Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Monument Valley/Half St.
See JDLand's Monument Valley/Half St. Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


186 Blog Posts Since 2003
Go to Page: 1 | ... 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 ... 19
Search JDLand Blog Posts by Date or Category

I believe it's only available to subscribers, but if you've got any way to get your hands on this week's Washington Business Journal, you'll probably want to see the quarterly magazine "On Site" that's included--seven stories on development around the ballpark, as well as a big map showing all the plans over the next few years (what a great idea!). Stories on Monument Realty and on the plans for The Yards, an interview with Michael Stevens of the BID ("Preaching Patience in Washington Nationals' New Neighborhood"), a piece highlighting how residential developers are feeling bullish about the area, and even a short profile of some pesky neighborhood blogger who's been tracking the area since 2003. I haven't read all the stories yet (it's gonna take a while!), so if I find some nuggets that I haven't covered here in the past, I'll post them.
UPDATE: Also, the March issue of Washingtonian is hitting the stands (though the articles won't be online for a while), with articles on the ballpark and also on the planned residential projects nearby.
Comments (0)
More posts: Monument Valley/Half St., staddis, Nationals Park, The Yards
 

While hopefully you've already wandered through the pile of new stadium exterior photos I posted over the weekend, those aren't the only new pictures I grabbed during my camera time on Saturday and Sunday. Get your clicking finger going:
* The Velocity condo phase 1 building on L Street west of First is now one floor out of the ground, so that will now be added to my regular rotation of photo updates. For those who haven't been following along, this is a 200-unit condo building that will eventually be joined by a twin on the north side of the block (running along K Street). However, they decided to dig the entire parking garage and below-ground structures for both buildings at once, which is why only half the block is now rising above ground level. The other portion will be landscaped over until Phase 2 begins. (Phase 3, which will run along Half Street where the sales center is now located, could be either an office building or a hotel--I haven't heard of any decision being announced.)
* The Normandie-less corner at First and M has now been immortalized in digital imagery, and goodness gracious, has that spot changed. (Ditto for the other end of the block, at First and N.) This stretch is on its way to becoming temporary surface parking until Willco Construction moves forward with its reported office/residential/retail project on that site (no timeline).
* The road work on First Street continues, and on Saturday they put down the first asphalt between L and M (in front of Onyx and 100 M). Looking south and north you can see how much wider the street has now become. You can also see the windows starting to be hung at Onyx and at 100 M. Meanwhile, First north of L continues to be a war zone. They *say* it'll all be done (I Street, too) by Opening Day. First Street and Potomac Avenue appear to be pretty much done except for the striping.
* 55 M is almost topped out. As we heard a few days ago, they say the Metro entrance in 55 M's ground floor will be ready by Opening Day, too.
* How much has M Street changed in five years? Take a look. (This should be one of those list-the-differences-in-the-pictures contests.)
* Or you can just look at all the photos from Saturday and Sunday on one page (including the ballpark shots), though I cannot be held responsible for any sensory overload you may experience. Imagine how I feel, especially considering that what I've posted is probably only about a third of the photos I actually took....
 

Last night ANC 6D held a special public meeting to decide whether or not to support Tommy Wells' Performance Parking bill when it has its council hearing on Wednesday. I was unable to attend, but reports from my vast network of moles indicate that the ANC will be supporting the bill, albeit it while "expressing strong concern" over some still-outstanding issues. (We'll find out what those are during Andy Litsky's testimony at the hearing.) The ANC vote was 4-2.
At almost the same time, the Zoning Commission held a brief special public meeting to take up the series of minor modifications that Monument Realty requested to its design for the east side of Half Street (yes, the area that's already under construction). I talked about these in slightly more detail a few weeks ago when this first came to the Zoning Commission; the ZC declined to approve these as part of its consent agenda at that meeting because the commissioners wanted a little bit more clarification, which they got in the filings for this second hearing. The only question that came from the dais was why Metro nixed the wire mesh panels with LED lights that Monument had originally envisioned as the walls around the Navy Yard station entrance at Half and M--the reply was that, in addition to weatherproofing concerns, Metro wanted its security people to be able to see into the station by shining a light from a car on the street, instead of having to go into the station. The wire mesh is now being replaced with a glass "frit" (yes, I had to look it up, too) that will be backlit with the lighting scheme Monument wants. With that, the commission approved the request 5-0; all the minor modifications are explained in the Office of Planning report.
Comments (0)
More posts: ANC News, Monument Valley/Half St., parking, staddis, Nationals Park, zoning
 

