarter "neighborhood" might possibly be. (Teh Google probably could have answered that.)
* The US Department of Justice and some Shell Oil entities are nearing a $2.1 million settlement for damages and cleanup costs at the Southeast Federal Center (now the Yards) after what the feds allege was benzene, toluene, ethylbenzene and xylene contamination of soil and groundwater "from leaking underground storage tanks located at a former filling station adjacent to the contamination."
* I did attend last night's zoning hearing on Akridge's Half Street project, and will post a summary when I recover from the nearly four-hour session. But I did hear that the bus garage on the site will be demolished pretty soon, to make way for temporary parking. Both Akridge and Monument are talking with the Nationals about providing their spaces for gameday parking. (Monument has told me that their underground garage at 55 M--and the little addition to the south--will be complete by Opening Day.) That's a lot of spaces that weren't around last year....
* DCRA has restarted the Building Permits feed. And there was much rejoicing.
 
2021 Posts:
Go to Page: 1 | ... 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 ... 203
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.