I wandered around on Sunday for a photo session, wishing that spring would hurry up and get here so that the sun will rise higher during the day and set farther west so that I can stop dealing with the damn glare whenever I face southward.
* I have new images along N Street just north of the ballpark between Half and First, which show the work at the entrance plaza at Half Street, including glass now being installed on the ground floor of the western parking garage, as well as the structures that will make up the entrance gates.
* In fact, I updated all 12 angles of the Half and N intersection, which now that it has its new wide sidewalks, curbs, streetlights, and an initial paving job, is really a stunning testament to 24 months of change, not only on the four corners of Half and N but the blocks to the north as well. It's definitely worth a look.
* I took a lot of photos of the now-demolished Willco stretch along First Street (and gave the project its own page as well), and of course I got all the usual angles of 55 M Street.
* On Half Street between I and K, where JPI's 23 I Street residential project is expected to start this year, a pile of red-and-black advertising banners have been hung on every available surface, and a "JPI Permit Parking only" sign has appeared on the entrance to the former towing company's parking lot on that block. I'm guessing JPI's purchase of the property just closed. I haven't heard anything about potential start dates for this project, or when the Wendy's might close.
* If you browse all the photos I took yesterday, you'll also see a smattering of 70/100 I and 100 M shots as well as images of the two blocks along Third Street where temporary surface parking lots are going in (so now my pictures of those blocks have changed from post-demolition views of nothing to pre-blacktop views of nothing). And the always popular shots from the SE Freeway at South Capitol are updated, too.
And don't forget to click on the icon wherever you see it to see all photos in the archive of a certain location.
 

This week's Ballpark and Beyond column is a shortened summary of last week's ANC 6D meeting; but here's the links to my more detailed reports on the what transpired at that meeting with 1111 New Jersey, an alley closing request by Monument Realty, and Florida Rock.
And, since it's been a busy week, you might have missed my 2008 State of the Hood, which rises above all the daily minutaie to look at what's happened in Near Southeast in the last 12 months and what's coming in 2008; if you're coming late to the party and are looking for an overview, take a few moments to browse it.
Comments (0)
More posts: 1111 New Jersey/Insignia on M, ANC News, Florida Rock, Monument Valley/Half St., Square 743N
 

I braved the chilly temps and gusty winds on Sunday morning for what turned out to be an abbreviated venture to get some updated photos. (I didn't post them yesterday because I thought I might go out this afternoon to get more, but it's a holiday, it's still cold, I'm pretty warm and cozy here on the sofa, and, and, and....) You'll see some shots of the demolition along First Street on the Willco site (which is about 50 percent completed), as well as a few updated shots of the ballpark, some of which show that the steps are now being poured on the grand staircase. There's also a smattering of shots of 55 M, 100 M, 70/100 I, and the at-ground-level Velocity construction, and some other vantage points that I got before high-tailing back indoors.
You can see the complete batch of photos, remembering to click on the icon if you want to see all archived photos of a certain view.
This is a good time to mention that I recently made a few changes to the Photo Archive. First, you'll now see links that allow you to toggle between seeing all photos of an angle and just the oldest and newest, which comes in handy as the number of photos continue to escalate. And, because the archive is getting pretty big, I've changed the default for when you choose to look at all angles of an intersection to show just the oldest and newest of each angle--you can then choose to see all photos for a specific angle.
Comments (0)
More posts: 100 M, 55 M St., 70/100 I, jpi, Monument Valley/Half St., Square 743N, staddis, Nationals Park, Square 701
 

At Monday night's ANC 6D meeting, Monument Realty presented its request for the ANC's support in closing a 2,417-square-foot alley that runs between South Capitol and Van streets not far north of N Street. This alley is north of the now-closed BP Amoco and south of what is now a WMATA employee parking lot on land owned by Monument (there used to be a neon yellow bungalow there, until late 2006). Christy Shiker of Holland & Knight told the commissioners that the Amoco property--which faces the ballpark's western parking garage--is too small to develop on its own, but with the alley closed and the lots combined, Monument would build a 130-foot-high residential building with approximately 150 to 200 units plus 14,000 square feet of ground-floor (or perhaps two-story) retail. Monument is not committing at this time to pursuing LEED certification for this building.
Shiker then described the community benefits package that Monument was offering to the ANC in return for the loss of this public space, including a $50,000 contribution to the community fund, the retail, First Source employment preferences, and an affordable housing component that would match whatever is called for whenever the city's Inclusionary Zoning mandates are finally hammered out. Monument would also work toward agreements on ANC6D resident preferences, to be determined with the ANC at a later date.
This became a sticking point, with Commissioner David Sobelsohn concerned about giving the ANC's support for this project merely on promises to make agreements later. Shiker pointed out that Monument has made these agreements before for their other Ballpark District projects, and also that the ANC will have another crack at the project when down the road it undergoes its mandatory Capitol Gateway Overlay Review. But Sobelsohn still felt that the ANC was being handed a "take it or leave it" proposition.
An audience member asked if Monument would be planning to build a temporary parking lot if the alley closing is approved, but Shiker said that Monument's goal is to develop the land, that they "want a building, not a parking lot." (Though one must admit that that is some pretty plum stadium-parking territory.) There were also questions about the Public Space Storage building just to the north (echoing my WTDW entry from last week), but Monument's representatives said that they didn't think the storage company would be moving.
Commissioner Bob Siegel moved to support the alley closing with further negotiations on the proposed benefits package as the project proceeds, but the ANC voted 2-2-1 and so the resolution did not pass.
The alley closing bill is B17-0552, and Shiker told the ANC that she expected a public hearing in late February, with perhaps council action in March or April. No date for actual construction of the project was mentioned.
Coming tomorrow--a recap of the Florida Rock portion of the ANC meeting, though you don't have to wait until then to see the latest project renderings that were presented. But my long-winded summary of what was said during the meeting will have to wait a bit longer.
Comments (0)
More posts: 1221 Van, ANC News, Metro/WMATA, Monument Valley/Half St., Monument/South Capitol St., zoning
 

The official announcement will come soon, but Monument Realty has confirmed to me that today they are turning over to WMATA the west entrance of the Navy Yard Metro station --on schedule--so that "fare installation" can begin (i.e., making the entrance useable). Monument says they completed their building structural commitments to WMATA back on Dec. 21. (hat tip to Nats320)
If you look at the Half Street web cam, you can see that the station entrance at lower center does look like it's getting cleaned up somewhat. Monument's initial Half Street project--office, hotel, residential, retail--is not scheduled to be completed until the end of 2009, but the Metro station is expected to be reopened in time for the beginning of baseball. The 55 M Street office building is currently being built on top of the Metro entrance; the southern half of the block, which is currently a big hole but where a hotel and residential units will be offered, should see construction begin soon. Retail will line the ground floor (and some second-floor spaces) all along Half. No tenants have been announced yet for the retail spaces, and, as I mentioned this morning, Monument appears to be looking for a new chain to operate the 200-room hotel.
As for what Half Street will look like during the inaugural season of the ballpark while construction continues, the Office of Planning report on Monument's request for some minor modifications to their Half Street designs has a description: "As part of the original proposal, the applicant showed a covered walkway on the east side of Half Street as a temporary condition during construction. Present plans call for pedestrian traffic to be directed to the other side of Half Street on non-game days, and for the entire street to be opened to pedestrian traffic on game days. Therefore there is no need for a covered walkway. The applicant has committed, however, to maintain a decorative fence at the edge of their construction zone as generally shown in the original plans."
Comments (0)
More posts: 55 M St., Metro/WMATA, Monument Valley/Half St., staddis, Nationals Park, zoning
 

On Monday night the Zoning Commission considered two Near Southeast cases on its consent calendar. I wasn't there (having chosen to go to the ANC meeting scheduled for the same time), and the ZC's web feed experienced technical difficulties, so I'm posting some bare bones info that folks at the meeting have been nice enough to pass along.
Monument Realty asked for 22 "minor modifications" to its previously approved design for the under-construction eastern side of Half Street. According to the Office of Planning report, the changes mostly centered on adjustments to the exterior architecture and the layout of the residential component. The most noteworthy change request is probably switching from a multicolored LED screen at the Metro entrance at Half and M (which WMATA turned down, apparently) to a backlit laminated glass panel. Also, nestled deep in the OP report is a request to modify the design for the hotel windows because the "hotel operator has pulled out" -- early on, the word had been that W Aloft would be running the midblock hotel on Half Street, but apparently this is no longer the case; I've heard nothing on any new operator. You can read the report to see the other requested changes. Though this was on the Zoning Commission's consent calendar, and the commission acknowledged that the changes are small, they still wanted to see some renderings showing the befores-and-afters of the proposed changes, and have scheduled a special public meeting for Jan. 28 at 6 pm to consider the request.
Now that the eastern side of Second Street (running along Canal Park) is considered "re-opened" (it's a long story), the developers of 250 M Street are requesting to base the office building's height on the width of Second Street, which is wider than M Street. This would allow 250 M to go up to 130 feet, which apparently is the same as the height of 1100 New Jersey on the west side of the park, although apparently the building's planned square footage would actually decrease slightly which would increase the total square footage to 233,405. Though this was on the consent calendar, the commission asked the Office of Planning to submit a report on this, and there will be a public hearing.
UPDATED to fix an error about 250 M's proposed new square footage.
Comments (0)
More posts: 250 M/New DDOT HQ, Metro/WMATA, Monument Valley/Half St., staddis, zoning
 

Having pledged to pace myself a bit better over the next three months so that I don't have to cover Opening Day from a padded room, I'll be posting the results of Monday night's ANC 6D and Zoning Commission meetings in drips and drabs over the next few days. So stay tuned, especially if you're interested in Florida Rock, or Diamond Teague Park, or Monument Realty's projects north of the ballpark, or 1111 New Jersey, or 250 M Street.
This of course means that all the local media outlets checking in at JDLand looking for leads and tips will have to wait too. (The information is all free, of course, but some small hat tip some day would be nice. Although I do enjoy being an assignment editor of sorts....)
 
186 Posts:
Go to Page: 1 | ... 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 ... 19
Search JDLand Blog Posts by Date or Category